Text
.
=
8 UNITED STATES
[v_
NUCLEAR REGULATCRY CC'.L'.' sSION
.fj v[ASHIN GTo N, D. c. 20555 f'
e
- i. Met e1 CAROLINA POWER & LIGMT 00.Y:ANY DOCKET NO. 50-325 BRUN_SWICK STEAM ELECTRIC'PLA'lT, UNIT 1 AMENDMENT TO FACILITY OPE:\\ TING LICENSE Amendment No. 55 License No. DPR-71 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Carolina Power & Light Company dated November 8,1982 and supplemented by letters dated January 6 and February 8,1983 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules ar.d regulations of the Cornission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted withcut endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security,or to the health and safety of the public; and E.
The issuance of this amendment is in accordan:e with 10 CFR Part 51 of the Commission's regulatiens and all ap:licable requirements have been satisfied.
2.
Accordingly, the license is amended by chances to the Technical Spec-ifications as indicated in the attachment te this license amendment, and paragraph 2.C.(2) of Facility Optrating License No. DPR-71 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications centained in Ap;endices A and B, as revised through Amendment Nc. 55, are hereby incorporated in the license. The licensee shall operate the facility in accorcance with the Technical Spe:ificaticns.
830329053s 830315 PDR ADOCK 05000325 P
PDR m,, -, -
---o
.. ~..
,c,.w w
3.
This license amendment is effective as of the date of issuance.
FOR THE NUCL AR REGULATORY COMMISSION Domenic B. Vassall, Chief Operating Reactors Branch #2 Division of Licensing
Attachment:
Changes to the Technical Specificctions Date of Issuance:
March 15,1983 o
- 9 e
em 4
I i
O
,w,
-+,
-+
-,.,--,-y e-v-,
.p
...,,.*- -... - -.-.v-
-- + -.-
ATTACHMEf!T TO LICEf;SE AMEf!DMEtiT f?0. 55 FACILITY OPERATIt!G LICEtiSE ff 0. DPR-35
~
DOCKET T40. 50-325 Revise the Appendix A Technical Specifications by removing page 3/4 5-6 and inserting revised page 3/4 5-6.
The changed area is indicated by vertical line.
e m
6
~.
EMERGENCY CORE COOLING SYSTEM 5 o SL*RVIILLANCE REOUIREMEN'is (Continued) 2.
Verifying that each valve (=anual, power-operated, or auto =atic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
c.
At least once per 92 days by:
- 1.
Verifying that each CSS pump can be started from the control l
e.
room and develops a flow of at least 4625 gpm on recirculation ~ -
flow against a system head corresponding to a reactor vessel pressure of > 113 psig.
2.
Performing a CFJdNEL CALIBRATION of the core spray header AP instrumentation (E21-dPIS-N004A,B) and verifying the set point to be 5, 1.5, psid greater than the nor=al indicated AP.
d.
At least once per 18 months by performing a system functional test which includes si=ulated auto =atic actuation of the system throughout its e=ergency operating sequence and verifying that each auto =atic valve in the flow path-actuates to its correct position. Actual injection of coolant into the reactor vessel is excluded from this test.
I 1
Il*
l The surveillance test required by this license in Appendix A, pa. rag'raph
(
'4.5.3.1.C.1, regarding the flow test of the core spray system may be l
postponed during the current refueling outage (Reload 3) until within 48 f
hours after restoration of the suppression chamber to operable status but in any case no later than June 15, 1983.
Brunswick - Unit 1 3/4 5-6 Amendment No. 55 i