,e '

1 Wisconsin Electnc POWER COMPANY 231 W Michigan PO. Box 2046. Mdwoukee WI 53201 2046 (414)221-2345 1

July 19, 1995 10 CFR 50.45 NPL 95-0329 Director, Office of Nuclear Reactor Regulation Document Control Desk U.S.

NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washin:Jton, D.C.

20555

Dear Sir:

DOCKETS 50-266 AND 50-301 FOUR-YEAR PERFORMANCE TEST REPORT REOUIRED BY 10 CFR 55.4 5(b) (5) (ii)

POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 In accordance with 10 CFR 55.45(b) (5) (ii), Wisconsin Electric hereby submits the Point Beach Nuclear Plant Simulation Facility four-year report.

The attached report applies to the simulation facility at Point Beach Nuclear Plant for Units 1 and 2.

The attached report describes certification program tests conducted from 1992 to 1995, identifies test discrepancies still outstanding, and provides a certification test schedule for 1996 though 1999, which meets the requirements of $55.45(b) (5) (iv).

There are currently no uncorrected performance test failures.

If you have any questions regarding this' submittal, please contact us.

Sincerely, Gary M. Krieser Man er Nuclear Industry Services Attachment CAC/ cms cc:

NRC Regional Administrator NRC Resident Inspector 9507250112 950719 PDR ADOCK 05000266 i

P PDR A suMfan ofIWvasin EneqvQvywathw 1