Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25176A169 + (Discrimination Allegations Received May 2025)
- ML23289A230 + (Discrimination Allegations Received Sept - 2023)
- ML24285A243 + (Discrimination Allegations Received Sept 2024)
- ML22131A083 + (Discrimination Allegations Received, April 2022)
- ML22257A139 + (Discrimination Allegations Received, August 2022)
- ML22286A090 + (Discrimination Allegations Received, September 22)
- ML21348A099 + (Discrimination Allegations Received: January 2017 to November 2021)
- ML21316A184 + (Discrimination Allegations Received: January 2017 to October 2021)
- ML22194A854 + (Discrimination Allegations Received: January 2018 - June 2022)
- ML100290375 + (Discrimination Concerns (2002-Present))
- ML20151P805 + (Discrimination of Flood,Storm & Tectonic Events in Coastal Marsh Records of Southern Cascadia Margin, Presented at 880506-08 Meeting in Seattle,Wa)
- ML072690452 + (Discrimination: OI Case 2-2006-033)
- ML20217H270 + (Discriminatory Effectiveness of Validated,Modified & New Items in Examinee Test Performance)
- ML20246A663 + (Discsusses Audit of GE Advanced BWR Design QA in San Jose,Ca.Design Programs Implemented by Ge,Hitachi & Toshiba Meet 10CFR50,App B Requirements & Acceptable for Designing Advanced BWR)
- ML20056C366 + (Discusees Review of Licensee 930125 Application Requesting That PASNY rept,IP3-RPT-RPC-00357,be Withheld from Public Disclosure Per 10CFR2.790 & Determined That Info Sought to Be Withheld Contains Trade Secrets or Proprietary Info)
- ML20248G181 + (Discuses AEC Re Individual Being Unable to Obtain from Us Nuclear Certain Exposure Records & Results of Urine & Fecal Samples of Former Employee in Jan 1968 Plutonium Incident.Memo Partially Withheld)
- ML19253B666 + (Discuses Insp Rept 50-289/74-32.Requiring Util to Upgrade QA Program for Minor Issue of Limited Accessibility Is Unnecessary)
- ML19282A164 + (Discuses NRC Concern Re Heat Transfer Coefficient of 4-inch Safe Code & GE Clarification)
- ML20056C683 + (Discuses Problems Existing at Plant Re Ref Leg of BWR Water Level Instrumentation Which Can Lead to False High Level Indications After Rapid Depressurization Event & Issue of Operability Determinations)
- ML20204C339 + (Discuses Program Mgt Info:Rev of Date for Public Workshop to Develop SRP for Decommissioning (SP-99-012).New Date for Workshop 990623-24)
- ML20128D980 + (Discuses Review of Technical Assistance Request ORB-2-202, Rev 4 to Monticello Security Plan, & Finds That It Does Not Decrease Effectiveness of Security Plan as Approved in Memo,)
- ML19262A448 + (Discuses Vendor Insp Rept 999-12/72-01 on 720822.No Noncompliance Noted.Major Areas Inspected:Procedures & Representative Records & Interviews W/Plant Personnel)
- ML19341B458 + (Discuses Zion Units 1 & 2 Siting & Problems W/Evacuation & Emergency Planning Due to Population Density.Potential for Catastrophe Is Unlimited.Facility Site Is Unreasonable. Certificate of Svc Encl)
- ML13317B273 + (Discusess 1990 Steam Generator Insp Rept.Rept Documents Steam Generator Tube Insp & Repairs That Were Completed During Refueling Outage 11 to Comply W/Tech Spec Section 4.16)
- ML20036C182 + (Discusess Info Received Re Amersham Corp Abandonment of Certificate of Compliance for Models 100,100A,200 & 200A by 960110.Requests Modified Certificate of Compliance Under Present Registered Device Testing)
- ML20237L643 + (Discusess T/H Research Program)
- ML19326D527 + (Discuss ACRS Review of OL Application)
- ML19208C589 + (Discuss ALAB-550.ASLAB Should Have Accepted Review of Third Issue Re Search Costs.Nrc Should Determine Std to Be Applied for Reimbursement When Nonparties Incur Substantial Search Costs from Subpoenas)
- IR 05000206/1983023 + (Discuss Actions Taken as Result of La Times 831023 Article Re Possession & Use of Drugs at Plant.Completed Bechtel Power Corp Investigation & Security Insp Repts 50-206/83-23, 50-361/83-38 & 50-362/83-36 Close Required Actions)
- ML19339H606 + (Discuss Annual Program Review of Operator Licensing Function in Region Ii.Specific Details of Review Encl)
- PMNS20201381, Discuss Approaches for Rulemaking on Decommissioning Financial Assurance Requirements for Sealed and Unsealed Radioactive Materials + (Discuss Approaches for Rulemaking on Decommissioning Financial Assurance Requirements for Sealed and Unsealed Radioactive Materials)
- ML20010F864 + (Discuss Basis for Computing Combined Responses Re Seismic Design.Procedure Will Be Incorporated in Next FSAR Amend)
- PMNS20180353, Discuss Camecos Responses to the NRC Staffs Request for Additional Information on the Smith Ranch License Renewal Request + (Discuss Camecos Responses to the NRC Staffs Request for Additional Information on the Smith Ranch License Renewal Request)
- PMNS20240451, Discuss Chemical Safety Analysis Documents Hosted on the TRISO-X Portal + (Discuss Chemical Safety Analysis Documents Hosted on the TRISO-X Portal)
- PMNS20180696, Discuss Draft RAI B.2.3.16-1, Fire Water System Enhancements, Related to the Turkey Point Subsequent License Renewal Application + (Discuss Draft RAI B.2.3.16-1, Fire Water System Enhancements, Related to the Turkey Point Subsequent License Renewal Application)
- PMNS20230771, Discuss Draft RAIs for the TRISO-X License Application for Chapter 2 (Organization and Administration) and ISA Summary (Programmatic) + (Discuss Draft RAIs for the TRISO-X License Application for Chapter 2 (Organization and Administration) and ISA Summary (Programmatic))
- PMNS20230799, Discuss Draft RAIs for the TRISO-X License Application for ISA Summary (Programmatic) and Chapter 2 (Organization and Administration) + (Discuss Draft RAIs for the TRISO-X License Application for ISA Summary (Programmatic) and Chapter 2 (Organization and Administration))
- PMNS20250503, Discuss Draft Requests for Additional Information Regarding the Environmental Safety Review for the License Amendment Request to Raise Enrichment Limit for Leu+ Recycling and Support Systems + (Discuss Draft Requests for Additional Information Regarding the Environmental Safety Review for the License Amendment Request to Raise Enrichment Limit for Leu+ Recycling and Support Systems)
- GO2-84-512, Discuss GE Recommendations Re Hatch Unit 2 Event Concerning Large Crack in Torus Vent Header Due to Brittle Fracture,Per GE 840214 Info Ltr 402.Only Recommendations 1 & 2 Apply,As Sys Not Yet Used to Inert Containment + (Discuss GE Recommendations Re Hatch Unit 2 Event Concerning Large Crack in Torus Vent Header Due to Brittle Fracture,Per GE 840214 Info Ltr 402.Only Recommendations 1 & 2 Apply,As Sys Not Yet Used to Inert Containment)
- IR 05000133/1984002 + (Discuss IE Safeguards Insp Rept 50-133/84-02 Conducted on 840523-25.No Noncompliance Noted.Major Areas Inspected:Exams of Procedures & Records & Interviews W/Personnel.Rept Withheld (Ref 10CFR2.790 & 73.21))
- PMNS20190914, Discuss Kairos Regulatory Analysis Topical Report + (Discuss Kairos Regulatory Analysis Topical Report)
- ML20203D532 + (Discuss Latest Rev to NRC Manual Chapter Re SALP Program & Highlights Areas of Program Most Significantly Affected by Rev. Commission Policy Statement on Training & Qualification of Nuclear Plant Personnel Encl)
- PMNS20250992, Discuss Licensing Efficiencies Initiative: Streamlining Pre-application Engagements for Nuclear Material Users (Nmu) + (Discuss Licensing Efficiencies Initiative: Streamlining Pre-application Engagements for Nuclear Material Users (Nmu))
- PMNS20221302, Discuss NRCs Draft Regulatory Issue Summary (RIS) Related to Personnel Access Authorization Requirements for Non-Immigrant Foreign Nationals Working at Nuclear Power Plants + (Discuss NRCs Draft Regulatory Issue Summary (RIS) Related to Personnel Access Authorization Requirements for Non-Immigrant Foreign Nationals Working at Nuclear Power Plants)
- PMNS20250446, Discuss NRCs Regulatory Issue Summary (RIS) Related to Personnel Access Authorization Requirements for Non-Immigrant Foreign Nationals Working at Nuclear Power Plants + (Discuss NRCs Regulatory Issue Summary (RIS) Related to Personnel Access Authorization Requirements for Non-Immigrant Foreign Nationals Working at Nuclear Power Plants)
- PMNS20250475, Discuss NRCs Regulatory Issue Summary (RIS) Related to Personnel Access Authorization Requirements for Non-Immigrant Foreign Nationals Working at Nuclear Power Plants + (Discuss NRCs Regulatory Issue Summary (RIS) Related to Personnel Access Authorization Requirements for Non-Immigrant Foreign Nationals Working at Nuclear Power Plants)
- PMNS20230766, Discuss PWROG-22010-NP, Revision 0, Risk Assessment Process for the Review of Topical Reports (Raptr) + (Discuss PWROG-22010-NP, Revision 0, Risk Assessment Process for the Review of Topical Reports (Raptr))
- ML20235A588 + (Discuss Preliminary Review of Portions of GESSAR-251 as Requested by Jf Stolz 740903 Memo.Section 6.2 Acceptable. Deficiencies Itemized in Encl)
- ML20040F751 + (Discuss Problems That States & Local Govts Have W/Continued Requirement for Exercises at Frequency Directed by Nrc/Fema Guidance & Regulations)
- ML13310B032 + (Discuss SEP Topic III-10.A, Thermal Overload Protection for Motors of Motor Operated Valves, Per 810724 Safety Evaluation.Mod of Valve Motors to Bypass Thermal Overload Devices Unnecessary)
- PMNS20240890, Discuss SMR-300 Intended Limited Work Authorization (LWA) Scope, Overall Licensing Strategy, and Timeline + (Discuss SMR-300 Intended Limited Work Authorization (LWA) Scope, Overall Licensing Strategy, and Timeline)