ML18051A827

From kanterella
Jump to navigation Jump to search

Attachment - Amendment 115 (LAR-17-029)
ML18051A827
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/12/2018
From:
NRC/NRO/DNRL
To:
References
EPID L-2017-LLA-0094, LAR 17-029
Download: ML18051A827 (5)


Text

ATTACHMENT TO LICENSE AMENDMENT NO. 115 TO FACILITY COMBINED LICENSE NO. NPF-91 DOCKET NO.52-025 Replace the following pages of the Facility Combined License No. NPF-91 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Combined License No. NPF-91 REMOVE INSERT 7 7 Appendix A to Facility Combined License Nos. NPF-91 and NPF-92 REMOVE INSERT 3.4.9-1 3.4.9-1 3.4.9-2 3.4.9-2 3.4.9-3 3.4.9-3

(7) Reporting Requirements (a) Within 30 days of a change to the initial test program described in FSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).

(b) SNC shall report any violation of a requirement in Section 2.D.(3),

Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.

(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 115, are hereby incorporated into this license.

(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).

(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:

(a) Environmental Qualification Program implemented before initial fuel load; (b) Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) Preservice Testing Program implemented before initial fuel load; (d) Containment Leakage Rate Testing Program implemented before initial fuel load; (e) Fire Protection Program

1. The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7 Amendment No. 115

Technical Specifications RCS Leakage Detection Instrumentation 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 RCS Leakage Detection Instrumentation LCO 3.4.9 The following RCS leakage detection instrumentation shall be OPERABLE:

a. Two containment sump level channels; and
b. One containment atmosphere F18 particulate monitor.

APPLICABILITY: MODES 1, 2, 3, and 4.

- NOTES -

1. The following RCS leakage detection instrumentation is not required to be OPERABLE provided SR 3.4.7.1 is performed once per 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> after 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> of steady state operation:
a. The required containment sump level channels when In-containment Refueling Water Storage Tank (IRWST) gutter drain isolation valves are closed and for 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> after reopening IRWST gutter drain isolation valves; and
b. The containment atmosphere F18 particulate monitor and required containment sump level channels when containment purge flow path is open and for 2 hours0.0833 days <br />0.0119 weeks <br />0.00274 months <br /> after containment purge flow path is closed.
2. The containment atmosphere F18 particulate monitor is only required to be OPERABLE in MODE 1 with RTP > 20%.

VEGP Units 3 and 4 3.4.9 - 1 Amendment No. 115 (Unit 3)

Amendment No. 114 (Unit 4)

Technical Specifications RCS Leakage Detection Instrumentation 3.4.9 ACTIONS

- NOTE -

LCO 3.0.4 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. One required A.1 Restore two containment 14 days containment sump sump channels to channel inoperable. OPERABLE status.

B. Two required B.1 -----------------------------------

containment sump - NOTE -

channels inoperable. Not required until 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> after establishment of steady state operation.

Perform SR 3.4.7.1. Once per 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> AND B.2 Restore one containment 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> sump channel to OPERABLE status.

C. Containment C.1.1 Analyze grab samples of Once per 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> atmosphere F18 containment atmosphere.

particulate monitor inoperable. OR C.1.2 -----------------------------------

- NOTE -

Not required until 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> after establishment of steady state operation.

Perform SR 3.4.7.1. Once per 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> AND C.2 Restore containment 30 days atmosphere F18 particulate monitor to OPERABLE status.

VEGP Units 3 and 4 3.4.9 - 2 Amendment No. 115 (Unit 3)

Amendment No. 114 (Unit 4)

Technical Specifications RCS Leakage Detection Instrumentation 3.4.9 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action D.1 Be in MODE 3. 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> and associated Completion Time of AND Condition A, B, or C not met. D.2 Be in MODE 5. 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br /> E. All required monitors E.1 Enter LCO 3.0.3. Immediately inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 Perform a CHANNEL CHECK. 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> SR 3.4.9.2 Perform a COT of containment atmosphere F18 92 days particulate monitor.

SR 3.4.9.3 Perform a CHANNEL CALIBRATION. 24 months VEGP Units 3 and 4 3.4.9 - 3 Amendment No. 115 (Unit 3)

Amendment No. 114 (Unit 4)