Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13322A422 + (9/26/2013 - Summary of Category 3 Public Meeting in Carlsbad, CA, to Discuss the Regulatory Framework and the Decommissioning of Previously Operating Nuclear Power Plants)
- ML18274A037 + (9/26/2018 Meeting Summary, Public Meeting with Nuclear Energy Institute to Discuss Revisions to Inspection Manual Chapter 0410, Notices of Enforcement Discretion)
- ML24270A255 + (9/26/24 Email from Bill Dam, Independent Environmental Consultant - Comments to Include for Advance Act Report to Congress)
- ML042730028 + (9/27/04, Browns Ferry Nuclear Plant - Issuance of Amendments Full-Scope Implementation of Alternative Source Term (TAC Nos. MB5733, MB5734, MB5735, MC0156, MC0157 and MC0158) (TS-405))
- ML052770147 + (9/27/05 Meeting Summary with Duke Energy Corp. on Oconee Units 1, 2 and 3, Re Tornado Mitigation Method)
- ML052620519 + (9/27/05, Diablo Canyon Unit 1, Response to Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at pressurized-water Reactors)
- ML052710123 + (9/27/05, Pressurizer Heater Sleeve Leak Risk-Informed Documentation for Palo Verde Nuclear Generating Station, Unit 3)
- ML12321A199 + (9/27/12 - Summary of Telephone Conference Call Held Between the NRC and Union Electric Company (Ameren Missouri), Concerning RAIs Pertaining to the Callaway Plant, Unit 1, License Renewal Application)
- ML19268D104 + (9/27/19 Class Deviation the Federal Acquisition Regulation to Implement Changes to the Micro Purchase Threshold and Simplified Acquisition Threshold)
- ML022700069 + (9/27/2002, ANO 1 & 2, Letter, Emergency Plan Changes)
- ML11257A190 + (9/28/2011 - Notice of Meeting with Duke Energy Carolinas, LLC, to Discuss Tornado and High Energy Line Break License Amendments, Oconee Nuclear Station, Units 1, 2, and 3)
- ML24053A246 + (9/28/23, Orano Tn Request to the U.S. DOT for a Short-Term Approval of a Shipment Using the Model No. GP-01 Japanese Package Taking Place in April 2024)
- ML032720538 + (9/29/03 - Palo Verde Nuclelar Generating Station, Unit 2 (PVNGS-2) Issuance of Amendment 149 on Replacement of Steam Generators and Uprated Power Operations (Tac. MB3696))
- ML052730073 + (9/29/05 - (Ltr. to EPA) - Notice of Availability of the Draft Plant-Specific Supplement 24 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS) Regarding Nine Mile Point Nuclear Station, Units 1 and 2)
- ML082660727 + (9/29/08 Acceptance Letter (Email) for Amendment Regarding Snubbers)
- ML11273A042 + (9/29/2011 Vermont Dept of Public Services V. NRC & Entergy; 11-1168 - Order)
- ML032480422 + (9/4/03, Arkansas Nuclear One, Units 1 & 2, Correction to Federal Register Notice)
- ML19252A394 + (9/4/19-Email from D. Shaw to Ngarcia Santos Clarification Graded Approach Proposed CoC Terminology)
- ML032481212 + (9/5/03, Letter to Dept. of Justice Re. South Texas Project, Units 1 & 2, Antitrust License Conditions)
- ML12215A421 + (9/5/12 Meeting Summary for Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 Appendix R (Fire Protection))
- ML13253A329 + (9/5/13 Email from R.Guzman to J.Azulay Regarding 2.206 (Tim Judson) Petition Vermont Yankee, Fitzpatrick, and Pilgrim (G20130211))
- ML18277A320 + (9/6/18 Summary of Pre-Application Meeting with TVA Regarding Four Planned License Amendment Requests Supporting Shutdown Board Cleaning, the Adoption of 50.69, and TSTF-425, and TSTF-500 at Watts Bar Nuclear Plant, Units 1 & 2)
- ML12227A590 + (9/6/2012 Notice of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Uni)
- ML12270A055 + (9/6/2012 Summary of Meeting by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Un)
- ML13269A025 + (9/6/2013, E-Mail from J. Nguyen to Mr. Janiti Draft Peach Bottom EA for Your Review)
- ML17268A364 + (9/7/2017 Letter from Wyoming Governor to NRC Chairman SECY-17-0081)
- ML22250A689 + (9/7/2022 Letter to S. Jenkins and S. French South Carolina FY2022 Integrated Materials Performance Evaluation Program (Impep) Scheduling and Questionnaire Letter)
- ML082680110 + (9/8/08 - Point Beach Nuclear Plant, Units 1 and 2, Summary of the September 8, 2008, Meeting with FPL Energy Point Beach, LLC, on Their Proposed Extended Power Uprate Application (Tac No. MD9526 and MD9527))
- PMNS20210944, 9/8/2021 Notice of Pre-Application Meeting for the Model No. TN-40-HT Package + (9/8/2021 Notice of Pre-Application Meeting for the Model No. TN-40-HT Package)
- ML22250A425 + (9/8/2022 ACRS Sc Meeting for NuScale EPZ TR)
- ML050470363 + (9/9/03 Turkey Point Condition Report 03-1330-1)
- ML052560651 + (9/9/05 - Summary of Meeting Held on July 22, 2005, Between the U.S. Nuclear Regulatory Commission (NRC) Staff and Firstenergy Nuclear Operating Company Regarding the Beaver Valley Power Station, Units 1 and 2 License Renewal Application)
- 3F0206-09, 90 Day Inservice Inspection (ISI) Summary Report + (90 Day Inservice Inspection (ISI) Summary Report)
- 3F0102-04, 90 Day Inservice Inspection (ISI) Summary Report + (90 Day Inservice Inspection (ISI) Summary Report)
- W3F1-2005-0005, 90 Day Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (90 Day Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors)
- ML12158A531 + (90 Day Response to March 12, 2012 Information Request Regarding Recommendation 9.3 of the Near Term Task Force Report)
- ML12171A017 + (90 Day Response to March 12, 2012 Information Request Regarding Recommendation 9.3 for Emergency Preparedness)
- ML12171A013 + (90 Day Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1)
- ML12171A011 + (90 Day Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1)
- ML12171A009 + (90 Day Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1)
- ML12171A007 + (90 Day Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1)
- ML12171A010 + (90 Day Response to March 12, 2012 Information Request Regarding Flooding Aspects of Recommendations 2.1 and 2.3)
- ML12171A008 + (90 Day Response to March 12, 2012 Information Request Regarding Flooding Aspects of Recommendations 2.1 and 2.3)
- ML12171A006 + (90 Day Response to March 12, 2012 Information Request Regarding Flooding Aspects of Recommendations 2.1 and 2.3)
- PLA-6919, 90 Day Response to NRC Bulletin 2012-01 + (90 Day Response to NRC Bulletin 2012-01)
- ET 07-0007, 90 Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients + (90 Day Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients)
- ML050750069 + (90 Day Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water)
- RBG-46429, 90-Day Advance Notification of ISFSI Operations + (90-Day Advance Notification of ISFSI Operations)
- ML021440050 + (90-Day Extension of the Third Inspection Interval (Tac No. MB2942))
- HNP-11-017, 90-Day Inservice Inspection (ISI) Summary Report + (90-Day Inservice Inspection (ISI) Summary Report)
- HNP-09-076, 90-Day Inservice Inspection (ISI) Summary Report + (90-Day Inservice Inspection (ISI) Summary Report)