ML19323E046
| ML19323E046 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/29/1980 |
| From: | Reid R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19323E048 | List: |
| References | |
| NUDOCS 8005220688 | |
| Download: ML19323E046 (8) | |
Text
--
S, pa atoq'o,,
UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION U
E WASHINGTON, D. C. 20555 THE CONNECTICUT LIGHT AND POWER COMPANY, THE HARTFORD ELECTRIC LIGHT COMPANY, WESTERN MASSACHUSETTS ELECTRIC COMPANY, AND NORTHEAST NUCLEAR ENERGY COMPANY DOCKET NO. 50-336 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE _
Amendment No. 55 License No. DPR-65 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by The Connecticut Light and Power Company, The Hartford Electric Light Compa' Massachusetts Electric Company, and Northeast Nu,ny, Western clear Energy Company (the licensees), dated December 27, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health i
and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; 0.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
8005220[-
-__ _ _ _ _ _ _ _. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-65 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.
55, are hereby incorporated in the license. The licensees shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
% n k 8.5 M y Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors
Attachment:
Changes to the Technical Specifications Date Of Issuance: April 29, 1980 5
J ATTACHMENT TO LICENSE AMENDMENT NO. 55 9
FACILITY OPERATING LICENSE N0. DPR-65 DOCKET N0. 50-336 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment i
number and contains vertical lines indicating the area of change. The corresponding overleaf page is also provided to maintain document com-pleteness.
Page 3/4 2-3 1
)
l 1
l 4
dF 0;
g 17.c m
H C
5
)
-4 x
d2
=R sm
$g is.o 10 m:E b*
UNACCEPTABLE OPERATION
$5 '*
- ACCEPTABLE OPERATION w
go N
4+
i Ed "L,
52 m-4 15.0 3:
3 i
Unacceptable Operation du ing Cycle 3 Lt w Temperature T esting*
14.2 --mammmmmmmmmmmesummmmmmmmmmmmum-5 Acceptable Operation duri 1g Cycle 3 Low Temperature Tes ting 4
14.0 g
g 0
100 200 300 400 see 5
EFFECTIVE FULL POWER DAYS
=:
Figure 3.21 Allowable Peak Lineer Host Rete vs Bumup
~
.w
- During Cycle 3, low temperature testing is authorized for periods r.ot exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with the inlet temperature greater than or equal to 5370F and without w
varying the programed pressurizer level.
E
- a...iji';jj ;jjj ijii jijj.!;j :;;;;;;. ij; j@ fili.i.Sij }.# jjij jyj jjj!jQ jjjf}{iji jfjj;j 1.10 '
- li :iit :.
. jiti-iii-tift iiji Hi-
- jjj
!!.4 thi !)jijj;jfjjpjj tjj ;Nl l(({ ijjl-ili- (((( ijj.:@ ijst p! !!!H.7 iiii Ilii iiii i lii: i!l !i ! !!!! : !! ilt ' i' i
!!i: iil!
'iii ;; il!i i!!! !! ! !f iii! iiii Hii ti
!!i {!!'
- ji ijji UNACCEPTABLE 1.00 UNACCEPTABLE OPERATION
- gj ig OPERATION
'-?
~
REGION REGION
<=-
.1 p;
-l
- j:p
- .
- ;;u ;;l.;
4:
.. i::
- p iiii
- ij
- (-0.06, 0.89)I L(0.15,0.89)! :ji l
- i Om d
[
i k ij! lli 3
- /
l1 :. i!!! !!!! !!!!' ;i !!!
!!! 'i:il-
"q l
f d
E
/r
- k iii 0.80
. f } i, ig ::::
l l
--l
- /
~l
[
(
m
.(
E 0.70 i
o l
I
.l-.
'i} (0.3,0.65)"
J J-f J
(-0.3, 0.65) 4
-l~
s
. j;_.,
ACCEPTABLE l
OPE R ATION 7
2 g
REGION o
0.60 H
l
.. l._ __L_
- i I
U I
<e l'
l
- lM
- l u
-l-l l
[
0.50
. _j. =.
.__ p;..
j' i.
+._
g.
,f.
li
.:(
l
=_
r-
.j~
.j-3
~
0.40 l
'[
..! l..
~ 't......
l l
iii=
+
_p q
.;. _.q._ q
. _... _ _ :. q;_
......j.....
t I-I "i
l 0.30
-0.6
-0.4 0.2 0
0.2 0.4 0.6 AXI AL SHAPE INDEX FIGURE 3.2-2 AXlAL SHAPE INDEX vs Fraction of Allowable Power Level per Specification 4.2.1.2c MILLSTONE - UNIT 2 3/424 Amendment No. U. #,52
.