| Q | CCA | Title |
---|
05000416/FIN-2017012-02 | 2017Q3 | P.3 | Failure to Operate the Gaseous Radwaste System Within Design Specifications |
05000416/FIN-2017003-01 | 2017Q3 | H.2 | Isolation of Reactor Core Isolation Cooling System during Surveillance Testing |
05000416/FIN-2017012-01 | 2017Q3 | P.3 | Failure to Correct Instrument Calibration Process in a Timely Manner |
05000416/FIN-2017007-02 | 2017Q4 | H.8 | Failure to Correct Standby Diesel Generator Trip |
05000416/FIN-2017007-03 | 2017Q4 | H.5 | Failure to Establish a Preventive Maintenance Procedure for Safety -Related Equipment |
05000416/FIN-2017007-04 | 2017Q4 | | Failure to Update the Final Safety Analys is Report |
05000416/FIN-2017007-05 | 2017Q4 | | Failure to Update a Calculation and Procedure to Address Standby Service Water Passive Failure |
05000416/FIN-2017007-06 | 2017Q4 | | Failure to Ensure Adequate Design Control Measures Are in Place Associated with Leakage Control Systems |
05000416/FIN-2017014-01 | 2017Q4 | | Inappropriate Proctoring of Training Examinations |
05000416/FIN-2017014-02 | 2017Q4 | | Failure to Perform Operator Rounds |
05000416/FIN-2017014-03 | 2017Q4 | | Falsification of Operator Rounds Records |
05000416/FIN-2017011-04 | 2018Q1 | | Failure to Install the Residual Heat Removal Pump A Mechanical Seal in Accordance with Procedures |
05000416/FIN-2018001-04 | 2018Q1 | | Inadequate Procedural Guidance which Resulted in Undemanded Control Valve Movements and Manual Scram |
05000416/FIN-2018001-03 | 2018Q1 | | Inadequate Procedural Guidance Which Resulted in Control Room Air Conditioning Inoperability |
05000416/FIN-2018001-02 | 2018Q1 | | Failure to Follow Procedure when Returning Containment Airlock to Operable Status |
05000416/FIN-2018001-01 | 2018Q1 | | Failure to Promptly Correct Lube Oil Leak on Division 2 Diesel Generator |
05000416/FIN-2017011-06 | 2018Q1 | | Failure to Perform Functionality Assessments as Required by Procedures |
05000416/FIN-2017011-05 | 2018Q1 | | Failure to Correct Control Room Boundary Door Resulted in Loss of Safety Function |
05000416/FIN-2017011-03 | 2018Q1 | | Failure to Conduct Common Cause Failure Evaluation in Response to Inoperable Emergency Diesel Generator |
05000416/FIN-2017011-02 | 2018Q1 | | Failure to Disposition Adverse Conditions as Required by Procedures |
05000416/FIN-2017011-01 | 2018Q1 | | Failure to Categorize Condition Reports for Significant Conditions Adverse to Quality as Required by Procedures |
05000416/FIN-2018002-01 | 2018Q2 | P.2 | Failure to Institute Effective Corrective Action to Preclude Repetition |
05000416/FIN-2018002-02 | 2018Q2 | H.5 | Failure to Follow ASME Requirements for Maintaining Inservice Inspection (ISI) Cycles and Perform ASME Required Inservice Inspections within the Scheduled ISI Cycle |
05000416/FIN-2018002-03 | 2018Q2 | | Failure to Adequately Test NUS Temperature Switch |
05000416/FIN-2018002-04 | 2018Q2 | H.8 | High Radiation Area Boundary Violation |
05000416/FIN-2018002-05 | 2018Q2 | H.12 | Failure to Follow Procedure Requirements Resulting in Unplanned Dose |
05000416/FIN-2018002-06 | 2018Q2 | P.2 | Improper Evaluation and Resolution of Intermediate Range MonitorNoise Leads to Manual Reactor Shutdown |
05000416/FIN-2018002-07 | 2018Q2 | H.12 | Loss of Shutdown Cooling |
05000416/FIN-2018002-08 | 2018Q2 | H.5 | Performance of Surveillance Testing Following Maintenance on Containment Airlock |