Linda Howell Deputy Director Division of Nuclear Materials Safety US NRC Region IV 1600 E. Lamar Blvd.
Arlington, TX 76011-4511 Main Office: 422 Oakland Valley Rd. Cuddebackville, NY 12729 Phone 845-754-7951
- E-mail: warrenba@msn.com Jan. 31, 2019 RECEIVED FEB - 8 2019 DNMS Re: San Onofre Potential Load Drop Incident & Canister Damage
Dear Deputy Director Howell,
I have participated in NRC presentations and an enforcement conference related to the August Potential Load Drop Incident at San Onofre. I have written up my concerns related to the underlying engineering problems and the need for them to be addressed, instead of treating the issues as merely operational and management problems. Please see attached.
Thank you for your attention.
Sincerely,
~!t-~
Barbara J. Warren, RN, MS Executive Director A Clean Environment* Green Purchasing* Pollution Prevention* Healthy People* Green Jobs* Zero Waste A Healthy Economy* A Sustainable Future
San Onofre Potential Drop Load Incident with Spent Nuclear Fuel B.Warren The incident in question was the potential drop of a canister loaded with Spent Nuclear Fuel on August 3, 2018. It was reported to the public by a whistleblower at a public meeting.
Since that time NRC has held a public information session and on January 241\\ 2019 NRC held a Pre-Decisional Enforcement Conference with Southern California Edison (SCE) only. The meeting on January 24th had 400 people registered for the webinar. We don't know how many attended the meeting in person. This was a lengthy meeting yet the key issue was only briefly mentioned as an aside-the engineering design change. Instead the majority of the meeting focused on the operational improvements Southern California Edison has made to their procedures. Holtec Intl. was not in attendance and their role and their subsequent analysis was only briefly summarized.
I The root of the misalignment problem is an Engineering Design problem related to an added component, the Shield Ring, which was apparently never adequately evaluated.
At the meeting the mention of this engineering design problem lasted only a couple of minutes-skipping to other topics quickly. The shield ring was a late amendment to the UMAX storage system.
It is critical here to note thatyears earlier the San Onofre Nuclear plant attempted to replace steam generators in both units that were not "like forlike" replacements. The design had been substantially ch~ged _and*instead of going through the normal review process, San Onofre officials claimed the new generators were essentially the same as the originals. Obviously we are not going to review the entire history of this very serious error and fraud. However, the fact that a second engineering-design problem has reared its head at the same reactor facility is very disturbing.
However, even more disconcerting is the fact that NRC is treating this entire episode as an operational problem involving only SCE, the utility. We have struggled to find and review relevant documents. We could not locate the HI-Storm UMAX System FSAR, Rev. 4, dated Aug. 14, 2017, referenced in the NRC special inspection report. However, we did find the HI-Storm UMAX System FSAR, Rev. 5, dated June 27, 2018. Not~bly the procedure in this document for downloading starts with using the same procedure as-for the HI-STORM FW which does not have a shield ring. It describes the entire procedure, but fails to even mention the shield ring in the UMAX system and the majo_r constraints related to clearance of only 0.25 inches for the entire circumference of the canister. The date of this document was in the summer of 2018, preceding the potential load drop by only a few months. This engineering change, the addition of the shield ring, carried over to deficient worker training when workers were trained on simulator canisters that had 0.75 inches more clearance space than the actual canisters which had only 0.25 inches of clearance. The size of the actual clearance allowance compared to the enormous size of the canister should have alerted everyone involved to the difficulties associated with transfer operations. This is not a highly technical issue. Common sense was needed.
2
Recommendation: The Final Safety Analysis Report should be withdrawn and a full engineering review should take place.
II A Root Cause Evaluation was prepared by Holtec Intl., but that analysis has been labeled proprietary and it therefore is not being made available to the public. The public has a right to adequate information about the root of the problem, as well as to the adequacy of corrective measures. The summary of Holtec's evaluation is insufficient.
The summary of the root cause evaluation shows that the root cause was failure to implement the necessary level of oversight for the level of complexity and risks associated with downloading.
However, Contributing Cause #2 finds fault with the design review process because it failed to identify and address unintended consequences. We call that a fundamental engineering design problem, which requires further action.
NRC's review ofHoltec's root cause evaluation and SCE's apparent cause evaluation identified multiple operational issues: inadequate training, inadequate procedures, poor utilization of corrective action program and insufficient oversight.
Even if proprietary issues exist, the scope of the analysis and the findings of the root cause analysis should be made available so the public can play its legitimate role in our democracy.
Unfortunately, Holtec's Responsibility around the Design Change and the adequacy ofNRC's review are not being examined at all.
Holtec should be held responsible for this Design Problem that has caused permanent damage to 29 canisters, and required to take corrective action for the engineering design.
III Current NRC Investigation and Enforcement is entirely directed at SCE and operational issues, including supervision because SCE is the licensee. Even Holtec's role as the Subcontractor for the ISIFI has not been adequately examined.
The NRC Special Inspection Report prepared based on the Sept. lo-14th, 2018 inspection interviewed staff about the incident which included subcontractor staff of Holtec. A previous misalignment incident occurred on July 22nd, 2018, and was documented by subcontractor staff.
Neither the licensee, SCE, nor the subcontractors prepared condition reports for the misalignments and contacts of the canister with the vault for corrective action. Interviews with staff revealed that key information about alignment difficulties was not being shared with others, so that those involved on Aug. 3rd were not prepared. For seven months of 2018, noise-producing contacts between the canister and vault components occurred, causing damage without an assessment and without entry into a corrective action program. This was a Severity Level IV violation.
During downloading of a canister, redundant drop protection must be maintained-this failure on August 3rd was never even analyzed in the FSAR, Final Safety Analysis report, for the system.
The loss of redundancy was an unanalyzed condition, because it was never supposed to occur.
3
NRC determined that personnel involved in these critical operations were not adequately trained for their position and certified as having adequate proficiency. Workers were also not under supervision of adequately trained and certified personnel. This was also a Severity IV violation.
Too few workers were involved in the downloading and visibility associated with "threading the needle" or inserting the canister in the vault was impossible. Even the fact that the canister had not been inserted fully was not observed. It was only the high radiation readings that called attention to the fact that the load had not been downloaded. Supervisory personnel were 150 feet away for radiation protection. The NRC inspection noted that neither the licensee nor the contractor provided adequate*supervisory oversight during the Aug. 3rd incident. Written procedures were not adequate, a Severity Level IV violation.
There are multiple violations associated with the employees of SCE and Holtec subcontractors.
NRC has not differentiated between the two groups at all in its inspection report. In the Jan. 24th webinar, SCE described the addition of large numbers of workers for specific duties including supervision and oversight. We were not provided with the exact numbers of workers however, and this issue should be clarified.
We understand that SCE is the licensee. However, the use of subcontractors by large companies for potentially dangerous operations is a well understood strategy to escape some of the responsibility and liability. This situation is unique because Holtec manufactured and sold the equipment to SCE and was contracted as a turnkey subcontractor for fuel management at the ISFSI. Holtec knows the system design and as a full service contractor should have provided the most complete training and written materials for its workers.
Here is a summary of the contract with Holtec.
"On Dec. 3, 2014, SCE signed a client-assisted, turnkey, contract with Holtec International for the construction of an expanded Independent Spent Fuel Storage Installation (ISFSI), supply of Multipurpose Canisters (MPCs-foel storage containers), and movement of spent fuel from the spent fuel pool to the ISFSI. Holtec is a Certificate of Compliance holder for both the MPCs and the ISFSis and has and approved 10 CFR 72 Quality Assurance Program. The contract was structured such that Holtec was to work to Holtec-developed procedures, training and processes." 1,
IV The D:amage to* the, canister caused by the shield ring, scratching and gouging the canister as it is loaded, is not being disclosed to the public.
First NRC has not made the Scratch analysis.of the canisters available to the public. Second, NRC is allowing this damage to be unexamined and only entered into an aging management program.
At the January 24th meeting, SCE reported that they performed some sort of scratch analysis on the damage to the canisters already loaded in vaults. Not clearly explained was how such an 1 Summary of the Root Cause and Apparent Cause Evaluation of August 2018 Download Event at SONGS, prepared by SCE Oct. 2018, p. 3 4
analysis was performed, if the canisters were not actually examined. How could it be determined that the outcome of the gouging/scratching was insignificant, if the canisters were not inspected?
The analysis has been labeled proprietary and thus NRC has not made it available to the public.
Finally NRC in the absence of solid information about the extent of damage is allowing the canister damage to merely be entered into an aging management program. It is not clear that the canisters will ever be examined as there is no facility on-site that would enable workers to view the exterior of the canisters without obtaining excessive radiation exposure. This problem could be solved by ~uilding a small room with radiation-shielded walls and shielded windows to enclose the canister, so it could be fully viewed on all sides. Instruments could be added to measure the gouging and scratching.
Stainless steel canisters at San Onofre are in an ideal environment for corrosion of steel canisters to be initiated and to proceed more rapidly than at other locations around the country. Failing to examine the scratching and gouging damage now deprives the nation of important information about the rapidity of corrosion in a salt air environment given this damage.
These canisters have cost millions of dollars and 29 have already been damaged due to gross negligence. Why would NRC allow another 44 to also be damaged, because the corrective measures identified do not really solve the problem? The public is ultimately being billed and if these partial measures prove inadequate the bill will dramatically escalate. High costs would be a situation where the canisters must be replaced because of this damage prior to transport elsewhere. Even higher costs would involve unknown cracks through the entire canister wall that release the radioactive contents.
V NRC by focusing solely on operational and management issues at SCE is failing to understand the importance of this engineering design problem and ensuring that it is properly addressed. This impacts the safety of the San Onofre facility and the ultimate costs of solving the problem. Even more far reaching-- this UMAX system is what Holtec, Intl. plans to use for a Consolidated Interim Storage facility in New Mexico, which is currently undergoing NRC review.
The only reasonable path forward is to fully analyze the engineering design problem to determine whether the shield ring should be removed altogether; this design change was clearly not adequately reviewed. The use of an automatic system for loading would possibly be capable of perfectly aligning the canister rigidly to avoid gouging or scratching. However, another solution may be needed. Only thorough analysis and correction of the engineering design problems associated with the UMAX system are appropriate given all the facts learned at San Onofre and for any future operations using the UMAX system by Holtec elsewhere in the country.
5
G\\~
~nmental
@alitiOI\\_,
Scott Morris Regional Administrator US NRC Region IV 1600 E. Lamar Blvd.
Arlington, TX 76011-4511 Main Office: 422 Oakland Valley Rd. Cuddebackville, NY 12729 Phone 845-754-7951
- E-mail: warrenba@msn.com Jan.31,2019 RECEIVED FEB - 8 2019 NMS Re: San Onofre Potential Load Drop Incident & Canister Damage
Dear Administrator Morris,
I have participated in NRC presentations and an enforcement conference related to the August Potential Load Drop Incident at San Onofre. I have written up my concerns related to the underlying engineering problems and the need for them to be addressed, instead of treating the issues as merely operational and management problems. Please see attached.
Thank you for your attention.
Sincerely, ~J..9Y~)
Barbara J. Warren, RN, MS Executive Director Enclosure A Clean Environment* Green Purchasing* Pollution Prevention* Healthy People* Green Jobs* Zero Waste A Healthy Economy* A Sustainable Future
San Onofre Potential Drop Load Incident with Spent Nuclear Fuel B.Warren The incident in question was the potential drop of a canister loaded with Spent Nuclear Fuel on August 3, 2018. It was reported to the public by a whistleblower at a public meeting.
Since that time NRC has held a public information session and on January 24th, 2019 NRC held a Pre-Decisional Enforcement Conference with Southern California Edison (SCE) only. The meeting on January 24th had 400 people registered for the webinar. We don't know how many attended the meeting in person. This was a lengthy meeting yet the key issue was only briefly mentioned as an aside-the engineering design change. Instead the majority of the meeting focused on the operational improvements Southern California Edison has made to their procedures. Holtec Intl. was not in attendance and their role and their subsequent analysis was only briefly summarized.
I The root of the misalignment problem is an Engineering Design problem related to an added component, the Shield Ring, which was apparently never adequately evaluated.
At the meeting the mention of this engineering design problem lasted only a couple of minutes-skipping to other topics quickly. The shield ring was a late amendment to the UMAX storage system.
It is critical here to note that years earlier the San Onofre Nuclear plant attempted to replace steam generators in both units that were not "like for like" replacements. The design had been substantially changed and instead of going through the normal review process, San Onofre officials claimed the new generators were essentially the same as the originals. Obviously we are not going to review the entire history of this very serious error and fraud. However, the fact that a second engineering design problem has reared its head at the same reactor facility is very disturbing.
However, even more disconcerting is the fact that NRC is treating this entire episode as an operational problem involving only SCE, the utility. We have struggled to find and review relevant documents. We could not locate the HI-Storm UMAX System FSAR, Rev. 4, dated Aug. 14, 2017, referenced in the NRC special inspection report. However, we did find the HI-Storm UMAX System FSAR, Rev.5, dated June 27, 2018. Notably the procedure in this document for downloading starts with using the same procedure as for the HI-STORM FW which does not have a shield ring. It describes the entire procedure, but fails to even mention the shield ring in the UMAX system and the major constraints related to clearance of only 0.25 inches for the entire circumference of the canister. The date of this document was in the summer of 2018, preceding the potential load drop by only a few months. This engineering change, the addition of the shield ring, carried over to deficient worker training when workers were trained on simulator canisters that had O. 7 5 inches more clearance space than the actual canisters which had only 0.25 inches of clearance. The size of the actual clearance allowance compared to the enormous size of the canister should have alerted everyone involved to the difficulties associated with transfer operations. This is not a highly technical issue. Common sense was needed.
2
Recommendation: The Final Safety Analysis Report should be withdrawn and a full engineering review should take place.
II A Root Cause Evaluation was prepared by Holtec Intl., but that analysis has been labeled proprietary and it therefore is not being made available to the public. The public has a right to adequate information about the root of the problem, as well as to th~
adequacy of corrective measures. The summary of Holtec's evaluation is insufficient.
The summary of the root cause evaluation shows that the root cause was failure to implement the necessary level of oversight for the level of complexity and risks associated with downloading.
However, Contributing Cause #2 finds fault with the design review process because it failed to identify and address unintended consequences. We call that a fundamental engineering design problem. which requires further action.
NRC's review of Holtec's root cause evaluation and SCE's apparent cause evaluation identified multiple operational issues: inadequate training, inadequate procedures, poor utilization of corrective action program and insufficient oversight.
Even if proprietary issues exist, the scope of the analysis and the findings of the root cause analysis should be made available so the public can play its legitimate role in our democracy.
Unfortunately, Holtec's Responsibility around the Design Change and the adequacy ofNRC's review are not being examined at all.
Holtec should be held responsible for this Design Problem that has caused permanent damage to 29 canisters, and required to take corrective action for the engineering design.
III Current NRC Investigation and Enforcement is entirely directed at SCE and operational issues, including supervision because SCE is the licensee. Even Holtec's role as the Subcontractor for the ISIFI has not been adequately examined.
The NRC Special Inspection Report prepared based on the Sept. IO-14th, 2018 inspection interviewed staff about the incident which included subcontractor staff of Holtec. A previous misalignment incident occurred on July 22nd, 2018, and was documented by subcontractor staff.
Neither the licensee, SCE, nor the subcontractors prepared condition reports for the misalignments and contacts of the canister with the vault for corrective action. Interviews with staff revealed that key information about alignment difficulties was not being shared with others, so that those involved on Aug. 3rd were not prepared. For seven months of 2018, noise-producing contacts between the canister and vault components occurred, causing damage without an assessment and without entry into a corrective action program. This was a Severity Level IV violation.
During downloading of a canister, redundant drop protection must be maintained-this failure on August 3rd was never even analyzed in the FSAR, Final Safety Analysis report, for the system.
The loss of redundancy was an unanalyzed condition, because it was never supposed to occur.
3
NRC determined that personnel involved in these critical operations were not adequately trained for their position and certified as having adequate proficiency. Workers were also not under supervision ofadequately trained and certified personnel. This was also a Severity IV violation.
Too few workers were involved in the downloading and visibility associated with "threading the needle" or inserting the canister in the vault was impossible. Even the fact that the canister had not been inserted fully was not observed. It was only the high radiation readings that called attention to the fact that the load had not been downloaded. Supervisory personnel were 150 feet away for radiation protection. The NRC inspection noted that neither the licensee nor the contractor provided adequate supervisory oversight during the Aug. 3rd incident. Written procedures were not adequate, a Severity Level IV violation.
There are multiple violations associated with the employees of SCE and Holtec subcontractors.
NRC has not differentiated between the two groups at all in its inspectionreport. In the Jan. 24th webinar, SCE described the addition of large numbers of workers for specific duties including supervision and oversight. We were not provided with the exact numbers of workers however, and this issue should be clarified.
We understand that SCE is the licensee. However, the use of subcontractors by large companies for potentially dangerous operations is a well understood strategy to escape some of the responsibility and liability. This *situation is unique because Holtec manufactured and sold the equipment to SCE and was contracted as a turnkey subcontractor for fuel management at the ISFSI. Holtec knows the system design and as a full service contractor should have provided the most complete training and_written n1aterials for its workers.
Here is a summary of the contract with Holtec.
"On Dec. 3, 2014, SCE signed a client-assisted, turnkey, contract with Holtec International for the construction of an expanded Independent Spent Fuel Storage Installation (ISFSI), supply of Multipurpose Canisters (MPCs-fuel storage containers), and movement. of spent fuel from the spent fuel pool to the ISFSI. Holtec is a Certificate of Compliance holder for both the MPCs and the ISFSis and has and approved 10 CFR 72 Quality Assurance Program. The contract was structured such that Holtec was to work to Holtec-developed procedures, training and processes." 1 IV The Damage to the canister caused by the shield ring, scratching and gouging the canister as. it is loaded, is not being disclosed to the public.
First NRC has not made the Scratch analysis of the canisters available to the public. Second, NRC is allowing this damage to be unexamined and only entered into an aging management program.
At the January 24th meeting, SCE reported that they performed.some sort of scratch analysis on the damage to the canisters already loaded in vaults. Not clearly explained was how such an 1 Summary of the Root Cause and Apparent Cause Evaluation of August 2018 Download Event at SONGS, prepared*by SCE Oct. 2018, p. 3 4
analysis was performed, if the canisters were not actually examined. How could it be determined that the outcome of the gouging/scratching was insignificant, if the canisters were not inspected?
The analysis has been labeled proprietary and thus NRC has not made it available to the public.
Finally NRC in the absence of solid information about the extent of damage is allowing the canister damage to merely be entered into an aging management program. It is not clear that the canisters will ever be examined as there is no facility on-site that would enable workers to view the exterior of the canisters without obtaining excessive radiation exposure. This problem could be solved by building a small room with radiation-shielded walls and shielded windows to enclose the canister, so it could be fully viewed on all sides. Instruments could be added to measure the gouging and scratching.
Stainless steel canisters at San Onofre are in an ideal environment for corrosion of steel canisters to be initiated and to proceed more rapidly than at other locations around the country. Failing to examine the scratching and gouging damage now deprives the nation of important information about the rapidity of corrosion in a salt air environment given this damage.
These canisters have cost millions of dollars and 29 have already been damaged due to gross negligence. Why would NRC allow another 44 to also be damaged, because the corrective measures identified do not really solve the problem? The public is ultimately being billed and if these partial measures prove inadequate the bill will dramatically escalate. High costs would be a situation where the canisters must be replaced because of this damage prior to transport elsewhere. Even higher costs would involve unknown cracks through the entire canister wall that release the radioactive contents.
V NRC by focusing solely on operational and management issues at SCE is failing to understand the importance of this engineering design problem and ensuring that it is properly addressed. This impacts the safety of the San Onofre facility and the ultimate costs of solving the problem. Even more far reaching-- this UMAX system is what Holtec, Intl. plans to use for a Consolidated Interim Storage facility in New Mexico, which is currently undergoing NRC review.
The only reasonable path forward is to fully analyze the engineering design problem to determine whether the shield ring should be removed altogether; this design change was clearly not adequately reviewed. The use of an automatic system for loading would possibly be capable of perfectly aligning the canister rigidly to avoid gouging or scratching. However, another solution may be needed. Only thorough analysis and correction of the engineering design problems associated with the UMAX system are appropriate given all the facts learned at San Onofre and for any future operations using the UMAX system by Holtec elsewhere in the country.
5
Troy Pruett Director Division of Nuclear Materials Safety US NRC Region IV 1600 E. Lamar Blvd.
Arlington, TX 76011-4511 Main Office: 422 Oakland Valley Rd. Cuddebackville, NY 12729 Phone 845-754-7951
- E-mail: warrenba@msn.com Jan.31,2019 RECEIVED FEB - 8 2019 DN~S Re: San Onofre Potential Load Drop Incident & Canister Damage
Dear Director Pruett,
I have participated in NRC presentations and an enforcement conference related to the August Potential Load Drop Incident at San Onofre. I have written up my concerns related to the underlying engineering problems and the need for them to be addressed, instead of treating the issues as merely operational and management problems. Please see attached.
Thank you for your attention.
Sincerely,
~Q9f--~
Barbara]. ~en, RN, MS Executive Director A Clean Environment* Green Purchasing* Pollution Prevention* Healthy People* Green Jobs* Zero Waste A Healthy Economy* A Sustainable Future
San Onofre Potential Drop Load Incident with Spent Nuclear Fuel B.Warren The incident in question was the potential drop of a canister loaded with Spent Nuclear Fuel on August 3, 2018. It was reported to the public by a whistleblower at a public meeting.
Since that time NRC has held a public information session and on January 24th, 2019 NRC held a Pre-Decisional' Enforcement Conference with Southern California Edison (SCE) only. The meeting on January 24th had 400 people registered for the webinar. We don't know how many attended the meeting in person. This was a lengthy meeting yet the key issue was only briefly mentioned as an aside-the engineering design change. Instead the majority of the meeting focused on the operational improvements Southern California Edison has made to their procedures. Holtec Intl. was not in attendan.ce and their role and their subsequent analysis was only briefly summarized.
I The root of the misalignment problem is an Engineering Design problem related to an added component, the Shield Ring, which was apparently never adequately evaluated.
At the meeting the mention of this engineering design problem lasted only a couple of minutes-skipping to other topics quickly. The shield ring was a late amendment to the UMAX storage system.
It' is critical here to note that years earlier the San Onofre Nuclear plant attempted to replace steam generators in both units that were not "like for like" replacements. The design had been substantially changed arid instead of going through the normal review process, San Onofre officials claimed the new generators were essentially the same as the originals. Obviously we are not going to review the entire history of this very serious error and fraud. However, the fact that a second engineering design problem has reared its head at the same reactor facility is very disturbing.
However, even more disconcerting is the fact that NRC is treating this entire episode as an operational problem involving only SCE, the utility. We have struggledto find and review relevant doc~ents. We could not locate the HI-Storm UMAX System FSAR, Rev. 4, dated Aug. 14, 2017, referenced in the NRC special inspection report. However, we did find the HI-Storm UMAX System FSAR, Rev. 5, dated June 27, 2018. Notably the procedure in this document for downloading starts with using the same procedure as for the HI-STORM FW which does not have a shield ring. It describes the entire procedure, but fails to even mention the shield ring in the UMAX system and the major constraints related to clearance of only 0.25 inches for the entire circumference of the canister. The date of this document was in the summer of 2018, preceding the potential foad drop by only a few months. This engineering change, the addition of the shield ring, carried over to deficient worker training when workers were trained on simulator canisters that had 0.75 inches more clearance space than the actual canisters which had only 0.25 inches of clearance. The size of the actual clearance allowance compared to the enormous *size of the canister should have alerted everyone involved to the difficulties associated with transfer operations. This is not a highly technical issue. Common sense was needed.
2
Recommendation: The Final Safety Analysis Report should be withdrawn and a full engineering review should take place.
II A Root Cause Evaluation was prepared by Holtec Intl., but that analysis has been labeled proprietary and it therefore is not being made available to the public. The public has a right to adequate information about the root of the problem, as well as to the adequacy of corrective measures. The summary of Holtec's evaluation is insufficient.
The summary of the root cause evaluation shows that the root cause was failure to implement the necessary level of oversight for the level of complexity and risks associated with downloading.
However, Contributing Cause #2 finds fault with the design review process because it failed to identify and address unintended consequences. We call that a fundamental engineering design problem. which requires further action.
NRC's review of Holtec's root cause evaluation and SCE's apparent cause evaluation identified multiple operational issues: inadequate training, inadequate procedures, poor utilization of corrective action program and insufficient oversight.
Even if proprietary issues exist, the scope of the analysis and the findings of the root cause analysis should be made available so the public can play its legitimate role in our democracy.
Unfortunately, Holtec's Responsibility around the Design Change and the adequacy ofNRC's review are not being examined at all.
Holtec should be held responsible for this Design Problem that has caused permanent damage to 29 canisters, and required to take corrective action for the engineering design.
III Current NRC Investigation and Enforcement is entirely directed at SCE and operational issues, including supervision because SCE is the licensee. Even Holtec's role as the Subcontractor for the ISIFI has not been adequately examined.
The NRC Special Inspection Report prepared based on the Sept. IO-14th, 2018 inspection interviewed staff about the incident which included subcontractor staff of Holtec. A previous misalignment incident occurred on July 22°d, 2018, and was documented by subcontractor staff.
Neither the licensee, SCE, nor the subcontractors prepared condition reports for the misalignments and contacts of the canister with the vault for corrective action. Interviews with staff revealed that key information about alignment difficulties was not being shared with others, so that those involved on Aug. 3rd were not prepared. For seven months of 2018, noise-producing contacts between the canister and vault components occurred, causing damage without an assessment and without entry into a corrective action program. This was a Severity Level IV violation.
During downloading of a canister, redundant drop protection must be maintained-this failure on August 3rd was never even analyzed in the FSAR, Final Safety Analysis report, for the system.
The loss of redundancy was an unanalyzed condition, because it was never supposed to occur.
3
NRC determined that personnel involved in these critical operations were not adequately trained for their position and certified as having adequate proficiency. Workers were also not under supervision of adequately trained and certified personnel. This was also a Severity IV violation.
Too few work~rs were involved in the downloading and visibility associated with "threading the needle;' or inserting the canister in the vault was impossible. Even the fact that the canister had not been inserted fully was not observed. It was only the high radiation readings that called attention to the fact that the load had not been downloaded. Supervisory personnel were 150 feet away for radiation protection. The NRC inspection noted that neither the licensee nor the contractor provided adequate supervisory oversight during the Aug. 3rd incident. Written procedures were not adequate, a Severity Level IV violation.
There are multiple violations associated with the employees of SCE and Holtec subcontractors.
NRC has not differentiated between the two groups at all in its inspection report. In.the Jan. 24th webinar, SCE described the addition oflarge numbers of workers for specific.. duties including supervision and oversight. We were not provided with the exact numbers of workers however, and this issue should be clarified.
We understand that SCE is the licensee. However, the use of subcontractors by large companies for potentially dangerous operations is a well understood strategy to escape some of the responsibility and liability. This situation is unique because Holtec manufactured and sold the equipment to SCE and was contracted as a turnkey subcontractor for fuel management at the ISFSI.. Holtec knows the system des_ign and as a full service contractor.should have.provided the most complete trainiri.g and written materials for its workers.
Here is a summary of the contract with Holtec.
"On Dec. 3, 2014, SCE signed a client-assisted, turnkey, contract with Holtec International for the construction of an expanded Independent Spent Fuel Storage Installation (ISFSI), supply of Multipurpose Canisters (MPCs-fuel storage containers), and movement of spent fuel from the spent fuel pool to the ISFSI. Holtec is a Certificate of Compliance holder for both the MPCs and the ISFSis and has and approved 10 CFR 72 Quality Assurance Program. The contract was structured such that Holtec was to work to Holtec-developed procedures, training and processes." 1 IV The Damage to the canister caused by the shield ring, scratching and gouging the canister as it is loaded, is not being disclosed to the public.
First NRC has not made the Scratch analysis of the canisters available to the public. Second, NRC is allowing this damage to be unexamined and only entered into an aging management program.
At the January 24th meeting, SCE reported that they performed some sort of scratch analysis on the damage to-the cani.sters already loaded in vaults. Not clearly explained was how such an 1 Summary of the Root Cause and Apparent Cause Evaluation of August 2018 Download Event at SONGS, prepared by SCE Oct. 2018, p. 3 4
analysis was performed, if the canisters were not actually examined. How could it be determined that the outcome of the gouging/scratching was insignificant, if the canisters were not inspected?
The*analysis has been labeled proprietary and thus NRC has not made it available to the public.
Finally NRC in the absence of solid information about the extent of damage is allowing the canister damage to merely be entered into an aging management program. It is not clear that the canisters will ever be examined as there is no facility on-site that would enable workers to view the exterior of the canisters without obtaining excessive radiation exposure. This problem could be solved by building a small room with radiation-shielded walls and shielded windows to enclose the canister, so it could be fully_ viewed on all sides. Instruments could be added to measure the gouging and scratching.
Stainless steel canisters at San Onofre are in an ideal environment for corrosion of steel canisters to be initiated and to proceed more rapidly than at other locations around the country. Failing to examine the scratching and gouging damage now deprives the nation of important information about the rapidity of corrosion in a salt air environment given this damage.
These canisters have cost millions of dollars and 29 have already been damaged due to gross negligence. Why would NRC allow another 44 to also be damaged, because the corrective measures identified do not really solve the problem? The public is ultimately being billed and if these partial measures prove inadequate the bill will dramatically escalate. High costs would be a situation where the canisters must be replaced because of this damage prior to transport elsewhere. Even higher costs would involve unknown cracks thrnugh the entire canister wall that release the radioactive contents.
V NRC by focusing solely on operational and management issues at SCE is failing to understand the importance of this engineering design problem and ensuring that it is properly addressed. This impacts the safety of the San Onofre facility and the ultimate costs of solving the problem. Even more far reaching-- this UMAX system is what Holtec, Intl. plans to use for a Consolidated Interim Storage facility in New Mexico, which is currently undergoing NRC review.
The only reasonable path forward is to fully analyze the engineering design problem to determine whether th~ shield ring should be removed altogether; this design change was clearly not adequately reviewed. The use of an automatic system for loading would possibly be capable of perfectly aligning the canister rigidly to avoid gouging or scratching. However, another solution may be needed. Only thorough analysis and correction of the engineering design problems associated with the UMAX system are appropriate given all the facts learned at San Onofre and for any future operations using the UMAX system by Holtec elsewhere in the country.
5