Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Amend 54 to OL Application". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20126B509  + (Amend 54 to License DPR-52 Changing Tech Specs for Limiting Safety Sys Setting.Tech Specs Encl)
  • ML19345G764  + (Amend 54 to License DPR-59,changing Tech Specs in Response to 810326 Application Re Interim Mod of Safety Relief Valve Setpoints)
  • ML17054A460  + (Amend 54 to License DPR-63,revising Tech Specs to Allow Increase in Spent Fuel Storage Capacity to Max 2,776 Assemblies by Use of Neutron Absorbing Spent Storage Racks)
  • ML20062F219  + (Amend 54 to License DPR-66,changing Station Batteries to Meet Requirements of IEEE Std 450-1980 & STS)
  • ML20081J477  + (Amend 54 to License DPR-70,extending Interval During First 10 Yr Svc Period to Permit Second Inservice Integrated Leak Rate Test During Fifth Refueling Outage)
  • ML20058B412  + (Amend 54 to License DPR-72,revising Tech Spec for Nuclear Overpower Trip Setpoints)
  • ML19297C989  + (Amend 54 to License NPF-1 Restricting Containment Purge/ Exhaust Fan Operation & Correcting Error on Min Water Level Maint Over Reactor Vessel During Refueling)
  • ML20214F610  + (Amend 54 to License NPF-12,changing Tech Specs to Modify Steam Generator Tube Plugging Requirements for Tube Defects Located in Tubesheet Region)
  • ML17279A994  + (Amend 54 to License NPF-21,revising Tech Specs Re Snubber Functional Testing Sampling Plans)
  • ML20043C037  + (Amend 54 to License NPF-30,revising Tech Spec 5.3.1 & 5.6.1.1 to Allow Fuel W/Max Initial Enrichment of 4.45 Weight Percent to Be Stored in Region 1 of Plant Spent Fuel Pool)
  • ML20247L174  + (Amend 54 to License NPF-38,changing Tech Specs by Deleting Requirements for Overcurrent Protection on Disconnected motor-operated Valve Actuator Compartment Heater Breakers from Table 3.8-1)
  • ML20087P409  + (Amend 54 to License NPF-4,revising Tech Specs to Allow Operation W/Rcs Average Temp of 587.8 F to Allow Optimization of Core Loading Pattern by Changing Fractional Thermal Power Multiplier from 0.2 to 0.3)
  • ML20028G885  + (Amend 54 to License NPF-43,changing Tech Specs Re Various Staff Items,Including Stated Group Meeting Frequency)
  • ML20029C010  + (Amend 54 to License NPF-47,revising TS Table 3.6.4-1, Drywell & Containment Isolation Valves by Adding Chilled Water Return from Drywell Isolation Valve)
  • ML20065D991  + (Amend 54 to License NPF-49,changing Tech Spec 4.0.2 by Deleting Requirement That Combined Time Interval for Any Three Consecutive Surveillance Intervals Does Not Exceed 3.25 Times Specified Surveillance Interval)
  • ML20114C082  + (Amend 54 to License NPF-57,allowing Exception to TS 4.0.4 Surveillance Requirements for IRMs & SRMs When Operational Condition 2 or 3 Is Entered from Operational Condition 1)
  • ML20059J716  + (Amend 54 to License NPF-58,revising TS 3.1.3.2, Control Rod Max Scram Insertion Times)
  • ML20088A493  + (Amend 54 to License NPF-6,revising Tech Specs Re Dc Distribution Sys)
  • ML20028H202  + (Amend 54 to License NPF-62,revising Tech Spec 3/4.4.1.3 to Specify Recirculation Loop Flow Is Summation of Flows from All Jet Pumps Associated W/Single Recirculation Loop)
  • ML18011A836  + (Amend 54 to License NPF-63,providing for one-time Schedular Extension from TS Surveillance Interval of 40 Months Plus & Minus 10 Months to Approx 54 Months to Allow Third Type a Test of First 10-yr Svc Period to Be Performed)
  • ML17059A144  + (Amend 54 to License NPF-69,revising TS 3/4.8.1 & Associated Bases to Eliminate Unnecessary Diesel Generator Testing When Diesel Generator or Offsite Power Source Becomes Inoperable)
  • ML20072G967  + (Amend 54 to License NPF-72,re Changes to TS to Add SR Related to Plant Specific Insp Guidelines to Section 4.4.5.4.a(11))
  • ML20216H834  + (Amend 54 to License NPF-86,revising App a TSs Relating to Requirements for AC Power Sources,Changing Certain Requirements Related to EDG Stated in TS 3/4.8.1, AC Sources)
  • ML20128M838  + (Amend 54 to License SNM-1097 for Ge,Granting one-time Extension from Requirement of 10CFR70.22(i)(3)(xii))
  • ML20207D722  + (Amend 54 to License SNM-696 for General Atomics)
  • ML19323G059  + (Amend 54 to PSAR)
  • ML19211A876  + (Amend 54 to PSAR)
  • ML20087N347  + (Amend 55 to Amended & Substituted Application for Licenses, Consisting of Amend 55 to FSAR)
  • ML20010D762  + (Amend 55 to DPR-16,revising Tech Specs,App a & B Re Auxiliary Electrical Power)
  • ML14133A459  + (Amend 55 to License DPR-13,authorizing Changes to App a Tech Specs & Bases to Allow Facility to Resume Power Operation for Cycle 8)
  • ML17256A346  + (Amend 55 to License DPR-18,incorporating New License Condition 2.C(10) to Confirm That Next Steam Generator Insp Involving Eddy Current & Visual Insps & Water Lancing Will Be Performed During Refueling Outage)
  • ML17263A415  + (Amend 55 to License DPR-18,revising TS 5.1 & Figure 5.1-1 to Define Site Boundary)
  • ML14175A666  + (Amend 55 to License DPR-23,adding Operability Requirement for Boron Injection Tank Heat Tracing Channels Consistent W/Other Tech Spec Requirements for Similar Sys)
  • ML19210E566  + (Amend 55 to License DPR-28,changing Tech Specs to Incorporate Limiting Conditions for Cycle 7 Operation & Surveillance Requirements Associated W/Control Rod Hydraulic Return Line Isolation Valves)
  • ML20031C223  + (Amend 55 to License DPR-3 Incorporating Modified Amended Security Plan Into OL)
  • ML19282B935  + (Amend 55 to License DPR-3 Incorporating Modified Amended Security Plan)
  • ML20235E520  + (Amend 55 to License DPR-34,revising Tech Spec to Require Both Sections of Both Steam Generators to Be Available for DHR in Power Operation)
  • ML19347F153  + (Amend 55 to License DPR-36,adding Flow Test Requirement & Monthly Insp to Verify That Manual Valves in Auxiliary Feedwater Sys Are Locked in Proper Positions)
  • ML19339C995  + (Amend 55 to License DPR-40,changing Tech Specs to Allow Operation Through Cycle 6 W/Less than 75% of Incore Detectors Operable Provided Addl Compensatory Measures Are Followed)
  • ML20206G614  + (Amend 55 to License DPR-45,changing Tech Specs to Add New Reporting Requirements of 10CFR50.73 & Details to Requirements of Repts Required for Diesel Generator Failures)
  • ML19260A795  + (Amend 55 to License DPR-49,replacing Requirement for Repeated Manual Sampling & Analysis for Chlorine at Plant Discharge W/Requirement for Automatic Recording/Control Equipment)
  • ML20004A954  + (Amend 55 to License DPR-51,modifying Tech Specs Requiring Purge Valves to Be Closed Whenever RCS Temp Is Equal to or Greater than 200 F)
  • ML17319B425  + (Amend 55 to License DPR-58,permitting one-time Exclusion of Inoperable Status of One ECCS Subsystem for 144-h)
  • ML20004F978  + (Amend 55 to License DPR-59,allowing Increase in Spent Fuel Storage Capacity Up to Max of 2,244 Fuel Assemblies)
  • ML17054A448  + (Amend 55 to License DPR-63,changing Tech Specs Re Use of Term Operable as Applied to Safety Sys in Power Reactors)
  • ML17053C680  + (Amend 55 to License DPR-63,revising Tech Specs to Approve Instrumentation Scale Changes Necessary to Provide Common Ref Level)
  • ML19323E046  + (Amend 55 to License DPR-65 Revising Tech Specs to Permit Low Temp Testing to Identify Turbine Generator Efficiency Losses)
  • ML20062K254  + (Amend 55 to License DPR-66,deleting Requirement for Chlorine Sampling as Requirement Has Already Been Satisfied for NPDES Permit)
  • ML17213A926  + (Amend 55 to License DPR-67 Updating Offsite & Facility Organization Figures & Membership of Nuclear Review Board in Administrative Controls Section of Tech Specs)
  • ML20072H707  + (Amend 55 to License DPR-71,permitting Postponement of Flow Test for Core Spray Sys Until 48 H After Restoration of Suppression Chamber to Operable Status)