Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Attachment (3 Cont.) Walkdown Checklists. Part 3 of 8". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML18227A406  + (Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1)
  • ML18227A417  + (Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1)
  • ML18219D904  + (Attached Replacement & Revised Pages of Appendix I Submittal. Both the Releases and the Doses Have Changed Due to the Subject Modification)
  • ML18219E093  + (Attached Report, Study of the Horizontal & Vertical Distribution of Entrained Animals in Cook Plant Intake Forebay. Sending to Keep Informed on Search for Optimum Sampling Location within the Forebay)
  • ML19093B445  + (Attached Requested Endorsements: Advanced Premium Endorsement & Standard & Reserve Premium Endorsements for Calendar Year of 1975 Along with Endorsement Nos. Requested on Each Policy)
  • ML19098B404  + (Attached Response to Request for Additional Information Steam Generators)
  • ML18227A397  + (Attached September, 1975, Operating Status Reports for Turkey Point Unit Nos. 3 & 4)
  • ML18227A405  + (Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1)
  • ML18227A416  + (Attached September, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1)
  • ML18220A508  + (Attached Slides Entitled, Steam Generator Enclosure Pressure Analysis, Present Summary of Preliminary Results Which Westinghouse Has Obtained with Multi-Node Model)
  • ML18191A232  + (Attached WPPSS Nuclear Project No. 2 Mark II Containment Design Evaluation. Will Continue to Provide Updated Information on Status of Generic Mark II Owners Range Program in Support of Dffr Design Basis Information)
  • ML18191A234  + (Attached WPPSS Nuclear Project No. 2 Suppression Pool Current Design Drawings, Which Do Not Reflect Any Design Changes That May Be Needed to Accommodate Loads Resulting from Pool Dynamic Forces During SRV Actuation or LOCA)
  • ML100840639  + (Attached to E-mail from Kristen Eide Tollefson for the PINGP Study Group, Outline of Modernizing NEPA Implementation, Adaptive Management and Monitoring from NEPA Task Force. Submitted with Comments on Draft Generic Environmental Impact Sta)
  • ML20217P785  + (Attaches Comments & Input to Response to Representative Johnson & Disk Containing Changes.P Rabideau Concurs W/Response W/Changes Included)
  • ML17243A369  + (Attachment - NRC Response to Thompson and Pugsley, May 2012)
  • ML083460561  + (Attachment (1) - Evaluation of Acid Production by Beta Dose)
  • ML081230386  + (Attachment (1) - Proposed Alternative ISI-020 in Accordance with 10 CFR 50.55a(a)(3)(i) - Alternative Provides Acceptable Level of Quality and Safety)
  • ML073450499  + (Attachment (1) Request for Extension of the Completion Date for Corrective Actions Related to Generic Letter 2004-02)
  • ML13323A083  + (Attachment (1) Responses to Questions 1 and 2 of Request for Additional Information, Attachment (2) Responses to Questions 3 and 4, Request for Additional Information and Attachment (3) 10 CFR 2.390 Affidavit of Westinghouse-CAW-13-3847)
  • ML12339A350  + (Attachment (1) Seismic Walkdown Report, Attachment (2) Equipment Lists and Attachment (3) Walkdown Checklists. Part 1 of 8)
  • ML100261534  + (Attachment (1), SER Restrictions for Calvert Cliffs)
  • ML090570486  + (Attachment (1), Summary of Calvert Cliffs, Unit 2 Deviation from MRP-139, Requirements)
  • ML082410687  + (Attachment (1), Technical Basis and No Significant Hazards Consideration for License Amendment Request: Application for Technical Specification Change TSTF-491)
  • ML082410693  + (Attachment (2), Marked Up Technical Specification Pages for License Amendment Request: Application for Technical Specification Change TSTF-491)
  • ML12339A356  + (Attachment (3 Cont.) Walkdown Checklists. Part 2 of 8)
  • ML12339A354  + (Attachment (3 Cont.) Walkdown Checklists. Part 3 of 8)
  • ML12339A367  + (Attachment (3 Cont.) Walkdown Checklists. Part 4 of 8)
  • ML12339A368  + (Attachment (3 Cont.) Walkdown Checklists. Part 5 of 8)
  • ML12339A366  + (Attachment (3 Cont.) Walkdown Checklists. Part 6 of 8)
  • ML070600212  + (Attachment (3) - GE-NE-000-0061-6180-R2-NP, Nine Mile Point 1 Shroud Repair Replacement Upper Support Stress Analysis Report (Non - Proprietary Version))
  • ML082410697  + (Attachment (3), Marked Up Technical Specification Bases Pages for License Amendment Request: Application for Technical Specification Change TSTF-491)
  • ML071990130  + (Attachment (3), Pump and Value Inservice Test Program Relief Requests for Calvert Cliffs Nuclear Power Plant Units 1 and 2 - Fourth Ten Year Interval)
  • ML12339A369  + (Attachment (4 Cont.) Area Walk-By Checklist, Attachment (5) Inaccessible Equipment and Peer Review and Attachment (6) Regulatory Commitments. Part 8 of 8)
  • ML12339A370  + (Attachment (4) Area Walk-By Checklist. Part 7 of 8)
  • ML20050M063  + (Attachment (LAR 19-014))
  • ML20050L840  + (Attachment (LAR 19-014))
  • ML103270455  + (Attachment (Non-Proprietary) to Final SE of GE Hitachi Nuclear Energy (GEH) TR NEDC-33173P, Supplement 3, Applicability of GE Methods to Expanded Operating Domains - Supplement for GNF2 Fuel)
  • ML24016A008  + (Attachment (Redacted) - Email Dated 1/15/24 from D. Bussman (Gns) to N. Garcia Santos (Nrc), Staggered RAIs for the Castor geo69 Storage Application - Confinement Evaluation (Docket No. 72-1052) (Public))
  • ML24002B143  + (Attachment (Redacted) - Email Dated 1/2/24 Dbussmann (Gns) to Ngarcia (Nrc), Staggered RAIs Castor geo69 Storage, Applicants Proprietary Review of Staggered RAIs Castor geo69 Storage Application-Shielding Evaluation (Public))
  • ML040430250  + (Attachment (Tech Specs B) to Encl 1 (Preliminary License) to 02/11/04 Ltr to L Womack, Diablo Canyon Power Plant, Re Preliminary License and Safety Evaluation Report (SER) for Diablo Canyon Independent Spent Fuel Storage Installation)
  • ML030550720  + (Attachment - 05/20/2002 Summary of Conference Call with Pacific Gas & Electric Co. 2002 Steam Generator Inspection Results at Diablo Canyon Unit 1)
  • ML16132A188  + (Attachment - 14 in Support of the 2.206 Enforcement Petition Related to the FPL Turkey Point Nuclear Plant)
  • ML24047A142  + (Attachment - 901.5-1-Inspection Report QA Checklist 02/01/2024)
  • ML22117A155  + (Attachment - Agenda for NRC Meeting May 10, 2022)
  • ML18026A769  + (Attachment - Amendment 108 for Vogtle Electric Generating Plant Unit 4 LAR 17-035)
  • ML18026A770  + (Attachment - Amendment 109 for Vogtle Electric Generating Plant Unit 3 LAR 17-035)
  • ML18051A839  + (Attachment - Amendment 114 (LAR-17-029))
  • ML18051A827  + (Attachment - Amendment 115 (LAR-17-029))
  • ML20098G699  + (Attachment - Application for Certificate of Compliance for the Traveller PWR Fuel Shipping Package Safety Analysis Report, Revision 15)
  • ML17230A309  + (Attachment - Background and Industry Position on Revision 3 of Regulatory Guide 8.7)
  • ML13156A063  + (Attachment - Callaway Cycle 20 Redesign: Core Operating Limits Report, Revision 1)