NPL-95-0329, Forwards Four-YR Performance Test Rept
| ML20086N097 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/19/1995 |
| From: | Krieser G WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20086N103 | List: |
| References | |
| NPL-95-0329, NPL-95-329, NUDOCS 9507250112 | |
| Download: ML20086N097 (1) | |
Text
,e '
1 Wisconsin Electnc POWER COMPANY 231 W Michigan PO. Box 2046. Mdwoukee WI 53201 2046 (414)221-2345 1
July 19, 1995 10 CFR 50.45 NPL 95-0329 Director, Office of Nuclear Reactor Regulation Document Control Desk U.S.
NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washin:Jton, D.C.
20555
Dear Sir:
DOCKETS 50-266 AND 50-301 FOUR-YEAR PERFORMANCE TEST REPORT REOUIRED BY 10 CFR 55.4 5(b) (5) (ii)
POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 In accordance with 10 CFR 55.45(b) (5) (ii), Wisconsin Electric hereby submits the Point Beach Nuclear Plant Simulation Facility four-year report.
The attached report applies to the simulation facility at Point Beach Nuclear Plant for Units 1 and 2.
The attached report describes certification program tests conducted from 1992 to 1995, identifies test discrepancies still outstanding, and provides a certification test schedule for 1996 though 1999, which meets the requirements of $55.45(b) (5) (iv).
There are currently no uncorrected performance test failures.
If you have any questions regarding this' submittal, please contact us.
Sincerely, Gary M. Krieser Man er Nuclear Industry Services Attachment CAC/ cms cc:
NRC Regional Administrator NRC Resident Inspector 9507250112 950719 PDR ADOCK 05000266 i
P PDR A suMfan ofIWvasin EneqvQvywathw 1