Text
.-
parog%
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
g
,E wAsmwoTow, o. c. zose's
\\...+/
SOUTH CAROLINA ELECTRIC & GAS COMPANY SOUTH CAROLINA PUBLIC SERVICE AUTHORITY DOCKET NO. 50-395 VIRGIL C. SUP94ER NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 54 License No. NPF-12 1.
The Nuclear Regulatory Comission (the Comiss' ion) has found that:
A.
The application for amendment by South Carolina Electric & Gas Company and South Carolina Public Service Authority (the licensees) dated January 16, 1986, as revised August 15, 1986, and September 15, 1986, and supplemented May 8 and October 20, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; l
and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated fri the attachment to this license l
amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-12 is hereby amended to read as follows:
l l
8611250368 861105 PDR ADOCK 05000395 P
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 54, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This emendment is effective as of its date of issuance and until the end of the fifth refueling outage.
FOR THE NUCLEAR REGULATORY COMMISSION
. J._. N.2 u _
Lester S. Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing-A
~
Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: November 5,1986 l
l l
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 54 TO FACILITY OPERATING LICENSE NO. NPF-12 DOCKET NO. 50-395
- Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. Corresponding overleaf pages are also provided to maintain document completeness.
Remove Pages Insert Pages 3/4 4-12 3/4 4-12 3/4 4-14 3/4 4-14 3/4 4-15 3/4 4-15 B3/4 4-3 B3/4 4-3 l
[
REACTOR COOLANT SYSTEM 3/4.4.5 STEAM GENERATORS LIMITING CONDITION FOR OPERATION 3.4.5 Each steam generator shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3 and 4.
ACTION:
With one or more steam generators inoperable, restore the inoperable generator (s) to OPERABLE status prior to increasing T,yg above 200*F.
SURVEILLANCE REQUIREMENTS 4.4.5.0 Each steam generator shall be demonstrated OPERABLE by performance of
~~
the following augmented inservice inspection program and the requirements of Specification 4.0.5.
4.4.5.1 Steam Generator Sample Selection and Inspection - Each steam generator shall be determined OPERABLE during shutdown by selecting and inspecting at least the minimum number of steam generators specified in Table 4.4-1.
4.4.5.2 Steam Generator Tube Sample Selection and Inspection - The steam generator tube minimum sample size, inspection result classification, and the corresponding action required shall be as specified in Table 4.4-2.
The inservice inspection of steam generator tubes shall be performed at the fre-quencies specified in Specification 4.4.5.3 and the inspected tubes shall be verified acceptable per the acceptance criteria of Specification 4.4.5.4.
The tubes selected for each inservice inspection shall include at least 3% of the total number of tubes in all steam generators; the tubes selected for these inspections shall be selected on a random basis except:
Where experience in similar plants with similar water chemistry a.
indicates critical areas to be inspected, then at least 50% of the tubes inspected shall be from these critical areas.
b.
The first sample of tubes selected for each inservice inspection (subsequent to the preservice inspection) of each steam generator shall include:
SUMMER - UNIT 1 3/4 4-11
~
REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued) 1.
All nonplugged tubes that previously had detectable wall penetrations greater than 20%.
2.
Tubes in those areas where experience has indicated potential problems.
3.
A tube inspection (pursuant to Specification 4.4.5.4.a.8) shall be performed on each selected tube.
If any selected tube does' not permit the passage of the eddy current probe for a tube inspection, this shall be recorded and an adjacent tube shall be selected and subjected to a tube inspection.
c.
In addition to the sample required in 4.4.5.2 b.1 through 3, all tubes which have had the F* criteria applied will be inspected in the tubesheet region. These tubes may be excluded from 4.4.5.2 b.1 provided the only previous wall penetration of >20% was located below the F* distance.
~
~
d.
The tubes selected as the second and third samples (if required by 1
Table 4.4-2) during each inservice inspection may be subjected to a partial tube inspection provided:
1.
The tubes selected for these samples include the tubes from those areas of the tube sheet array where tubes with imperfections were previously found.
2.
The inspections include those portions of the tubes where imperfections were previously found.
The results of each sample inspection shall be classified into one of the i
following three categories:
Category Inspection Results C-1 Less than S% of the total tubes inspected are degraded tubes and none of the inspected tubes are defective.
C-2 One or more tubes, but not more than 1% of the total tubes inspected are defective, or between 5% and 10% of the total tubes inspected are degraded tubes.
C-3 More than 10% of the total tubes inspected are degraded tubes or more than 1% of the inspected tubes are defective.
Note:
In all inspections, previously degraded tubes must exhibit significant (greater than 10%) f* 'ther wall penetrations i
to be included in the above pers age calculations.
j SUMMER - UNIT 1 3/4 4-12 Amendment No. 54 4
.,,-.m
REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued)
Inspection Frecuencies - The above required inservice inspections of 4.4.5.3 steam generatur tubes shall be performed at the following frequencies:
The first inservice inspection shall be performed after 6 Effective Full Power Months but within 24 calendar months of initial criticality.
a.
Subsequent inservice inspections shall be performed at intervals of not less than 12 nor more than 24 calendar months after the previous inspection.
If two consecutive inspections following service under AVT conditions, not including the preservice inspection, result in hil inspection results falling into the C-1 category or if two consecutive inspections demonstrate that previously observed degra-dation has not continued and no additional degradation has occurred, the inspection interval may be extended to a maximum of once per 40 months.
If the 'results of the inservice inspection of a steam generator b.
conducted in accordance with Table 4.4-2 at 40 month intervals fall in Category C-3, the inspection frequency shall be increased to at least once per 20 months. The increase in inspection frequency i
shall apply until the subsequent inspections satisfy the criteria of Specification 4.4.5.3.a; the interval may then be extended to a maximum of once per 40 months.
Additional, unscheduled inservice inspections shall be performed on c.
each steam generator in accordance with the first sample inspection specified in Table 4.4-2 during the shutdown subsequent to any of the following conditions:
l 1.
Primary-to-secondary tubes leaks (not including leaks originating from tube-to-tube sheet welds) in excess of the limits of Specification 3.4.6.2.
A seismic occurrence greater than the Operating Basis Earthquake.
2.
A loss-of-coolant accident requiring actuation of the engineered 3.
safeguards.
4.
A main steam line or feedwater line break.
SUMMER - UNIT 1 3/4 4-13
REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued) 4.4.5.4 Acceptance Criteria a.
As used in this Specification:
1.
Imperfection means an exception to the dimensions, finish or contour of a tube from that required by fabrication drawings or specifications.
Eddy-current testing indications below 20% of the nominal tube wall thickness, if detectable, may be considered as imperfections.
2.
Degradation means a service-induced cracking, wastage, wear or general corrosion occurring on either inside or outside of a tube.
3.
Dearaded Tube means a tube containing imperfections greater than or equal to 20% of the nominal wall thickness caused by degradation.
4.
% Degradation means the percentage of the tube wall thickness affected or removed by degradation.
5.
Defect means an imperfection of such severity that it exceeds the plugging limit.
A tube containing a defect is defe:tive.
6.
Pluaaina Limit means the imperfection depth at or beyond which the tube shall be removed from service and is equal to 40% of the nominal tube wall thickness. This definition does not apply to the area of the tubesheet region below the F* distance pro-vided the tube is not degraded (i.e., no indications of cracking) within the F* distance.
7.
Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of an Operating Basis Earthquake, a loss-of-coolant accident, or a steam line or feedwater line break as specified in 4.4.5.3.c, above.
8.
Tube Inspection means an inspection of the steam generator tube from the point of entry (hot leg side) completely around the U-bend to the top support of the cold leg.
SUMMER - UNIT 1 3/4 4-14 Amendment No. 54
REACT 0'R COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued) 9.
Preservice Inspection means an inspection of the full length of each tube in each steam generator performed by eddy current techniques prior to service to establish a baseline condition of the tubing.
This inspection shall be performed after the field hydrostatic test and prior to initial POWER OPERATION using the equipment and techniques expected to be used during subsequent inservice inspections.
10.
F* Distance is the distance into the tubesheet from the face of the tubesheet or the top of the last hardroll, whichever is lower (further into the tubesheet) that has been conservatively chosen to be 1.6 inches.
11.
F* TUBE is the tube with degradation equal to or greater than 40%, below the F* distance and not degraded (i.e., no indica-tions of cracking) within the F* distance. The application of F* expires at the end of the fifth fuel cycle.
b.
The steam generator shall be determined OPERABLE after completing the corresponding actions (plug all tubes exceeding the plugging limit and all tubes containing through-wall cracks) required by Table 4.4-2.
4.4.5.5 Reports a.
Within 15 days following the completion of each inservice inspection of steam generator tubes, the number of tubes plugged in each steam generator shall be reported to the Commission in a Special Report pursuant to Specification 6.9.2.
b.
The complete results of the steam generator tube inservice ira; action shall be submitted to the Commission in a Special Report pursuant to Specification 6.9.2 within 12 months following the completion of the inspection. This Special Report shall include:
1.
Number and extent of tubes inspected.
2.
Location and percent of wall-thickness penetration for each indication of an imperfection.
3.
Identification of tubes plugged.
c.
Results of steam generator tube inspections which fall into Category C-3 and require prompt notification of the Commission shall be reported pursuant to 10 CFR 50.72(b)2(i) prior to resumption of plant operation.
A report pursuant to 10 CFR 50.73(a)2(ii) shall be submitted to provide a description of investigations conducted to determine cause of the tube degradation and corrective measures taken to prevent recurrence.
l d.
The results of inspections of F* tubes shall be reported to the Commission in a report to the Director, ONRR, prior to the restart of the unit following the inspection. This report shall include:
1.
Identification of F* tubes, and 2.
Location and size of the degradation NRC approval of this report is not required prior to restart.
SUMMER - UNIT 1 3/4 4-15 Amendment N 35, 54 l
REACTOR COOLANT SYSTEM BASES 3/4.4.5 STEAM GENERATORS The Surveillance Requirements for inspection of the steam generator tubes ensure that the structural integrity of this portion of the RCS will be main-tained.
The program for inservice inspection of steam generator tubes is based on a modification of Regulatory Guide 1.83, Revision 1.
Inservice inspection of steam generator tubing is essential in order to maintain surveillance of the conditions of the tubes in the event that there is evidence of mechanical damage or progressive degradation due to design, manufacturing errors, or inservice conditions that lead to corrosion.
Inservice inspection of steam generator tubing also provides a means of characterizing the nature and cause of any tube degradation so that corr 2ctive measures can be taken.
The plant is expected to be operated in a manner such that the secondary coolant will be maintained within those chemistry limits found to result in negligible corrosion of the steam generator tubes.
If the secondary coolant chemistry is not maintained within these limits, localized corrosion may likely result in stress corrosion cracking.
The extent of cracking during plant operation would be limited by the limitation of steam generator tube leakage between the primary coolant system and the secondary coolant system (primary-to-secondary leakage = 500 gallons per day per steam generator).
Cracks having a primary-to-secondary leakage less than this limit during operation will have an adequate margin of safety to withstand the loads imposed during normal operation and by postulated accidents.
Operating plants have demonstrated that primary-to-secondary leakage of 500 gallons per day per steam generator can readily be detected by radiation monitors of steam generator blowdown.
Leakage in excess of this limit will require plant shutdown and an unscheduled inspection, during which the leaking tubes will be located and plugged.
Wastage-type defects are unlikely with proper chemistry treatment of the secondary coolant.
However, even if a defect should develop in service, it i
l will be found during scheduled inservice steam generator tube examinations.
Plugging will be required for all tubes with imperfections exceeding the plug-ging limit of 40% of the tube nominal wall thickness.
Steam generator tube in-l spections of operating plants have demonstrated the capability to reliably de-tect wastage-type degradation that has penetrated 20% of the original tube wall l
thickness.
For t M tubes with degradation below the F* distance, but not degraded within the F* distance, plugging is not required.
l Whenever the results of any steam generator tubing inservice inspection l
fall into Category C-3, these results will be promptly reported to the Commission pursuant to 10 CFR 50.72(b)2(i) prior to resumption of plant operation.
Such i
l cases will be considered by the Commission on a case-by-case basis and may result in a requirement for analysis, laboratory examinations, tests, additional eddy-current inspection, and revision of the Technical Specifications, if necessary.
SUMMER - UNIT 1 B 3/4 4-3 Amendment No. H, 54 l
_