- 05000387/LER-1983-139-01, Alternate Power Supply Breaker Removed & Bus 1A203 Did Not Have Two Independent Offsite Sources of Power.Caused by Personnel Error.Proper Interpretation of Tech Specs Provided + (Alternate Power Supply Breaker Removed & Bus 1A203 Did Not Have Two Independent Offsite Sources of Power.Caused by Personnel Error.Proper Interpretation of Tech Specs Provided)
- ML19221A572 + (Alternate Pressurizer Level Methods)
- ML20107L614 + (Alternate Procedures for the Seismic Analysis of Multiply Supported Piping Systems)
- ML20217Q421 + (Alternate Repair Criteria 90 Day Rept)
- ML050120353 + (Alternate Requalification Program for Detailed Senior Reactor Operator)
- ML040100006 + (Alternate Requalification Program for Detailed Senior Reactor Operator)
- ML030580698 + (Alternate Requalification Program for Detailed Senior Reactor Operator)
- ML030300258 + (Alternate Requalification Program for Detailed Senior Reactor Operator)
- ML022180380 + (Alternate Requalification Program for Senior Reactor Operator Detailed to the Institute of Nuclear Power Operations)
- ML020150597 + (Alternate Requalification Program for Senior Reactor Operator Detailed to the Institute of Nuclear Power Operations)
- ML020420510 + (Alternate Requalification Program for Senior Reactor Operator Detailed to Indian Point 2)
- ML20198M682 + (Alternate Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure Retaining Welds and Full-Penetration Welded Nozzles)
- EPID:L-2021-LLR-0092 + (Alternate Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure Retaining Welds and Full-Penetration Welded Nozzles)
- ML20215E561 + (Alternate Rod Injection Risk Evaluation)
- ML20265A978 + (Alternate Rod Insertion Control Rod Drive System)
- ML17199X956 + (Alternate Rod Insertion Scram Discharge Vol Fill Analysis)
- PMNS20230212, Alternate Rules for Non-Destructive Examination and Testing of ASME Section III Nuclear Items + (Alternate Rules for Non-Destructive Examination and Testing of ASME Section III Nuclear Items)
- ML20266C182 + (Alternate SRV N2 Supply System.Sheet 2 of 3)
- 05000443/FIN-2014007-01 + (Alternate Safe Shutdown Areas Affected by Smoke from Cable Spreading Room Fire)
- ML19275G743 + (Alternate Safe Shutdown Capability in Event of Fire in Cable Spreading Room)
- ENS 44425 + (Alternate Safe Shutdown Local Start Capability of All Four Emergency Diesel Generators May Not Be Available Under Certain Conditions)
- ML121810188 + (Alternate Seal Injection Pump Picture - NFPA 805)
- ML20196C544 + (Alternate Seismic Criteria & Methodologies for Fort Calhoun Station Vol 1 Criteria & Methodologies)
- ML20196C571 + (Alternate Seismic Criteria & Methodologies for Fort Calhoun Station Vol 2 Justifications of Criteria & Methodologies)
- ML20099E007 + (Alternate Seismic Criteria & Methodologies for Fort Calhoun Station)
- ML19253C250 + (Alternate Shutdown Capability:Cold Shutdown Phase)
- ML20262A937 + (Alternate Shutdown Panel AI-185-Relay Schematics)
- 05000285/FIN-2012007-03 + (Alternate Shutdown Procedure Does Not Account for Single Worst Case Spurious Actuations)
- 05000341/FIN-2008006-05 + (Alternate Shutdown Procedure Failed to Identify TIME-CRITICAL Steps)
- 05000373/FIN-2016007-04 + (Alternate Shutdown Procedures Failed to Ensure RCIC MOVs Supply Breakers Were Closed)
- ML20052E941 + (Alternate Shutdown Study, Final Rept Apr 1982)
- ML20083D870 + (Alternate Shutdown Sys for Monticello Nuclear Generating Plant,Northern States Power Co)
- ML25029A245 + (Alternate Shutdown Systems - Regulating Engagement 4th Meeting)
- ML20155F154 + (Alternate Site Selection Process for Umtrap Sites)
- ML032340602 + (Alternate Source Term - State of Vermont Questions Re Entergy Nuclear Vermont Yankees Request of 07/31/2003, to Modify Design Bases)
- NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 + (Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3)
- ML14086A387 + (Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3)
- ML20202E899 + (Alternate Source Term Models for Yucca Mountain Performance Assessment Based on Natl Analog Data Secondary Mineral Solubility)
- ML15029A094 + (Alternate Source Term Pre- Submittal Meeting on February 3, 2015 (TAC Nos. MF5596 and MF5597). AST LAR NRC Meeting Presentation)
- ML023040302 + (Alternate Source Term Report - Revision 2)
- ML021050486 + (Alternate Source Term for Control Room)
- ML19211D465 + (Alternate Stds for Interpretation of Eddy-Current Data for Steam Generator Tubing)
- ML20266C176 + (Alternate Supply N2 Supply System.Sheet 1 of 3)
- ML19354E804 + (Alternate Testing for CO2 Full Discharge Test by Pressure Build & Tracer Gas Dilution Testing)
- ML19211C043 + (Alternative 1 to Proposed Task Action Plan A-40,Revision 2, Seismic Design Criteria. Alternative 1 Includes Seismic Tasks)
- ML19211C047 + (Alternative 2 to Proposed Task Action Plan A-40,Revision 2, Seismic Design Criteria. Alternative 2 Excludes Seismic Tasks)
- ML063460258 + (Alternative Approach for Responding to the Nuclear Regulatory Commission Request for Additional Information Letter Regarding Generic Letter 2004-02 (Docket Nos.: See Enclosure))
- ML060870274 + (Alternative Approach for Responding to the NRC Request for Additional Information Letter Generic Letter 2004-02)
- ML20203B304 + (Alternative Approaches to Assessing Performance & Suitability of Yucca Mountain for Spent Fuel Disposal, Final Rept)
- ML20052G824 + (Alternative Approaches to Establishing Personnel Qualifications Requirements:Considerations for Nuclear Power Plant Operations)
- ML20091L936 + (Alternative Approaches to Providing Engineering Expertise on Shift)