Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML050840491 + (2 Pages Fort Calhoun - for Amd. 234. Elimination of Requirements for Hydrogen Monitors Using the Consolidated Line Item Improvement Process (Tac. MC4305))
- ML071150220 + (2 Part E-Mail Between R. Pedersen, Dpopm, and M. Shannon, Rii, Subject: Action: DPO-2006-002 Comments)
- ML033350250 + (2 Pm Agenda and Handout for Public Meeting Between NRC and Firstenergy Nuclear Power Operating Company to Discuss the Licensees Performance and Progress on the Return to Service Plan for Davis-Besse Nuclear Power Station)
- ML032890584 + (2 Pm Agenda and Handout for Public Meeting to Discuss Licensee Performance and Progress on the Return to Service Plan for the Davis-Besse Nuclear Power Station)
- ML033350208 + (2 Pm Agenda and Handout for Public Meeting Between NRC and Firstenergy Nuclear Power Operating Company to Discuss the Licensees Performance and Progress on the Return to Service Plan for the Davis-Besse Nuclear Power Plant)
- ML031260425 + (2 Pm Agenda and Handout for Public Meeting Between NRC Oversight Panel and Firstenergy Nuclear Operating Co)
- ML030300220 + (2 Pm Notice of Public Meeting Between NRC and Firstenergy Nuclear Operating Co. to Discuss Licensee Performance and Progress on Return to Service Plan for Davis-Besse Power Station)
- ML023600237 + (2 Pm Notice of Public Meeting Between NRC and Firstenergy Nuclear Opearting Company to Discuss Licensee Performance and Progress on the Return to Service Plan - Davis-Besse Nuclear Power Plant)
- ML030870881 + (2 Pm Notice of Significant Meeting Between NRC and Firstenergy Nuclear Operating Co to Discuss Licensee Performance and Progress on the Return to Service Plan for Davis-Besse Nuclear Power Station)
- ML032160580 + (2 Pm Transcript of Public Meeting Between NRCs 0350 Panel and Firstenergy Nuclear Operating Company Regarding Licensee Performance and Progress on the Return to Service Plan for the Davis-Besse Nuclear Power Station)
- ML032450571 + (2 Pm Transcript of Public Meeting Between NRC Oversight Panel and Firstenergy Nuclear Operating Company Davis-Besse Nuclear Power Station)
- ML033440294 + (2 Pm Transcript of Public Meeting Between NRC and Firstenergy Nuclear Operating Company Davis-Besse Nuclear Power Station)
- ML030360172 + (2 Pm Transcript of Public Meeting Between NRC and Firstenergy Nuclear Operating Co. Davis-Besse Return to Service Plan)
- ML23123A105 + (2 Proposed CoC 1014 Amendment 16 Appendix a)
- ML25078A250 + (2 Proposed CoC for CoC No. 1042, Amendment No. 4)
- ML24095A042 + (2 Proposed TS, Appendix a, Certificate of Compliance No. 1014, Renewed Amendment 18)
- 05000336/LER-2014-002, 2 Regarding DC Circuit Hot Shorts + (2 Regarding DC Circuit Hot Shorts)
- ML21326A184 + (2 Robert Tregoning - Ffr Overview for Ai Workshop)
- ML21201A366 + (2 Ronald Boring - NRC_AI_Boring_Talk_2021)
- ML090410208 + (2 SBO DG PM001.png; Develop PM for Sbo/App R DG Battery)
- ML090410218 + (2 SBO DG PM002.jpg; Develop PM for Sbo/App R DG Battery)
- ML090410228 + (2 SBO DG PM003.png; Develop Annual PM for Sbo/App R DG Swgr/Sfmrs Space Heaters)
- ML090410238 + (2 SBO DG PM004.jpg; Develop Annual PM for Sbo/App R DG Swgr/Xfmrs Space Heaters)
- ML20235U816 + (2 Semiannual Effluent Release Rept)
- ML20012B236 + (2 Semiannual Effluent Release Rept, for Jul-Dec 1989)
- ML20151P233 + (2 Single Loop Operation Analysis)
- ML20215J056 + (2 Sqrt, Informal Rept)
- ML051520141 + (2 T-34A Accumulator Level Indication)
- ML18333A341 + (2 W3-2018-11 Draft Outline Comments)
- 05000425/LER-2002-007-02, 2 for Vogtle Regarding Unit 2 Main Generator Tripped Resulting in an Automatic Reactor Trip + (2 for Vogtle Regarding Unit 2 Main Generator Tripped Resulting in an Automatic Reactor Trip)
- ML021090036 + (2 of 2, Nuclear Management Co., LLC, Kewaunee Nuclear Power Plant, 2001 Annual Financial Report for Alliant Energy Corp, Managements Discussion and Analysis of Financial Condition and Result of Operations)
- ML11117A256 + (2 of Offsite Dose Calculation Manual, 2011)
- ML021690381 + (2 of the Operational Quality Assurance Program Description (OQAPD))
- ML13134A125 + (2 to Appendix R, Fire Protection of Safe Shutdown Capability)
- ML022120292 + (2 to Approved Amendment to Susquehanna Steam Electric Station, Unit 2 Technical Specifications Bases Manual)
- ML19339B141 + (2 to Certificate of Compliance 6698,for Model NFS-4)
- ML030980058 + (2 to Document TEP-ADM-1300.05, Emergency Equipment Readiness)
- ML032950630 + (2 to EAP-1, Revision 24 to EAP-14.1, Revision 22 to EAP-14.2, and Revision 15 to EAP-14.5)
- ML040580481 + (2 to EIP-ZZ-A0020, Maintaining Emergency Preparedness)
- ML031130537 + (2 to EM-204B, Off-site Dose Assessment During Radiological Emergencies (User Instructions for Raddose-IV))
- ML16132A506 + (2 to EN-RW-104, Scaling Factors)
- ML040140753 + (2 to EP-225, Radiological Medical Emergencies, and Revision 2 to EP-290004, Ambulance/Paramedic Support Request Form)
- ML040370629 + (2 to EP-304-01, Alternate Emergency Operations Facility)
- ML17037D200 + (2 to EP-AA-1007, Radiological Emergency Plan Annex)
- ML17041A292 + (2 to EP-AA-1007, Radiological Emergency Plan Annex and 10 CFR 50.54(q)(5) Procedure Change Summary Analysis)
- ML031920366 + (2 to EP-PS-102, Technical Support Coordinator: Emergency Plan-Position Specific Procedure)
- ML032730583 + (2 to EP-PS-118, Radiation Protection Clerk: Emergency Plan-Position Specific Procedure)
- ML040550540 + (2 to EPI-A6, Technical Support Center Activation and Revision 10 to EPI-A8, Emergency Operations Facility Activation)
- GNRO-2004/00020, 2 to EPIP 10-S-01-30, Technical Support Center (TSC) Operations + (2 to EPIP 10-S-01-30, Technical Support Center (TSC) Operations)
- NLS2003068, 2 to EPIP 5.7.17, Dose Assessment, and Revision 17 to EPIP 5.7.20, Protective Action Recommendations + (2 to EPIP 5.7.17, Dose Assessment, and Revision 17 to EPIP 5.7.20, Protective Action Recommendations)
- ML040340464 + (2 to EPIP Index Pages 1 and 2, and Revision 3 to RP/0/A/5700/026, Operations/Engineering Required Actions in the Technical Support Center (TSC))