Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079N113 + (Forwards App B,Comparison of Special Lifting Device Design to ANSI N14.6-1978, Per 830729 Response to NUREG-0612, Control of Heavy Loads at Nuclear Power Plants)
- ML20234E440 + (Forwards App B,Rev 1 to Industrial Security Manual.App B Describes Temporary Security Measures Employed During Const of Administration & Training Facility.App B Will Be in Effect Until End of Dec 1987.Encl Withheld (Ref 10CFR73.21))
- ML19282C586 + (Forwards App BJNPQ-201 to BJNPQ-101 Re C-E Sys 80)
- ML19323F211 + (Forwards App C of Mountain West Research Inc 800507 Response to People Against Nuclear Energy.App C Is Specifically Related to Interrogatory 12)
- ML19323F213 + (Forwards App C of Responses to Interrogatories.Consists of Telephone Survey Forms for Evaluation of Effect of Incident on Local Residents)
- ML20055A632 + (Forwards App C to IE Emergency Appraisal Insp Repts 50-313/81-22 & 50-368/81-21,consisting of Emergency Plan Evaluation Rept)
- ML20042C482 + (Forwards App C to IE Emergency Preparedness Appraisal Rept 50-309/81-21.Page Changes to Plan Correcting Deficiencies Noted or Justification as to Why Revision Should Not Be Made Should Be Submitted within 120 Days)
- ML17331A586 + (Forwards App C to Modified Amended Security Plan in Response to .Plan Withheld (Ref 10CFR2.790))
- ML20213G713 + (Forwards App C to Plant Industrial Security Manual, Describing Temporary Security Measures Employed During Const Associated W/Expansion of Existing Security Bldg.App Withheld (Ref 10CFR73.21))
- ML17249A288 + (Forwards App C to QA Manual Re Revised Inservice Pump & Valve Testing Program for May 1979-Dec 1980)
- ML17249A289 + (Forwards App C to QA Manual Re Revised Inservice Pump & Valve Testing Program for May 1979-Dec 1980)
- ML20133A190 + (Forwards App C,Bwr Core Spray Internals Demonstration of Compliance W/Technical Infor Requirements of License Renewal Rule (10CFR54.21) & Flaw Evaluation Guidelines (BWRVIP-18). Encl Withheld)
- ML19199A197 + (Forwards App C,License Safeguards Contingency Plan. Encl Withheld (Ref 10CFR2.790))
- ML20239A080 + (Forwards App D 221 Facility Operating License TS Amend Implementation Sheet Faxed from Duke Energy Corp.Document Signifies Implementation of Operating License Amend 169 for Unit 1 & 161 for Unit 2 on 980902)
- ML20052B062 + (Forwards App D as Part of Renewal Application for License SNM-1174,containing Annual Operating Rept for 1982,including Financial Info)
- ML20052A749 + (Forwards App D as Part of Renewal Application for License SNM-928.App D Contains 1981 Annual Rept.W/O Encl)
- ML20149M689 + (Forwards App D of EGG-PHY-7787, Evaluation of Changes to Offsite Dose Calculation Manual. Util Required to Address Deficiencies Noted in Section 4)
- ML20078A627 + (Forwards App F, Inspector Qualification of Vogtle Unit 2 Readiness Review Program for Review & Acceptance)
- ML20128M924 + (Forwards App G to Consensus Summary on Direct Heating)
- ML20136A682 + (Forwards App H Exemption to Allow Facility Operation During Cycle 2 W/All Six Surveillance Capsules Removed.Refuses to Concur in Exemption Until Safety Evaluation of Thermal Surveillance & NRC Findings Are Resolved.W/O Encl)
- ML19331A141 + (Forwards App H in Response to DOJ 730212 Request for Admissions & Interrogatories Re 730212 Proposed Contentions. Pages 2 of App E Inadvertently Omitted from Request as Originally Served Also Encl)
- ML20236L672 + (Forwards App I Analysis,Palisades Plant, Per 10CFR50 App I & Proposed Tech Specs Re Design Objectives & Limiting Conditions for Operation ALARA for Radioactive Matl in light-water-cooled Reactor Effluents)
- ML20238C888 + (Forwards App I Evaluation Rept for Calvert Cliffs Nuclear Power Plant, .Rept Also Includes All of Info Submitted in Util)
- ML17325B790 + (Forwards App I Evaluation Rept:Calvert Cliffs Nuclear Power Plant, Dtd 761001,for Entry Into Document Control Sys)
- ML20238C866 + (Forwards App I Evaluation Rept:Calvert Cliffs Nuclear Power Plant, Dtd 761001,for Entry Into Pdr.Record Copy)
- ML20091A946 + (Forwards App I Filing,Per 760223 Request)
- ML19329B063 + (Forwards App I Model Tech Specs to Provide Guidance in Areas of Equipment & Administrative Requirements,If Limiting Condition for Operation Cannot Be Met.Requests License Amend Application to Incorporate Specs)
- ML19329F339 + (Forwards App I Model Tech Specs.Model Specs Intended to Provide Guidance in Types of Required Specs Re Equipment & Administrative Requirements.Requets Submittal of Proposed App I Tech Specs within Number of Days Indicated)
- ML20127H593 + (Forwards App I Model Tss,To Provide Reasonable Assurance That Requirements of 10CFR50,app I Are Implemented at All Nuclear Power Facilities)
- ML19338E826 + (Forwards App I Suppl Info Re TLD Map Locations,Onsite Monitoring Capabilities (Tld/Ion Chamber),Drawings of TMI-1, Restart Rept Figure 7-1 & Determination of Max Permissible Concentrations for Xe-133 & Xe-135 in Water)
- ML19259C890 + (Forwards App I to QA Program,Inadvertently Omitted from)
- ML20234D617 + (Forwards App I, Pressure/Suppression Test Program, App II, Pressure Suppression Design & marked-up Plan & Station Section Showing Segment of Suppression Pool Which Was Tested full-scale.Telcon Re 620816-17 Meeting Requested)
- ML20210G626 + (Forwards App I,Inadvertently Omitted from 990624 Response to TAC M99844)
- ML20041C863 + (Forwards App II to Safe Shutdown Analysis:Response to 10CFR50,App R,Fire Protection of Safe Shutdown Capability. Requests Exemption from 10CFR50,App R,Section Iii.G for Specific Fire Areas Listed)
- ML20209G356 + (Forwards App II to Writers Guide for Emergency Operating Procedures, Per 870112 Telcon Re Facilities Procedure Generation Package Currently Under Review)
- GO2-82-942, Forwards App J to FSAR, Shielding Evaluation Rept + (Forwards App J to FSAR, Shielding Evaluation Rept)
- ML17298A409 + (Forwards App J to, Evaluation of Pressurized Thermal Shock Effects Due to Small Break LOCAs W/Loss of Feedwater for Palo Verde 1 & 2,2 & 3 Reactor Vessels. Rept Applies to Only Unit 1)
- ML20078B682 + (Forwards App M to Harstead Engineering Assoc Rept Distributed on 830920.Svc List Encl.W/O App M.Related Correspondence)
- ML20141H581 + (Forwards App R & Fire Protection Self Assessment, to Inform NRC of Broad Scope of Fire Protection Activities Related to Review of Corrective Actions for Fire Protection Program,As Discussed During 970714 Enforcement Conference)
- LIC-97-0119, Forwards App R & Fire Protection Self Assessment, to Inform NRC of Broad Scope of Fire Protection Activities Related to Review of Corrective Actions for Fire Protection Program,As Discussed During 970714 Enforcement Conference + (Forwards App R & Fire Protection Self Assessment, to Inform NRC of Broad Scope of Fire Protection Activities Related to Review of Corrective Actions for Fire Protection Program,As Discussed During 970714 Enforcement Conference)
- ML20080C831 + (Forwards App R - Fire Protection Alternative Shutdown Capability Assessment,Second Quarterly Rept)
- ML20078R640 + (Forwards App R - Fire Protection:Alternative Shutdown Capability Assessment, Quarterly Rept,Per NRC 830727 Directive)
- ML17255A624 + (Forwards App R Alternative Shutdown Sys. New Shutdown Approach Provides Fewer Mods & Allows Phased Implementation as Opposed to Installation of Required Dedicated Shutdown Sys)
- PY-CEI-NRR-0412, Forwards App R Deviation Request,Representing Modified Plant Configuration Since Submittal of 850612 Deviations Package. Rev to Index Table of Deviations Also Encl + (Forwards App R Deviation Request,Representing Modified Plant Configuration Since Submittal of 850612 Deviations Package. Rev to Index Table of Deviations Also Encl)
- ML20198D937 + (Forwards App R Evaluation Re Valve Position & Alignment,As Encl to Walker ,Per Request)
- ML20099J439 + (Forwards App R Evaluation:Fort St Vrain Nuclear Generating Station, Rept 1 Shutdown Model)
- ML20101K567 + (Forwards App R Evaluation:Fort St Vrain Nuclear Generating Station, Rept 2 Electrical Reviews)
- ML20101S165 + (Forwards App R Evaluation:Fort St Vrain Nuclear Generating Station, Rept 3 on Fire Protection Review)
- ML18153C478 + (Forwards App R Evaluations of Reentry Time Info Affected Fire Area & Multiple High Impedance Faults)
- ML20101E737 + (Forwards App R Fire Protection Exemption Requests Per Discussions W/D Kubicki.Requested Exemptions Include Fire Doors,Fire Dampers,Primary Auxiliary Bldg/Charging Pump Cubicles (PAB-1) & Control Room (CR-1/CR-2))
- ML18031B041 + (Forwards App R Manual Action Requirements,Fire Hazards Analysis & Fire Protection Engineer Rept Updating Info in 860131 Submittal Re 10CFR50,App R)