Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18228A288 + (2/4/1975 Letter Endorsement No. 29 to Policy No. NF-185, Nuclear Energy Liability Policy Covering Turkey Point Units 3 & 4)
- ML18227D967 + (2/4/1975 Letter Endorsement No. 30 to Policy No. NF-185, Nuclear Energy Liability Policy Covering Turkey Point Units 3 & 4)
- ML18228A287 + (2/4/1975 Letter Endorsement No. 30 to Policy No. NF-185, Nuclear Energy Liability Policy Covering Turkey Point Units 3 & 4)
- ML040410720 + (2/4/2004 Meeting Summary with Txu for Comanche Peak, Units 1 and 2 to Discuss Plans for Digital Modifications)
- ML040410460 + (2/4/2004 Meeting Summary with Txu for Comanche Peak, Units 1 and 2 to Discuss Plans for Digital Modifications)
- ML14049A337 + (2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328)
- ML14035A094 + (2/4/2014 Waterford Steam Electric Station, Unit 3 - Meeting Slides - NFPA 805 LAR Supplement)
- ML16005A134 + (2/4/2016 ACRS Subcommittee Meeting: Regulatory Guide 1.223 - Determining Post Quench Ductility)
- ML16005A133 + (2/4/2016 ACRS Subcommittee Meeting: Regulatory Guide 1 224 - Establishing Analytical Limits for Zirconium-Alloy Cladding Material)
- ML16005A135 + (2/4/2016 ACRS Subcommittee Meeting: Regulatory Guide 1.222 - Measuring Breakaway Oxidation Behavior)
- ML21032A045 + (2/4/2021 - Category 3 Public Meeting - NRC Presentation 10 CFR Part 53 Licensing and Regulation of Advanced Nuclear Reactors Objectives and Structure and Subpart D Preliminary Proposed Rule Language)
- ML020370563 + (2/5/02 Palo Verde Personnel Assignment-New PM (J Donohew) Effective 1/28/02)
- ML19014A015 + (2/5/19 Notice of Partially Closed Meeting with General Electric-Hitachi Nuclear Energy to Discuss the Technical Approach for Amending the GE2000 Safety Analysis Report to Include the Shipment of Fueled and Unfueled Accident Tolerant Fuel Ro)
- ML15084A004 + (2/5/2015 Summary of Presubmittal Meeting with STP Nuclear Operating Company to Discuss Integrated Leak Rate Testing Program License Amendment Request for South Texas, Units 1 and 2)
- ML040410695 + (2/6/04 Callaway Plant, Unit 1 - Issuance of Amd. 158 - Required Action Completion Time for Inoperable Turbine-Driven Auxiliary Feedwater Pump (Tac. MC1936))
- ML19031A001 + (2/6/2019 - Advisory Committee on Reactor Safeguards Meeting Non-power Production or Utilization Facility License Renewal Rulemaking)
- ML13035A057 + (2/7/13 Cancellation of Public Meeting with TVA Re 2.1 Response Schedule for Watts Bar Nuclear Plant, Unit 1)
- ML17038A500 + (2/8/17 NEI Walkthrough of NEI 16-16 Meeting)
- ML020420020 + (2/8/2002 - Letter to Administrative Judges Forwarding Copies of Exhibits to OI Report, Case 1-2001-007)
- ML19039A238 + (2/8/2019 Letter Received from Citizens Environmental Coalition - San Onofre Potential Load Drop Incident & Canister Damage)
- ML110380311 + (2/9/11 Meeting Handout - NRC Staffs Draft LCO 3.0.X)
- ML120620541 + (2/9/12 Summary of Meeting by Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution Approach for South Texas, Un)
- ML16053A343 + (2/9/16, Summary of Public Teleconference Call with Firstenergy Nuclear Operating Company Regarding Upcoming Perry Nuclear Plant, Unit 1 License Amendment Request to Revise Technical Specifications for Suppression Pool Water Level & Makeup s)
- ML120110334 + (2/9/2012 Notice of Meeting with Exelon Nuclear/Quad Cities Nuclear Power Station Re Netco Spent Fuel Pool Rack Insert)
- ML16252A433 + (2/9/2016-2/11/2016 BWROG Topical Report NEDC-33608P Audit Summary)
- ML18193A751 + (20)
- ML25016A283 + (20 - AI-ML for CRDM UT Analysis_Remote Delivery)
- ML24173A153 + (20 - EPRI-NRC Cooperative Research Project: PWSCC Crack Initiation Characterization of Alloys 600/182 and Alloys 690/52/152-2024 Overview and Status)
- ML22143A838 + (20 - Final Rv Supports for SLR - Steel - Mat Tech Info Mtg 2022 - Dijamco)
- ML23160A142 + (20 - Industry - Industry Perspective on Performance Monitoring)
- ML26015A227 + (20 - RI-ISI Support-Extension-Implementation)
- ML20028F669 + (20 Davis-Besse Operator Licensing Examination Approval)
- ML030710528 + (20 Day Response to Order EA-03-009 for Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors Dated February 11, 2003)
- NL-03-037, 20 Day Response to Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors + (20 Day Response to Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- 2CAN020304, 20 Day Response to Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors + (20 Day Response to Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML030780645 + (20 Day Response to Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- WM 03-0009, 20 Day Response to Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors + (20 Day Response to Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML030650872 + (20 Day Response to Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- B18849, 20 Day Response to Order EA-03-009, for Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors Dated February 11, 2003 + (20 Day Response to Order EA-03-009, for Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors Dated February 11, 2003)
- ML20262G021 + (20 Inch CRC Pipe Ultrasonic Calibration Block (Clinton). Sheet 1 of 1)
- ML20266C353 + (20 Ms 2 HPCI Pump Room Class Iin Reactor Bldg)
- ML24141A274 + (20 Renewed CoC No. 1026, Amendment No. 4, Appendix B - Fuelsolutions W21 Canister Technical Specifications)
- ML20266C408 + (20 Rh 3 RHR Pump 1B Suction Class N El)
- ML020700137 + (20 to EIP-ZZ-00212, Protective Action Recommendations)
- ML103620038 + (20% Wind Energy by 2030, Increasing Wind Energys Contribution to Us Electricity Supply)
- ML20266A346 + (20-114 Bfu Seal Water He)
- ML18159A278 + (20-31340-01 608964 Aptim Federal Services LLC (Notif.))
- ML19134A192 + (20-Appendix H to 10 CFR Part 50 Rulemaking Status)
- JPN-03-002, 20-Day Response to NRC January 7, 2003 Order for Compensatory Measures Related to Access Authorization + (20-Day Response to NRC January 7, 2003 Order for Compensatory Measures Related to Access Authorization)
- NRC-09-0026, 20-Day Response to NRC Order EA-09-072, Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Fermi Power Plant Independent Spent Fuel Storage Installation + (20-Day Response to NRC Order EA-09-072, Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Fermi Power Plant Independent Spent Fuel Storage Installation)
- ML14275A037 + (20-Day Response to NRC Security Order EA-07-195 on ISFSI)