9/9/05 - Summary of Meeting Held on July 22, 2005, Between the U.S. Nuclear Regulatory Commission (NRC) Staff and Firstenergy Nuclear Operating Company Regarding the Beaver Valley Power Station, Units 1 and 2 License Renewal Application
ML052560651
Person / Time
Site: Beaver Valley
Issue date: 09/09/2005
From: Rajender Auluck
NRC/NRR/DRIP/RLEP
To:
FirstEnergy Nuclear Operating Co
Auluck R, NRR/DRIP/RLEP, 415-1025
Shared Package
ML052560657 List:
References
Download: ML052560651 (6)


Text

September 9, 2005 APPLICANT: FirstEnergy Nuclear Operating Company FACILITY:

Beaver Valley Power Station, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING HELD ON JULY 22, 2005, BETWEEN THE U.S.

NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND FIRSTENERGY NUCLEAR OPERATING COMPANY REGARDING THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION On July 22, 2005, FirstEnergy Nuclear Operating Company (FENOC) met with members of the NRC staff at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the Beaver Valley Power Station (BVPS),

Units 1 and 2, license renewal application (LRA) recovery effort and project plan. Since the return of their first submittal, FENOC has brought in a project manager with prior license renewal experience to help lead the LRA recovery effort. Instead of attempting to revise the previous application, FENOC will start anew, verifying each step of the LRA before resubmittal.

Quality assurance and communication will be the key in this new process. The list of attendees is provided in Enclosure 1, and the meeting agenda is provided in Enclosure 2. FENOCs presentation slides used at the meeting are provided in Enclosure 3.

The steps to the LRA recovery effort include a technical assessment of the LRA, a legal gap analysis, a root cause evaluation, and the incorporation of lessons learned. FENOC has recently contracted the AREVA Group to assist with their technical review and Morgan, Lewis &

Bockius, LLP to assist with the legal gap analysis. Along with the assistance of these groups, a FENOC staff member was designated the responsibilities of coordinating and communicating comments and concerns with the industry and the NRC.

During the LRA recovery effort, accountability at all levels will be emphasized. FENOC will take ownership of the results of the project and provide oversight of the contractor. FENOC stated that they will remain as current as possible with industry and NRC license renewal activities and that their LRA and support documents will be subject to rigorous reviews. FENOC plans to resubmit the Beaver Valley license renewal application by the end of 2006 or early 2007.

/RA/

Rajender Auluck, Senior Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-334 and 50-412

Enclosures:

As stated cc w/encls: See next page

September 9, 2005 APPLICANT: First Energy Nuclear Operating Company FACILITY:

Beaver Valley Power Station, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING HELD ON JULY 22, 2005, BETWEEN THE U.S.

NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND FIRSTENERGY NUCLEAR OPERATING COMPANY REGARDING THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION On July 22, 2005, FirstEnergy Nuclear Operating Company (FENOC) met with members of the NRC staff at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the Beaver Valley Power Station (BVPS), Units 1 and 2, license renewal application (LRA) recovery effort and project plan.

Since the return of their first submittal, FENOC has brought in a project manager with prior license renewal experience to help lead the LRA recovery effort. Instead of attempting to revise the previous application, FENOC will start anew, verifying each step of the LRA before resubmittal. Quality assurance and communication will be the key in this new process. The list of attendees is provided in Enclosure 1, and the meeting agenda is provided in Enclosure 2.

FENOCs presentation slides used at the meeting are provided in Enclosure 3.

The steps to the LRA recovery effort include a technical assessment of the LRA, a legal gap analysis, a root cause evaluation, and the incorporation of lessons learned. FENOC has recently contracted the AREVA Group to assist with their technical review and Morgan, Lewis &

Bockius, LLP to assist with the legal gap analysis. Along with the assistance of these groups, a FENOC staff member was designated the responsibilities of coordinating and communicating comments and concerns with the industry and the NRC.

During the LRA recovery effort, accountability at all levels will be emphasized. FENOC will take ownership of the results of the project and provide oversight of the contractor. FENOC stated that they will remain as current as possible with industry and NRC license renewal activities and that their LRA and support documents will be subject to rigorous reviews. FENOC plans to resubmit the Beaver Valley license renewal application by the end of 2006 or early 2007.

/RA/

Rajender Auluck, Senior Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-334 and 50-412

Enclosures:

As stated cc w/encls: See next page DISTRIBUTION:

PUBLIC Adams Accession Nos: 1). Note, Encls 1, 2: ML052560651, 2) Slides: ML052430529, 3) Pkg:

ML052560657 Document Name: E:\\Filenet\\ML052560651.wpd OFFICE PM: RLEP LA: RLEP SC: RLEP NAME RAuluck YEdmonds SLee DATE 09/9/05 09/8/05 09/9/05 OFFICIAL RECORD COPY LIST OF ATTENDEES BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT PUBLIC MEETING July 22, 2005 Names Affiliations P.T. Kuo U.S. Nuclear Regulatory Commission (NRC)

Jacob Zimmerman NRC Rajender Auluck NRC Maurice Heath NRC Stacey Imboden NRC Michael Li NRC Pete Seng FirstEnergy Nuclear Operating Company (FENOC)

Steven Dort FENOC David Kunsemiller FENOC L.W. Pearce FENOC Greg Halnon FENOC Gregory Down FENOC Roger Rucker FENOC Todd Schneider FENOC Massoud Tafazzoli AREVA Daniel Horner McGraw-Hill Ken Brune Tennessee Vally Authory (TVA)

Kathryn Sutton Morgan Lewis James Ross Nuclear Energy Institute (NEI)

MEETING BETWEEN THE NRC STAFF AND FIRSTENERGY NUCLEAR OPERATING COMPANY LICENSE RENEWAL DISCUSSION FOR THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 ROOM O-12B4 AGENDA July 22, 2005 I.

Introduction/Opening remarks 10 minutes II.

Licensee discussion on License Renewal 90 minutes III.

Public Comments 20 minutes IV.

Adjourn

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Mary OReilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Regulatory Affairs/Performance Improvement Larry R. Freeland, Manager Beaver Valley Power Station Post Office Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P O Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: R. G. Mende, Director Work Management (BV-IPAB)

Post Office Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak Post Office Box 4, BV-A Shippingport, PA 15077

DISTRIBUTION: Meeting summary with FirstEnergy, Dated: September 9, 2005 Adams Accession No.: Pkg: ML052560657 HARD COPY RLEP RF E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li K. Winsberg (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff C. Holden R. Laufer T. Colburn R. Lorson, RI M. Modes, RI M. Sykes, RI P. Eselgroth, RI P. Cataldo, RI G. Smith, RI T. Mensah OPA