ML14175A666

From kanterella
Jump to navigation Jump to search
Amend 55 to License DPR-23,adding Operability Requirement for Boron Injection Tank Heat Tracing Channels Consistent W/Other Tech Spec Requirements for Similar Sys
ML14175A666
Person / Time
Site: Robinson 
Issue date: 01/16/1981
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML14175A667 List:
References
DPR-23-A055 NUDOCS 8101300050
Download: ML14175A666 (4)


Text

R EG(,,

UNITED STATES NUCLEAR REGULATORY.COMMISSION WASHINGTON, D. C. 20555 CAROLINA POWER AND LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 55 License No. DPR-23

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Carolina Power and Light Company (the licensee) dated December 3, 1980, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activitiesauthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

-2

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-23 is hereby amended to read as follows:

(B) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 55, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION even A arga, hief Operating Reacto Branch #1 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

January 16, 1981

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 55 TO FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO. 50-261 Revise Appendix A as follows:

Remove Pages Insert Pages 3.3-4 3.3-4

d.

If one residual beat e-xchanger becomes Inoperable during normal reactor operation, the reactor may remain in operation for a period not to exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

e.

If any one flow path including valves of the safety injection or residual heat ret 'val system is found to be inoperable during normal reactor operation, the reactor may remain in operation for a period not to exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, provided the other flow path(s) are demonstrated to be operable prior to initiating repairs.

The hot leg injection paths of the Safety Injection System, including valves, are not subject to the requirements of this specification.

f.

If the boron concentration in the boron injection tank falls below 20,000 ppm, and is greater than 15,000 ppm, the reactor may remain in operation for a period not to exceed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. If the concentration is less than 15,000 ppm, the reactor will be placed in the cold shutdown condition utilizing normal operating procedures.

g.

Power or air supply may be restored to any valve referenced in 3.3.1.1.h. and 3.3.1.1.1. for the purpose of valve testing or maintenance providing no more than one valve has power restored and provided that testing and maintenance is campleted and power removed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> except for accumulator isolation valves (M0V 865 A,3,&C) which will have this time period limited to four hours.

h.

One channel of heat tracing may be out of service for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Amendment No.

55 3.3-4