2/4/2021 - Category 3 Public Meeting - NRC Presentation 10 CFR Part 53 Licensing and Regulation of Advanced Nuclear Reactors Objectives and Structure and Subpart D Preliminary Proposed Rule Language
ML21032A045
Person / Time
Issue date: 02/03/2021
From: Robert Beall
NRC/NMSS/DREFS/RRPB
To:
Beall, Robert
References
10 CFR Part 53, NRC-2019-0062, RIN 3150-AK31
Download: ML21032A045 (97)


Text

10 CFR Part 53 Licensing and Regulation of Advanced Nuclear Reactors Objectives and Structure Subpart D Preliminary Proposed Rule Language February 4, 2021 1

Agenda 10:00am - 10:20am Logistics, Introductions, and Goals for Meeting 10:20am - 11:15am Goals and Success Criteria for Part 53 Rulemaking Activity 11:15am - 12:45pm Key Concepts and Possible Structures 12:45pm - 1:30pm Lunch Break 1:30pm - 2:15pm Approach to Rule Language and Developing Key Guidance Documents 2:15pm - 3:00pm Discussion of Previously Released Subparts 3:00pm - 4:15pm Subpart D - Siting Requirements 4:15pm - 4:30pm Additional Public Comments/Closing Remarks 2

Welcome/Introductions Welcome:

John Segala, NRR - Branch Chief of the Advanced Reactor Policy Branch Speakers/Presenters:

Bob Beall, NMSS - Rulemaking PM & Meeting Facilitator Nanette Valliere, NRR - Technical Lead Bill Reckley, NRR - Technical Lead Nuclear Energy Institute U.S. Nuclear Industry Council Union of Concerned Scientists Public Meeting Slides: ADAMS Accession No. ML21032A045 3

Purpose of Todays Meeting

  • Discuss the broader objectives and overall structure of Part 53
  • Review preliminary proposed rule language for Part 53 o Subpart D - Siting Requirements
  • Todays meeting is a Category 3 public meeting, which means that public participation is actively sought in the discussion of the regulatory issues during the meeting.

o This meeting is being held in a workshop format to facilitate the discussion to todays topics.

o The meeting is being transcribed and the transcription will be available with the meeting summary by March 5, 2021.

  • No regulatory decisions will be made at todays meeting.

4

NRC Staff Plan to Develop Part 53 Subpart B Subpart C Subpart D Subpart E Subpart F Subpart G Project Life Cycle Design and Siting Construction Operation Retirement Analysis Requirements External Facility Safety Definition System Hazards Construction/ Plan

  • Fundamental Safety & Component Manufacturing Design Site Surveillance Functions Characteristics Ensuring Maintenance
  • Prevention, Mitigation, Analysis Capabilities/

Performance Criteria Requirements Configuration Environmental Reliabilities (e.g., F-C Targets) Control Considerations

  • Normal Operations Safety Change Control (e.g., effluents) Categorization Design
  • Other & Special Environmental Changes Treatment Considerations Staffing &

Programs Plant/Site (Design, Construction, Configuration Control)

Clarify Controls Analyses (Prevention, Mitigation, Compare to Criteria) and Distinctions Between Plant Documents (Systems, Procedures, etc.)

LB Documents (Applications, SAR, TS, etc.) Subparts H & I 5

NRC Staff Engagement Plan Stakeholder Interactions Framework Safety Criteria Design Siting Construction Operations Decommissioning Licensing General/Admin Sept 20 Nov 20 Dec 20 Jan 21 Feb 21 Mar 21 Apr 21 May 21 Jun 21 Jul 21 Consolidated Technical Sections Aug 21 Sept 21 Consolidated Technical Sections Oct 21 Nov 21 Consolidated Rulemaking Package Dec 21 Jan 22 ACRS Full Committee Feb 22 Mar 22 Apr 22 May 22 Draft Proposed Rulemaking Package to the Commission Jun 22 Jul 22 Aug 22 Sept 22 Oct 22 Concept/Introduction Note that this is a living schedule and will be updated as needed throughout the rulemaking process.

Discussion Upcoming introductions of concepts and discussions of preliminary rule language will involve a variety of Interim Staff Resolution topics that have historically involved specific technical and programmatic specialties. To that end, stakeholders are encouraged to ensure that appropriate subject matter experts are involved in discussions of rule language and plans for guidance documents. An example is concepts and discussions within Subpart F (operations) that involve staffing levels and operator licensing.

6

Goals and Success Criteria for Part 53 Rulemaking Activity 7

Part 53 Rulemaking Objectives NRC Staff Perspectives

  • Provide reasonable assurance of adequate protection of the public health and safety and common defense and security at reactor sites at which advanced nuclear reactor designs are deployed, to at least the same degree of protection as required for current-generation light water reactors;
  • Protect health and minimize danger to life or property to at least the same degree of protection as required for current-generation light water reactors;
  • Provide greater operational flexibilities where supported by enhanced margins of safety that may be provided in advanced nuclear reactor designs;
  • Ensure that the requirements for licensing and regulating advanced nuclear reactors are clear and appropriate; and
  • Identify, define, and resolve additional areas of concern related to the licensing and regulation of advanced nuclear reactors.

8

Part 53 Rulemaking Marc Nichol Senior Director New Reactors February 4, 2021

©2020 Nuclear Energy Institute

Goals and Success Criteria Vision and Goals Vision: Licensing new reactors under the new rule will be the most efficient option for all new reactor applicants and will meet industry needs for schedule, cost and predictability, consistent with congressional directives, the NRCs own advanced reactor policies and initiatives, and the agencys Principles of Good Regulation.

Goals:

  • Safety-Focused: Focus on reasonable assurance of adequate protection
  • Technology-Inclusive: All technologies, high-level requirements
  • Efficient: Schedule/cost targets integrated safety/security, commercial quality
  • Flexible: Variety of licensing approaches, reactor uses, interface with Part 50/52
  • Informed: Insights from previous efforts, near term activities, and other regulators
  • Clear: Nexus to adequate protection, interrelationship of requirements, concise Source: NEI Letter from October 21, 2020

©2020 Nuclear Energy Institute 11

Success Criteria (Project Requirements)

Purpose:

to define what functionality needs to be provided in the final Part 53 rule

  • Guide the Part 53 rule development
  • Plan future discussions between the NRC staff and stakeholders
  • Ensure that the final rule meets the pre-defined success criteria Define what Part 53 must accomplish (e.g., establish safety requirements)
  • Not how to do it (e.g., specifying the dose limits for members of the public)
  • Not the process by which to develop the new rule Align with the direction in the Nuclear Energy Innovation and Modernization Act, and the vision and goals that we proposed in NEIs October 21, 2020 letter Intended to be exhaustive, but there could be additional criteria identified over the course of the rulemaking, and further clarification of scope Source: NEI Letter from December 23, 2020

©2020 Nuclear Energy Institute 12

Proposed Success Criteria (Selected Higher-Level criteria)

Define the scope of Part 53 (e.g., types of licenses granted, types of activities regulated)

Define the requirements that provide reasonable assurance of adequate protection

  • Define performance criteria to protect the public
  • Define the safety paradigm for reactors to provide reasonable assurance that the public protection performance criteria are met via the safety paradigm (e.g., radiological hazard, events, safety functions, QA)

Define the information to be included in the licensing bases regulated by the NRC

  • Clarify why required information in the licensing basis is necessary to make a determination of reasonable assurance of adequate protection
  • Include protections against unnecessarily requiring changes to the licensing basis (i.e., finality, backfit and forward fit protections)
  • Include processes to control and change the licensing bases regulated by the NRC Establish the requirements for obtaining licenses
  • Identify other Parts of 10 CFR that are applicable to Part 53 licenses (e.g., Part 20, Part 51)

Establish the requirements for NRC oversight during construction and operations

  • Describe requirements for ensuring the as-constructed plant is the same as the as-approved design
  • Describe requirements for ensuring the plant operations are within the NRC approved limits Guidance - {Success criteria for guidance to be decided during the scoping phase}

Source: NEI Letter from December 23, 2020 ©2020 Nuclear Energy Institute 13

U.S. Nuclear Industry Council Comments for NRC Part 53 Meeting:

Goals and Success Criteria Cyril Draffin Senior Fellow, Advanced Nuclear U.S. Nuclear Industry Council Jeff Merrifield Chairman, Advanced Nuclear Working Group U.S. Nuclear Industry Council U.S. NRC Commissioner (1998-2007) and Reactor Developers 04 February 2021

Goals and Success Criteria for Part 53

  • Risk-informed but not excluding deterministic approach
  • Performance-based with flexibility allowing some combination of risk informed and deterministic
  • Adequate protection only
  • Requirements beyond adequate protection only serve to drive up the cost of licensing and operations with no real safety benefit
  • Achieving operational excellence is important but is best achieved through industry self-oversight, e.g., INPO
  • Technology-inclusive with all reactor types and sizes covered
  • Clear and simple to support streamlined licensing process
  • Licensing requirements are understood and review is straightforward and efficient 15 l U.S. Nuclear Industry Council February 2021 Part 53

Goals and Success Criteria for Part 53 Rulemaking Activity Discussion 16

Key Concepts and Structure 17

Part 53 Key Concepts and Structure NRC Staff Perspectives Key Concepts

  • Requirements based on defining high level safety criteria
  • Two tier structure in safety criteria to support distinctions in regulatory treatment commensurate with safety/risk significance
  • Technical areas to be addressed via Subparts that align with stages for a facilitys lifecycle
  • Licensing, reporting, and other requirements addressed in separate Subparts 18

U.S. Nuclear Industry Council Comments for NRC Part 53 Meeting:

Key Concepts and Possible Structures Cyril Draffin Frank Akstulewicz of Terrestrial Energy Senior Fellow, Advanced Nuclear Dennis Henneke of GE U.S. Nuclear Industry Council Travis Chapman of X-Energy Rebecca Norris of NuScale Jeff Merrifield Ross Moore of Oklo Chairman, Advanced Nuclear Working Group U.S. Nuclear Industry Council U.S. NRC Commissioner (1998-2007) 04 February 2021

Key Concepts and Possible Structures: Process Concern

  • Process does not seem to be transparent
  • NRC requests feedback, but no NRC feedback on how comments factored into the rulemaking process and no redrafted rule language.
  • Subpart B Safety Criteria is the foundation of Part 53 o Instead of discussing and agreeing on Subpart B, NRC proceeding to restate Subpart B language and issue language for other parts of the rule based on unaltered Subpart B language.

o Process is going too fast

  • USNIC does not support the preliminary Subpart B language including the new Tier 1 and Tier 2 categories that industry find confusing.

o USNIC encourages NRC to release revised language for Subpart B before continuing to release other sections based on Subpart B- preferably with some NRC Office of General Council review o USNIC offering alternative Subpart B language 20 l U.S. Nuclear Industry Council February 2021 Part 53

Key Concepts for Part 53

  • Adequate Protection o Rule should specify only that which is necessary for adequate protection and nothing more.

o Any proposals beyond adequate protection should not be included o Proposed language in Subpart B for property protection, defense in depth, and Quantitative Health Objectives (QHOs) not appropriate.

  • Risk-informed Regulations
  • Performance-based Regulations
  • Adequate Defense-in-Depth (DID)
  • Quantitative Health Objectives
  • Quality Assurance Requirements 21 l U.S. Nuclear Industry Council February 2021 Part 53

Adequate Protection Standard for Part 53

  • Focus of Part 53 should provide a clear adequate protection standard (radiological foundation) o Requirements predicated by fundamental safety functions (53.210) o Any requirements established in Part 53 should have a clear nexus to supporting the adequate protection standard o Adequate protection standard should be independent of technology, reactor size, or selected licensing process.
  • Avoid regulatory requirements that are not needed for adequate protection o Do not ratchet up requirements for Advanced Non-LWRs o Do not expand the rule by including Minimize Danger and Protect Property Standard.

o Necessity of second tier criteria for adequate protection has not been established in rulemaking record to date 22 l U.S. Nuclear Industry Council February 2021 Part 53

Adequate Protection Standard for Part 53 (cont.)

  • Other considerations:

o Part 53 should establish the minimum criteria and supporting information necessary for demonstrating the safety case with a level of detail that is commensurate with its contribution to the safety case arguments o Processes for demonstrating the safety case should not be defined in rulemaking 23 l U.S. Nuclear Industry Council February 2021 Part 53

Risk-informed (not-risk based) Regulations (relevant to Subpart C)

  • Probabilistic Risk Assessment (PRA) insights should complement the safety review however 53.450 proposed language and criteria make a complete/detailed PRA an implicit requirement for LBE, SSC classification, DID determinations.

o Want flexibility; use of PRA should be optional if other risk-informed analyses are appropriate to use o LBE, SSC classification, and DID determination is supported by RG 1.233 implementation, but not supported by an applicant performing SSC classification using a deterministic approach.

o Deterministic approaches (e.g., for external hazard assessment, seismic, bounding analyses) may be appropriate and should not be excluded, and some combination of risk informed and deterministic should be allowed.

24 l U.S. Nuclear Industry Council February 2021 Part 53

Risk-informed (not-risk based) Regulations (cont.)

o PRA matures with plant design and site selection/characterization. Therefore, requiring extensive PRA (meeting the PRA standard) with application submittal may not be feasible for all application types.

o Unclear how different levels of PRA usage will impact application content.

Recommend considering the TICAP recommendations in this area - where PRA level of information is minimized to include scope of the PRA, discussion on use of the PRA standard including peer review, and results pertinent to NEI 18-04 o International regulatory frameworks have risk-informed approaches that certain vendors may choose to pursue o Desire that Part 53 would accommodate such approaches (i.e., IAEA SSR-2/1 and markets with dual-DSA/PSA requirements) 25 l U.S. Nuclear Industry Council February 2021 Part 53

Performance-based (and Risk-informed) Regulations

  • Performance-based o Clear performance-based acceptance criteria to allow flexibility in implementation of design features and programmatic controls while improving predictability in the review process (minimum criteria needed for adequate protection allowing applicant selection of approaches and methodologies).

o Performance-based requirements should focus on measurable outcomes (does x perform the way it was committed to perform) and avoid prescription of methods to achieve that performance.

26 l U.S. Nuclear Industry Council February 2021 Part 53

Performance-based (and Risk-informed) Regulations (cont.)

  • Other considerations o Part 53 should accommodate an implementation of Licensing Modernization Project (LMP), but not implicitly require it.

o Performance-based, risk-informed regulations can provide the applicant with flexibility on how to demonstrate compliance.

o Part 53 should be technology and design neutral to minimize the need for exemptions.

o Consider the overall impact and level of detail requirements for Part 53, and its prospective applicant types, and how the language can be used to improve regulatory predictability, efficiency, and certainty.

27 l U.S. Nuclear Industry Council February 2021 Part 53

Adequate Defense in Depth (DID)

  • DID is important in supporting an adequate safety case for both LMP and non-LMP applications, but is best addressed in guidance rather than regulations.
  • Further discussion is needed to better understand and define what is adequate DID for LMP and Non-LMP applications, accounting for the range of potential reactor designs and features that prevents and mitigates accidents that release radiation materials.

o Adequate DID may be different for unique reactors o No precedent or guidance on establishing DID acceptance criteria or what is sufficient DID analysis 28 l U.S. Nuclear Industry Council February 2021 Part 53

Adequate Defense in Depth (DID) (cont.)

  • Multiple DID barriers applied only to DBEs in Part 53?

o Inferred is that DID will have to look at BDBEs in Part 53 - but we just dont know what that looks like without a systematic review of DID like that performed under LMP.

  • In guidance, NRC staff needs to explain how DID would be implemented and used, and provide clarity on how a licensee could translate this approach into preparing an application
  • In guidance, NRC should clarify what Defense in Depth analysis is required when physics or inherent features of a design have already resolved or removed the potential for releases of large amounts of radioactivity 29 l U.S. Nuclear Industry Council February 2021 Part 53

Quantitative Health Objectives (QHO)

  • Draft Subpart B, Technology-Inclusive Safety Requirements, Section 53.23, Second Tier Safety Criteria, (b)(2) requires the applicant to analyze QHO for LBE to ensure

<5E-6 immediate and <2E-6 latent health effects per year o No parallel QHO requirement in 10 CFR 20, 50, or 52.QHO calculations would be required in addition to quantitative limits at site boundaries in 53.23. Q: What was the underlying goal in changing the wording of the existing safety goals in 53.23 (from ML011210381, 51 FR 30028)?

o The QHO method was attempted in 1986 but was deemed impractical and replaced by core damage frequency (CDF) and large early release frequency (LERF) in 1990

  • Recommend removing (b)(2) from 53.23 30 l U.S. Nuclear Industry Council February 2021 Part 53

Quality Assurance Requirements

  • Part 53 provides opportunity for NRC to take a fresh look at Appendix B and NQA-1 Program, and consider alternatives
  • Level of quality of commercially available components may meet and exceed prior nuclear standards without the need for the overly burdensome reporting requirements
  • Recommend rule should state quality control program is necessary, but not provide direction on approaches to use.

31 l U.S. Nuclear Industry Council February 2021 Part 53

Quality Assurance Requirements (cont.)

  • Recommend guidance should indicate that approaches such as ISO 9000 series, IAEA, commercial dedication programs, and other approaches presented by industry could be used- this would facilitate licensing of US reactors in Canada, Europe, Asia, and other parts of the world o International acceptance of a single approval could be important in international marketability o Guidance could address the broader topic of universal acceptance of codes and standards (mechanical, electrical, etc.)
  • Concurrent guidance should be developed to show that the ISO standards and IAEA approaches can meet whatever the requirements are in Part 53, and potentially other Parts.

32 l U.S. Nuclear Industry Council February 2021 Part 53

Possible Structures for Part 53

  • NRC proposed subparts can work o But need understanding/agreement on Subpart B on Safety Criteria before proceeding
  • NRC should maintain public list of other Parts or regulations Part 53 will reference
  • Definitions of Terms used in the rule language are needed, and list should be maintained o Licensing basis events, reasonable assurance, and other terms if not defined in existing Parts 50 and 52
  • Integrated Part 53 licensing initiative
1. Regulatory text (current focus)
2. Guidance (topics requiring guidance need to be identified as regulations are drafted)
3. Review process 33 l U.S. Nuclear Industry Council February 2021 Part 53

Key Concepts and Possible Structures Key Concepts (1/2)

Structured around NRC regulatory functions

  • Determine the standards for reasonable assurance of adequate protection in terms of direct impacts on the of the public health
  • Determine the facility characteristics that are needed to ensure the facility will meet the public protection criteria
  • Determine how to provide reasonable assurance that the facility is designed to achieved the facility safety characteristics
  • Determine how to provide reasonable assurance that the facility is constructed and will operate in accordance with the design
  • Determine the types of licenses, permits and design approvals that the NRC may issue, and the process to obtaining them
  • Determine the information from an applicant or holder of a license, permit or design approval that needs to be reviewed and approved by the NRC to facilitate the regulation of the facility ©2020 Nuclear Energy Institute 35

Key Concepts (2/2)

Key Technical Topics

  • Safety criteria and safety paradigm
  • Reasonable assurance of design/analysis, construction and operations
  • Radiation protection and ALARA Key Process Topics
  • Level of detail/prescription in regulations vs. use of guidance
  • Organization of technical requirements and documentation requirements
  • Relationship with Part 50 and 52 licensing processes (e.g., reference vs. include in Part 53)
  • Licensing basis documentation, including changes ©2020 Nuclear Energy Institute 36

Key Concepts and Structure Discussion 37

MEETING BREAK Meeting to resume in 45 minutes 38

Approach to Rule Language and Developing Key Guidance Documents 39

Approach to Rule Language and Developing Key Guidance Documents NRC Staff Perspectives

  • Work in progress to supplement with guidance documents on content of applications (TICAP/ARCAP)
  • Consistent with ongoing activities in areas such as emergency preparedness, security, siting, and environmental reviews
  • Work in progress by standards development organizations (SDOs) in areas such as high temperature materials, design standards, and probabilistic risk assessment
  • Work being initiated in areas such as human factors, technical specifications, and appropriate special treatments
  • Acknowledge need to identify other key guidance documents and engage stakeholders on their development/endorsement 40

Approach to Rule Language and Developing Key Guidance Documents

Key Regulatory Guidance Higher-level requirements will rely more on guidance for

  • Details that have historically been in regulations
  • Technology-specific considerations
  • Licensing approach considerations Potential topics for guidance
  • Application guidance (scope/content) - e.g., TICAP and NRC ARCAP (including security-related content)
  • Safety and security paradigm (licensing approach) - e.g., NEI 18-04 and risk-informed, performance based approach to security
  • Technology-specific guidance (e.g., key safety functions, design and operation considerations) - None currently
  • Specific technical topics (e.g., graded-approach to PRA, commercial QA standards)

©2020 Nuclear Energy Institute 42

U.S. Nuclear Industry Council Comments for NRC Part 53 Meeting:

Rule language and Previously Released Subparts Cyril Draffin Senior Fellow, Advanced Nuclear U.S. Nuclear Industry Council Jeff Merrifield Chairman, Advanced Nuclear Working Group U.S. Nuclear Industry Council U.S. NRC Commissioner (1998-2007) and Reactor Developers 04 February 2021

Approach to Rule Language and Guidance Documents

  • USNIC does not support the preliminary Subpart B, C or F language o USNIC strongly encourages NRC to redraft Subpart B o USNIC is very skeptical of the Facility Safety Program in Subpart F o USNIC encourages NRC to release revised language for Subpart C, Subpart D, and Subpart F (and any other subparts) only after language for Subpart B has been redrafted.
  • List of expected guidance should be kept and updated 44 l U.S. Nuclear Industry Council February 2021 Part 53

Approach to Rule Language and Developing Key Guidance Documents Discussion 45

Discussion of Previously Released Subparts 46

Discussion of Previously Released Subparts NRC Staff Perspectives

  • Overall Framework
  • Subpart B (Safety Criteria)
  • Subpart C (Design and Analyses)
  • Subpart F (Facility Safety Program)
  • Subpart D (Siting)
  • Under Development
  • Subpart E (Construction)
  • Subpart F (Configuration Control, Personnel, Programs)
  • Subpart G (Decommissioning)
  • Subparts H/I (Licensing)
  • Subparts A/J (General, Administrative, Miscellaneous) 47

U.S. Nuclear Industry Council Comments for NRC Part 53 Meeting:

Rule language and Previously Released Subparts Cyril Draffin Senior Fellow, Advanced Nuclear U.S. Nuclear Industry Council Jeff Merrifield Chairman, Advanced Nuclear Working Group U.S. Nuclear Industry Council U.S. NRC Commissioner (1998-2007) and Reactor Developers 04 February 2021

Subpart B - Technology-Inclusive Safety Requirements Topics

  • Safety Objectives
  • Transient and Accident Radiological Safety Criteria (replaces NRC Tier 1)
  • Routine Operation Radiological Safety Criteria (refers to Part 20 Subpart C & D; no need for separate Protection of Plant Workers section)
  • NRC Tier 2 section not needed for Adequate Protection
  • Safety Functions (better logic to place after Safety Criteria than before)
  • Licensing Basis Events
  • Defense in Depth Objectives 49 l U.S. Nuclear Industry Council February 2021 Part 53

Discussion of Previously Released Subparts

Subpart B - Safety Simplify and clarify the safety criteria

  • Adequate protection - 25 rem for events not expected during lifetime
  • Extra-adequate protection (if necessary) - 0.1 rem for normal operations, and beyond design basis Establish the facility characteristics needed for safety and security
  • Aligned with NRCs bow tie diagram
  • Radiological hazard
  • Characteristics of the site
  • Required facility functions necessary and sufficient to meet safety criteria
  • Event sequences
  • Design features and human actions to perform required facility functions Source: NEI Letter from December 23, 2020 ©2020 Nuclear Energy Institute 51

Subpart C: Design and Analysis Simplify and clarify around updated safety criteria

  • Features that are necessary and sufficient to provide reasonable assurance that the design and analyses demonstrate that the facility is able to meet the safety and security criteria High level requirements that allow flexibility
  • Method for determining facility characteristics (required functions, events, design features)
  • Analysis of SSCs performance of required functions
  • Design requirements and performance criteria for SSCs
  • Method of evaluating risk
  • Measures to address design and analysis uncertainties
  • Qualification of SSCs
  • Categorization of SSCs

©2020 Nuclear Energy Institute 52

Discussion of Previously Released Subparts Discussion 53

Subpart D Siting Requirements 54

Part 53 Outline

  • Previous request to provide outline of preliminary Subpart structure and content
  • Outline being provided to support continuing discussions of preliminary subparts and staff efforts to develop additional subparts
  • Structure and outline subject to change based on ongoing discussions 55

NRC Staff Plan to Develop Part 53 Subpart B Subpart C Subpart D Subpart E Subpart F Subpart G Project Life Cycle Design and Siting Construction Operation Retirement Analysis Requirements External Facility Safety Definition System Hazards Construction/ Plan

  • Fundamental Safety & Component Manufacturing Design Site Surveillance Functions Characteristics Ensuring Maintenance
  • Prevention, Mitigation, Analysis Capabilities/

Performance Criteria Requirements Configuration Environmental Reliabilities (e.g., F-C Targets) Control Considerations

  • Normal Operations Safety Change Control (e.g., effluents) Categorization Design
  • Other & Special Environmental Changes Treatment Considerations Staffing &

Programs Plant/Site (Design, Construction, Configuration Control)

Clarify Controls Analyses (Prevention, Mitigation, Compare to Criteria) and Distinctions Between Plant Documents (Systems, Procedures, etc.)

LB Documents (Applications, SAR, TS, etc.) Subparts H & I 56

Subpart A - General Provisions

  • Scope
  • Definitions
  • Interpretations
  • Written Communications
  • Employee Protection
  • Completeness and Accuracy of Information
  • Specific Exemptions
  • Deliberate Misconduct
  • Combining Licenses; Elimination of Repetition
  • Jurisdictional Limits
  • Attacks and Destructive Acts
  • Information Collection Requirements: OMB Approval 57

Subpart B - Safety Criteria

  • Safety Objectives
  • Safety Functions
  • First Tier Safety Criteria
  • Second Tier Safety Criteria
  • Licensing Basis Events
  • Defense in Depth
  • Protection of Plant Workers 58

Subpart C - Design and Analysis

  • Design Objectives and Design Features
  • Functional Design Criteria for First Tier Safety Criteria
  • Functional Design Criteria for Second Tier Safety Criteria
  • Functional Design Criteria for Protection of Plant Workers
  • Design Requirements
  • Analysis Requirements
  • Safety Criteria and Special Treatment
  • Application of Analytical Safety Margins to Operational Flexibilities
  • Design Control Quality Assurance
  • Design and Analyses Interfaces 59

Subpart D - Siting

  • General Siting
  • External Hazards
  • Site Characteristics
  • Population-Related Considerations
  • Siting Interfaces
  • Environmental Considerations 60

Subpart E - Construction and Manufacturing

  • Scope and Purpose
  • Part 1 - Construction

- (a) Management and Control

- (b) Construction Activities

- (c) Inspection and Acceptance

- (d) Communication

  • Part 2 - Manufacturing

- (a) Management and Control

- (b) Manufacturing Activities

- (c) Fuel Loading

- (d) Communication

- (e) Transportation

- (f) Acceptance and Installation at the Site 61

Subpart F - Operations

  • Transition from Construction/Manufacturing to Operations
  • Part 1 - Maintaining Capabilities and Reliabilities of Safety Related and Safety Significant Equipment

- Design Features and Programs for Normal Operations (53.220(a) Criteria)

- Design Features and Programs for Normal Operations (53.220(b) ALARA Criteria

- Configuration Management for Safety-Related Design Functions

  • Technical Specifications

- Configuration Management for Safety-Significant Design Functions

  • Special Treatment (e.g., Reliability Assurance)
  • Maintenance, Repair and Inspection Programs

- Quality Assurance

- Aging Management Programs

- Design Control

- Facility Safety Program 62

Subpart F - Operations, Contd.

  • Part 2 - Establishing and Maintaining Appropriate Staffing

- Concept for Operations

  • Identifying Role of Personnel in Meeting First Tier Safety Criteria
  • Identifying Role of Personnel in Meeting Second Tier Safety Criteria

- Requirements for Licensed Personnel

  • Staffing
  • Training
  • Medical Requirements
  • Licensing (Applications, Examinations, Licenses)

- Requirements for Non-Licensed Personnel (Graded based on roles)

  • Staffing
  • Training
  • Other Requirements 63

Subpart F - Operations, Contd.

  • Part 3 - Radiation Protection
  • Part 5 - Security Programs
  • Part 6 - Preparing for and Transitioning to Decommissioning 64

Subpart G - Decommissioning

  • Termination of power reactor licenses (transition from operation to possession-only license)
  • Financial assurance for decommissioning
  • Transition to unrestricted use 65

Subpart H - Licensing

  • General
  • Siting

- Site Suitability Reviews

- Limited Work Authorizations

- Early Site Permits

  • Design

- Conceptual Design Reviews?

- Standard Design Approvals

- Design Certifications

- Manufacturing Licenses

  • Manufacturing, Transportation, Deployment
  • Site & Design

- Construction Permit

- Operating License

- Combined Licenses

  • Appendix A (Content Table) 66

Subpart I - Maintaining Licensing Basis

  • Amendments to a license

- Application

- Public notice and consultations

- Issuance

- Including PRA

  • Revocation, suspension, modification of license for cause
  • Commission order for operation after revocation
  • Suspension and operation in war or national emergency (50.54(d))
  • Backfitting and issue finality
  • Information requests (50.54(f))

67

Subpart J - Administrative and Reporting

  • Common Standards
  • Water Pollution Control Act (50.54(aa))
  • Selective Implementation
  • National Emergency, Can Deviate from (relationship to Parts 50, 52) TS (50.54(dd))
  • Reporting
  • Share SNM and Byproduct Material between Units (50.54(ee))
  • Notifications (50.72, 50.73)
  • Need to Address FEMA Deficiencies
  • Financial Qualifications (50.54(gg))
  • Creditor Regulations
  • Receipt of Aircraft Threat (50.54(hh))
  • Enforcement
  • ASME (50.55a) & Quality Standards
  • US/IAEA (50.54(jj))
  • SNM (50.54(b)-(d))
  • Bankruptcy (50.54(cc))
  • Antitrust (50.54(g))
  • Property Insurance (50.54(w))
  • Subject to Laws & Regulations -
  • Liability / Price Anderson (50.54(h))

68

Part 53 General Layout

  • Subpart A, General Provisions
  • Subpart B, Technology-Inclusive Safety Objectives
  • Subpart C, Design and Analysis
  • Subpart D, Siting Requirements
  • Subpart E, Construction and Manufacturing Requirements
  • Subpart F, Requirements for Operation
  • Facility Safety Program
  • Subpart G, Decommissioning Requirements
  • Subpart H, Applications for Licenses, Certifications and Approvals
  • Subpart I, Maintaining and Revising Licensing Basis Information
  • Subpart J, Reporting and Administrative Requirements 69

10 CFR Part 53 Subpart D Layout

  • § 53.500 - General Siting
  • § 53.510 - External Hazards
  • § 53.520 - Site Characteristics
  • § 53.530 - Population-related Considerations
  • § 53.540 - Siting Interfaces
  • § 53.550 - Environmental Considerations 70

§ 53.500 - General Siting

  • Overall siting considerations o Consider site in combination with design features and programmatic controls to satisfy first and second tier safety criteria.

o Identify and assess external hazards and site characteristics that could contribute to initiation, progression, or consequences of licensing basis events.

o Address potential adverse impacts on nearby environs as a result of normal operations or potential accidents.

71

§ 53.510 - External Hazards

  • Structures, systems, and components (SSCs) needed to meet first tier safety criteria must be designed to withstand natural phenomena and man-made hazards.

o SSCs designed to withstand hazards up to design basis levels.

o Design basis external hazard levels must address hazards occurring with both routine frequency and up to 1 in 100,000 years, with added margin.

o SSEGM is level of seismic activity at which SSCs must remain functional.

o The SSEGM for the site is determined considering the results of the geological, seismological, and engineering characteristics of a site and its environs.

72

§ 53.510 - External Hazards (cont.)

  • Analyses required by § 53.450 must address external hazard frequencies and related SSC fragilities.

o Analyses must assess external hazards in order to meet second tier safety criteria.

o Functional design criteria and programmatic controls must be established to maintain performance of SSCs relied upon to meet safety criteria.

73

§ 53.520 - Site Characteristics

  • Meteorological, geological, seismological, topographical, hydrological, and other characteristics of the site and surrounding area that could affect radioactive material escape should be identified, estimated, and considered in the analyses required by Subpart C (Design and Analysis).

74

§ 53.530 - Population-related considerations

  • Every site must have an exclusion area, low population zone, and provide a population center distance as defined in § 53.120. Offsite radiological consequences estimated by analyses required by § 53.450 are used to define:

o Exclusion area such that any individual on the boundary for any two hour period following a release would not receive more than 25 rem total effective dose equivalent (TEDE).

o Low-population zone such that any individual on the boundary following a release would not receive more than 25 rem TEDE.

75

§ 53.530 - Population-related considerations (cont.)

  • Offsite radiological consequences estimated by analyses required by § 53.450 are used to define:

o Population center distance that must be at least one and one-third times the distance from the reactor to the outer boundary of the low population zone.

o Reactor sites should be located away from very densely populated centers. Areas of low population density are, generally, preferred.

76

§§ 53.540 & 53.550 - Siting Interfaces and Environmental Considerations

  • External hazards and site characteristics must be addressed by design features, programmatic controls, and supporting analyses to demonstrate compliance with first and second tier safety criteria.
  • Applicants must demonstrate compliance with environmental protection regulations in accordance with 10 CFR Part 51.

77

Subpart D: Siting Requirements Subpart D: Siting Requirements Incorporation of siting into Part 53 makes sense Opportunity to more efficiently integrate siting into the safety of the facility

  • Integrate into Subpart B: Safety
  • Internal and external events considered in establishing required facility functions, design features and human actions
  • Site characteristics considered (as appropriate)
  • Use of site boundary (align with EPZ) to replace EAB and LPZ
  • Performance-based focus on safety criteria obviates need for considering distance to population center (i.e., prescriptive 53.530 not necessary)

Higher level to allow flexibility

  • Characteristics of the site that have a significant impact on the ability to meet the safety criteria (examples, e.g., seismology, rather than prescriptive)
  • Locate detailed expectations in guidance (e.g., seismic hazard)

©2020 Nuclear Energy Institute 79

U.S. Nuclear Industry Council Comments for NRC Part 53 Meeting:

Subpart D Siting Requirements Cyril Draffin Senior Fellow, Advanced Nuclear U.S. Nuclear Industry Council Jeff Merrifield Chairman, Advanced Nuclear Working Group U.S. Nuclear Industry Council U.S. NRC Commissioner (1998-2007) and Reactor Developers Ross Moore of Oklo 04 February 2021

Subpart D - Siting Requirements- General Comments

  • Siting requirements retain language from original Part 100 text that unnecessarily prohibit advanced reactors from being co-located with populated areas (e.g. to replace old coal-fired power plant), without a clear tie to a safety goal.
  • Scope of required site characteristics and associated analyses should be first informed by risk/safety profile of the facility, and then the specific site as necessary.

o In some cases, restricting guidance language is proposed to be incorporated in rule text (where it was not before) for risk categories that will likely far exceed those of most advanced reactor designs.

  • Some of draft NRC Subpart D language could be put in guidance and not regulations
  • Q: How does the staff plan to coordinate Part 53 requirements for siting with the proposed siting options pertaining to population density in SECY 20-0045?

81 l U.S. Nuclear Industry Council February 2021 Part 53

Subpart D - Siting Requirements- Specific Comments Part 53 Subpart D USNIC Discussion 53.500 General As stated in prior public meetings, USNIC does not support Tier 1 and Tier 2 Siting. categories 53.510 External Q: (a) Clarify why 1 in 100,000 years was chosen (because frequencies should be Hazards informed by safety and risk profile of facility not most limiting criteria). Does sufficient margin refer to margin in the magnitude of the hazard, or margin in the frequency?

Q: (b) Should the size of region and type of data be based on reactor design first, and the nature of the region second?

Q: (c) Should term external hazard frequencies be dropped or guidance written about how applicant must address external hazard frequencies? External hazard frequencies language is ambiguous.

82 l U.S. Nuclear Industry Council February 2021 Part 53

Subpart D - Siting Requirements- Specific Comments (continued) 53.520 Site This language seems appropriate and generally represents key information that should be sufficient to address requirements for siting.

Characteristics.

53.530 Q: Clarify Every site must have an exclusion area, low population zone, and provide a population center distance because Part 53 should apply to reactors with and without offsite emergency plans, including Population-microreactors, and the inclusion of separate boundaries beyond the Exclusion Area Boundary is arbitrary in related that it does not consider risk-informed, performance based criteria, but rather presumes some large release Considerations. without any basis.

Q: Explain population center distance paragraph, including if there is a statutory or technical basis behind the one and one third times? Many advanced reactors (e.g., microreactors) may be considered for higher population locations and this language seems arbitrarily to limit such an option.

Q: Similarly, please explain how away from densely populated centers comports with risk-informed, performance-based regulation. This language, which is similarly ambiguous in Part 100, seems to impose arbitrary limits on siting in a way that cancels out the benefit of increased safety margins in advanced designs.

Q: Is intent of 53.530 (c) and (d) to be prescriptive siting criteria, or performance-based criteria integrated with Emergency Planning considerations?

53.540 Siting The NRC continues to reference requirements its initial preliminary language (such as the facility safety program) without recognizing the comments received from stakeholders.

Interfaces.

83 l U.S. Nuclear Industry Council February 2021 Part 53

U.S. Nuclear Industry Council Contacts For questions or comments contact:

Cyril W. Draffin, Jr. Jerey S. Merri"eld Senior Fellow, Advanced Nuclear, Chairman, Advanced Nuclear Task Force U.S. Nuclear Industry Council U.S. Nuclear Industry Council Cyril.Draffin@usnic.org Partner, Pillsbury Winthrop Shaw Pittman LLP U.S. NRC Commissioner (1998-2007)

Je.Merri"eld@pillsburylaw.com 84 l U.S. Nuclear Industry Council February 2021 - Part 53

Subpart D Discussion 85

Final Discussion and Questions 86

Part 53 Rulemaking Schedule Milestone Schedule Major Rulemaking Activities/Milestones Schedule Public Outreach, ACRS Interactions and Present to April 2022 Generation of Proposed Rule Package (15 months)

Submit Draft Proposed Rule Package to May 2022 Commission Publish Proposed Rule and Draft Key Guidance October 2022 Public Comment Period - 60 days November and December 2022 Public Outreach and Generation of Final Rule January 2023 to February 2024 Package (14 months)

Submit Draft Final Rule Package to Commission March 2024 Office of Management and Budget and Office of July 2024 to September 2024 the Federal Register Processing Publish Final Rule and Key Guidance October 2024 87

Future Public Meetings

  • The NRC staff will continue to host monthly public meetings, estimated to be the first Thursday of every month, to discuss and receive feedback on various regulatory topics and preliminary proposed rule text.

o The next Part 53 public meeting will be scheduled for March 4, 2021.

o The preliminary proposed rule text will be posted on regulations.gov under docket ID NRC-2019-0062 before the public meeting.

88

Future Public Meetings

  • The NRC staff is tentatively scheduled to meet with the ACRS Future Plants Subcommittee on February 18, 2021.

o The staff will be presenting the Part 53 subparts C and D preliminary proposed rule text.

o The staff will continue to meet with the ACRS subcommittee every month.

89

Closing Remarks Rulemaking Contacts Robert.Beall@nrc.gov 301-415-3874 William.Reckley@nrc.gov 301-415-7490 Regulations.gov docket ID: NRC-2019-0062 Please provide feedback on this public meeting using this link:

https://www.nrc.gov/public-involve/public-meetings/contactus.html 90

Acronyms and Abbreviations ACRS Advisory Committee on Reactor F-C Frequency - Consequence Safeguards FEMA Federal Emergency ADAMS Agencywide Documents Access Management Agency and Management System FSAR Final Safety Analysis Report ALARA As low as reasonably achievable FSP Facility Safety Program ARCAP Advanced Reactor Content of IAEA International Atomic Energy Applications Project Agency ARDC Advanced Reactor Design INPO Institute of Nuclear Power Criteria Operations CDF Core Damage Frequency ISO International Organization for Standardization CFR Code of Federal Regulations LB Licensing basis DBE Design-basis event LBE Licensing basis event(s)

DID Defense in Depth LERF Large Early Release Frequency DSA Deterministic Safety Analysis LMP Licensing Modernization Project EAB Exclusion Area Boundary LPZ Low-Population Zone EPZ Emergency Planning Zone LWRs Light-water Reactors 91

Acronyms and Abbreviations NEI Nuclear Energy Institute SAR Safety Analysis Report NEIMA Nuclear Energy Innovation and SDOs Standards Development Modernization Act Organizations NMSS Office of Nuclear Material Safety SNM Special Nuclear Material and Safeguards NQA Nuclear Quality Assurance SRM Staff Requirements Memorandum NRC U.S. Nuclear Regulatory Commission SSCs Structures, systems, and components NRR Office of Nuclear Reactor Regulation SSEGM Safe Shutdown Earthquake Ground Motion OMB Office of Management and Budget TEDE Total effective dose equivalent PRA Probabilistic risk assessment TICAP Technology-Inclusive Content of Applications Program PSA Probabilistic Safety Assessment TS Technical Specifications QA Quality assurance QHO Quantitative health objective UCS Union of Concerned Scientists rem Roentgen-equivalent man USNIC U.S. Nuclear Industry Council 92

Background Slides 93

First Principles See: SECY-18-0096, Functional Containment Performance Criteria for Non-Light-Water-Reactors, and INL/EXT-20-58717, Technology-Inclusive Determination of Mechanistic Source Terms for Offsite Dose-Related Assessments for Advanced Nuclear Reactor Facilities 94

Integrated Approach Siting near densely populated Functional areas EP for SMRs Containment and ONTs Licensing Modernization Project Insurance and Liability Environmental Reviews Consequence Based Security 95

Part 53 Rulemaking The Part 53 Rulemaking Process*

  • The process depicted in this schematic is unique to the Part 53 rulemaking and varies in some ways compared to a similar A Typical Rulemaking Process schematic available on the NRCs public website.

96

Background

  • Nuclear Energy Innovation and Modernization Act (NEIMA; Public Law 115-439) signed into law in January 2019 requires the NRC to complete a rulemaking to establish a technology-inclusive, regulatory framework for optional use for commercial advanced nuclear reactors no later than December 2027 o (1) ADVANCED NUCLEAR REACTORThe term advanced nuclear reactor means a nuclear fission or fusion reactor, including a prototype plant with significant improvements compared to commercial nuclear reactors under construction as of the date of enactment of this Act, 97