Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18082A295 + (Cycle 2 Startup Test Rept)
- ML20091P579 + (Cycle 2 Startup Test Rept for Seabrook Station,Unit 1. W/)
- PLA-2771, Cycle 2 Startup Test Summary + (Cycle 2 Startup Test Summary)
- EPID:L-2019-LRO-0068 + (Cycle 2 Steam Generator Tube Inspection Report)
- WBL-19-041, Cycle 2 Steam Generator Tube Inspection Report + (Cycle 2 Steam Generator Tube Inspection Report)
- ML20086D643 + (Cycle 2,Core Operating Limits Rept)
- ML20071F713 + (Cycle 2,Startup Physics Test Rept)
- ULNRC-06196, Cycle 20 Commitment Change Summary Report, Guideline for Managing NRC Commitment Changes, for Changes Requiring NRC Notification Annually or at a Frequency Consistent with That Required for FSAR Updates Per 10CFR 50.71 + (Cycle 20 Commitment Change Summary Report, Guideline for Managing NRC Commitment Changes, for Changes Requiring NRC Notification Annually or at a Frequency Consistent with That Required for FSAR Updates Per 10CFR 50.71)
- ML14181A038 + (Cycle 20 Core Operating Limits Report)
- ML13346A427 + (Cycle 20 Core Operating Limits Report)
- ML130720680 + (Cycle 20 Core Operating Limits Report)
- ML082890196 + (Cycle 20 Core Operating Limits Report)
- ML072770758 + (Cycle 20 Core Operating Limits Report)
- L-17-071, Cycle 20 Core Operating Limits Report + (Cycle 20 Core Operating Limits Report)
- BYRON 2016-0035, Cycle 20 Core Operating Limits Report + (Cycle 20 Core Operating Limits Report)
- BYRON 2014-0034, Cycle 20 Core Operating Limits Report + (Cycle 20 Core Operating Limits Report)
- L-2012-367, Cycle 20 Core Operating Limits Report + (Cycle 20 Core Operating Limits Report)
- NL-08-1664, Cycle 20 Core Operating Limits Report + (Cycle 20 Core Operating Limits Report)
- SVP-08-021, Cycle 20 Core Operating Limits Report + (Cycle 20 Core Operating Limits Report)
- NOC-AE-18003563, Cycle 20 Core Operating Limits Report + (Cycle 20 Core Operating Limits Report)
- NOC-AE-15003304, Cycle 20 Core Operating Limits Report + (Cycle 20 Core Operating Limits Report)
- L-2005-232, Cycle 20 Core Operating Limits Report + (Cycle 20 Core Operating Limits Report)
- ML051590292 + (Cycle 20 Core Operating Limits Report)
- NL-04-2057, Cycle 20 Core Operating Limits Report + (Cycle 20 Core Operating Limits Report)
- ML18121A449 + (Cycle 20 Core Operating Limits Report)
- ML15334A346 + (Cycle 20 Core Operating Limits Report)
- BSEP 14-0033, Cycle 20 Core Operating Limits Report (COLR) + (Cycle 20 Core Operating Limits Report (COLR))
- 2CAN030805, Cycle 20 Core Operating Limits Report (COLR) + (Cycle 20 Core Operating Limits Report (COLR))
- CNS-14-074, Cycle 20 Core Operating Limits Report Revision 1 + (Cycle 20 Core Operating Limits Report Revision 1)
- TMI-15-027, Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 10 + (Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 10)
- TMI-13-155, Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 9 + (Cycle 20 Core Operating Limits Report, COLR TMI 1, Revision 9)
- ML11168A068 + (Cycle 20 Core Operating Limits Report, Revision 0)
- HNP-15-033, Cycle 20 Core Operating Limits Report, Revision 0 + (Cycle 20 Core Operating Limits Report, Revision 0)
- RA22-010, Cycle 20 Core Operating Limits Reports + (Cycle 20 Core Operating Limits Reports)
- RA23-019, Cycle 20 Core Operating Limits Reports + (Cycle 20 Core Operating Limits Reports)
- ML062140072 + (Cycle 20 End of Life Moderator Temperature Coefficient Limit Report)
- ML101800225 + (Cycle 20 Fuel Cycle Design Report)
- ML102780673 + (Cycle 20 Loss-of-Coolant Accident Analysis Reports)
- ML16076A187 + (Cycle 20 Refueling Outage - 90 Day Inservice Inspection Summary Report)
- ML11189A034 + (Cycle 20 Startup Report)
- 2CAN070804, Cycle 20 Startup Report + (Cycle 20 Startup Report)
- BSEP 11-0071, Cycle 20 Startup Report + (Cycle 20 Startup Report)
- RA22-029, Cycle 20 Startup Test Report Summary + (Cycle 20 Startup Test Report Summary)
- ML102160374 + (Cycle 20 Thermal-Hydraulic Design Report)
- ML20211B597 + (Cycle 20 Voltage-Based Repair Criteria 90-Day Rept)
- ML093000120 + (Cycle 20, Revision 2, Core Operating Limits Report)
- 2CAN090902, Cycle 21 COLR + (Cycle 21 COLR)
- 2CAN081005, Cycle 21 COLR, Revision 1 + (Cycle 21 COLR, Revision 1)
- 2CAN111001, Cycle 21 COLR, Revision 2 + (Cycle 21 COLR, Revision 2)
- ML15364A010 + (Cycle 21 Core Operating Limits Report)
- ML15098A116 + (Cycle 21 Core Operating Limits Report)
- ML101060511 + (Cycle 21 Core Operating Limits Report)