- 05000454/FIN-2011008-02 + (Failure to Initiate Issue Reports)
- 05000445/FIN-2009003-01 + (Failure to Initiate Smart Form for Damage to Steam Generator Tubes Due to Loose Parts)
- 05000482/FIN-2013002-01 + (Failure to Initiate a Condition Report and Determine Extent of Condition for Emergency Diesel Generator Head Stud Failure)
- 05000445/FIN-2013002-05 + (Failure to Initiate a Condition Report for a Degraded Reactor Coolant Pump Motor Lower Oil Reservoir)
- 05000445/FIN-2013004-04 + (Failure to Initiate a Condition Report for a Degraded Under Frequency Relay)
- 05000498/FIN-2013002-01 + (Failure to Initiate a Condition Report for Spent Fuel Pool Cooling LOW Flow Alarms)
- 05000382/FIN-2014007-03 + (Failure to Initiate a Condition Report for a Condition Adverse to Quality)
- 05000445/FIN-2010002-02 + (Failure to Initiate a Condition Report for Degraded Undervoltage Relay)
- 05000334/FIN-2015008-01 + (Failure to Initiate a Condition Report for an Adverse Condition)
- 05000397/FIN-2012005-03 + (Failure to Initiate a Condition Report upon Identification of Degraded Lubrication in Safety-Related Equipment)
- 05000361/FIN-2009005-01 + (Failure to Initiate a Notification in a Timely Manner)
- 05000445/FIN-2009002-02 + (Failure to Initiate a Smart Form for Damage to Safety-Related Breakers (Section 1R15))
- 05000368/FIN-2016001-04 + (Failure to Inject Service Water with Corrosion Inhibitors during Refueling Outages)
- 05000413/FIN-2013003-01 + (Failure to Inspect Control Room Door Seal)
- 05000440/FIN-2015008-02 + (Failure to Inspect Penetration Seals Within the Required Time Frequency)
- 05000424/FIN-2010003-01 + (Failure to Inspect Tube R1C2 of Steam Generator 2 during the Steam Generator Eddy Current Examination in 2007)
- 05000263/FIN-2011008-02 + (Failure to Inspect and Test the MCR Air Intake Smoke Detector)
- 05000237/FIN-2009007-03 + (Failure to Inspect the Non-EQ Electrical Connections Subject to Localized Adverse Environment)
- 05000289/FIN-2009006-03 + (Failure to Install Amptector Bypass Jumper for Load Center Breaker)
- 05000313/FIN-2012003-02 + (Failure to Install Correct Coupling on Service Water Pump Results in Pump Failure)
- 05000298/FIN-2017001-06 + (Failure to Install Correct Mechanical Stop and Verify Proper Operation)
- 05000425/FIN-2017009-01 + (Failure to Install Drain Hole)
- 05000269/FIN-2010004-01 + (Failure to Install Fiber Reinforced Polymer on Unit 1 Auxiliary Building Wall as required by Procedure)
- 05000324/FIN-2017001-03 + (Failure to Install Flood Barrier Seals Around the EDG 2 Four -Day Fuel Oil Tank Vents)
- 05000456/FIN-2012008-01 + (Failure to Install Foam-Water Sprinklers In Accordance With Sprinkler Standard)
- 05000424/FIN-2012007-02 + (Failure to Install Freeze Protection for Exposed Fire Protection Piping)
- 05000445/FIN-2013002-06 + (Failure to Install Grout Under Pipe Support Base Plates)
- 05000338/FIN-2010002-06 + (Failure to Install LSHI/ORS Pump Discharge Piping in accordance with Prescribed Drawings)
- 05000333/FIN-2012005-01 + (Failure to Install Reserve Station Service Transformers in Accordance with Procedure)
- 05000327/FIN-2016007-02 + (Failure to Install Safety-Related Components that are Designed to Withstand the Effects of a Design Basis Tornado)
- 05000321/FIN-2014002-01 + (Failure to Install Seismic Restraints of the Unit 2 LOCA LOSP Timer Cabinet Doors Following Inspection)
- 05000440/FIN-2012008-04 + (Failure to Install Sequential Timing Device for Fire Pumps)
- 05000368/FIN-2017002-02 + (Failure to Install Set Screw Leads to Breaker Failure)
- 05000269/FIN-2010003-02 + (Failure to Install Structural Rebar as Required by Instructions and Drawings)
- 05000269/FIN-2010005-03 + (Failure to Install Structural Rebar as Required by Instructions and Drawings)
- 05000331/FIN-2014011-01 + (Failure to Install Torus Coating in Accordance with Established Processes)
- 05000315/FIN-2012002-01 + (Failure to Install a Grommet Seal on the Main Turbine Thrust Bearing Probe)
- 05000445/FIN-2014004-04 + (Failure to Install an Insulated Bushing on a Generator Current Transformer Circuit Results in an Automatic Reactor Trip)
- 05000346/FIN-2014007-01 + (Failure to Install and Control RCP Seal Cavity Vent Flexible Hoses Per Design Basis Analysis)
- 05000272/FIN-2013002-02 + (Failure to Install the Correct Size Zinc Anode in 11 Service Water Strainer Results in Strainer Trip)
- 05000498/FIN-2010005-02 + (Failure to Install the Required Number of Smoke Detectors (4) in the Auxiliary Shutdown Rooms)
- 05000416/FIN-2017011-04 + (Failure to Install the Residual Heat Removal Pump A Mechanical Seal in Accordance with Procedures)
- 05000416/FIN-2018002-01 + (Failure to Institute Effective Corrective Action to Preclude Repetition)
- 05000458/FIN-2016007-02 + (Failure to Isolate Control Circuits for Safe Shutdown Equipment From the Effects of a Control Room Fire)
- 05000416/FIN-2017008-03 + (Failure to Isolate Control Circuits for Safe Shutdown Equipment From the Effects of a Control Room Fire)
- 05000483/FIN-2011005-06 + (Failure to Isolate Control Room Air Conditioning Unit SGK04A for Maintenance)
- 05000293/FIN-2016011-03 + (Failure to Issue Appropriate Corrective Actions to Preclude Repetition for the Causes of the September 2016 Scram)
- 05000395/FIN-2018010-01 + (Failure to Justify Activation Energy for Valcor SOV XVX06050A)
- 05000255/FIN-2015003-01 + (Failure to Justify Continued Service of Safety-Related Electrolytic Capacitors Installed Beyond Their Service Life)
- 05000282/FIN-2018011-01 + (Failure to Justify Load Combinations Used in Main Steam Piping Stress Analysis)
- 05000361/FIN-2008005-02 + (Failure to Justify Longer Completion Schedule for Degraded Equipment)