VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 Re: 10 CFR 2.202 February 28, 2003 Secretary, Office of the Secretary of the Commission Serial No.:
03-142 U.S. Nuclear Regulatory Commission NL&OS/ETS ATTN: Rulemaking and Adjudications Staff Docket Nos.:
50-280 Washington, D.C. 20555-0001 50-281 License Nos.: DPR-32 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 ANSWER TO ORDER FOR INTERIM INSPECTION REQUIREMENTS FOR REACTOR PRESSURE VESSEL HEADS AT PRESSURIZED WATER REACTORS DATED FEBRUARY 11, 2003 On February 11, 2003, the Nuclear Regulatory Commission (NRC) issued an Order for Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors licensees.
The Order requires specific inspection of the reactor pressure vessel (RPV) head and associated penetration nozzles at pressurized water reactors (PWRs).
The Commission stated that the actions in the Order are interim measures, necessary to ensure that licensees implement and maintain appropriate measures to inspect and, as necessary, repair RPV heads and associated penetration nozzles.
The Order required that licensees immediately start implementation of the requirements of the Order and respond to specific actions within twenty (20) days of the date of the Order.
In accordance with Section V of the Order and 10 CFR 2.202, Virginia Electric and Power Company (Dominion) hereby submits its answer to the Order. Dominion consents to the Order as described in Section IV and does not request a hearing.
Currently, the Surry Units I and 2 replacement RPV heads are being designed to operate without thermal sleeves in the penetration nozzles.
If thermal sleeves are required to be installed, 100 percent inspection coverage of the penetration nozzle base material in the area of the weld and above the J-groove weld may not be obtainable as required by Section IV.C(3)(b) of the Order. If thermal sleeves are installed, the exact
limitation on coverage cannot be established until the first inspections required by the Order are performed. If 100 percent coverage of the area of interest cannot be obtained during inspection of the penetration nozzles, Dominion will seek relaxation from the inspection requirements in Section IV.C(3)(b) of the Order at that time.
If you have any questions, please contact Mr. Thomas Shaub at (804) 273-2763.
Very truly yours, David A. Christian Senior Vice President - Nuclear Operations and Chief Nuclear Officer Commitments made in this letter: None cc:
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Assistant General Counsel for Materials Litigation and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 U. S. Nuclear Regulatory Commission Regional Administrator - Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. C. Gratton NRC Senior Project Manager Surry Power Station Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station
Serial No.: 03-142 Docket Nos.: 50-280/281 Surry Response to RPV Head and Penetration Nozzles Inspection Order (EA-03-009)
COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO
) )
)
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by David A. Christian who is Senior Vice President Nuclear Operations and Chief Nuclear Officer of Virginia Electric and Power Company.
He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this,:_0iay of A,2003.
My Commission Expires:
Ae, 3 znq,
Notary Public 3/4(SEAL)
S-Z