Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18038A710 +
- ML17290B259 +
- ML18096A929 +
- ML18096A928 +
- ML18058B051 +
- ML18058B047 +
- ML18058B031 +
- ML20118A394 +
- ML20114D645 +
- ML20114D212 +
- ML20114C461 +
- ML20114C130 +
- ML20114B942 +
- ML20114B800 +
- ML20141M613 +
- ML20141M584 +
- ML20141M585 +
- ML20141M540 +
- ML20141M530 +
- ML20141M527 +
- ML20141M507 +
- ML20141M498 +
- ML20141M461 +
- ML20127E200 +
- ML20127E169 +
- ML20127D654 +
- ML20127C706 +
- IR 05000344/1992019 +
- ML20127C458 +
- ML20127C454 +
- ML20127C172 +
- ML20114B784 +
- PNO-III-92-043, on 920827,while Unit 2 Reducing Power to 800 Mw,Turbine Tripped Due to Thrust Bearing Wear Detector Signal.Several Equipment Problems Occurred Following Scram. Operators Successfully Established Steam Flow to Condenser +
- TAC:M83690 +
- ML20203G272 +
- ML20203G255 +
- PNO-II-92-055A, on 920824,declaration Was Issued Declaring South Florida Disaster Area as Result of effe25X,per Governor L Chiles Request +
- TAC:M81511 +
- ST-HL-AE-4198, Responds to Nonconformance Noted in Insp Rept 99900404/92-01 of Westinghouse MOV Qualification Program Audit.Test Plan Revs Will Generate Data to Directly Verify Output Capability of MOVs at Design Basis Conditions During Refueling Out +
- 0CAN089212, Informs That on 920801,NS Carns,Vice President,Operations ANO Resigned Position W/Util & JW Yelverton Elected to Succeed Ns Carns as Vice President,Operations Ano.Future Correspondence Re ANO Should Be Addressed to JW Yelverton +
- ELV-03895, Requests That Submittal Date for IPEEE Be Extended Until 950331,per NRC 920622 Request for Util to Reassess Proposed Schedule for Completion of IPEEE Evaluations +
- ELV-03956, Requests Extension of Submittal Date for Results of IPE, Per Generic Ltr 88-20 from Sept 1992 Until 921231.Actual Effort to Provided Analyses Consistent W/Gl & NUREG-1335 Resulted in Delays in Completion of Intermediate Milestones +
- SNRC-1987, Forwards Semiannual Radioactive Effluent Release Rept, First & Second Quarters 1992. No Solid Waste Shipped Offsite to Burial Site During Reporting Period.Solid Waste Shipped to Vol Reduction Facilities +
- 05000327/LER-1992-015, :on 920728,discovered That Configuration of Air Supplies & Solenoids for Containment Vacuum Relief Isolation Valves Could Result in Loss of Automatic Closure. Night Order Issued to Remove Fuses +
- 05000263/LER-1992-009, :on 920728,HPCI Declared Inoperable Due to Concerns That Sys Would Not Perform as Described in FSAR During Atws.Caused by Inadequate Consendate Storage Tank Inventory.Updated FSAR Will Be Revised +
- 05000461/LER-1992-009, :on 920729,determined That Testing of Diesel Fuel Oil for EDGs Not Performed Per TS 4.8.1.1.2.d.3.Caused by Personnel Error.Ts Change Request Re Alternate Test Method Submitted to NRC on 920817 +
- ML20114D181 +
- SNRC-1988, Forwards Rev 0 to 92-564, Safety Evaluation, Describing Pending Change to Decommissioning Plan Re Dry Cutting Station Location & Design +
- ML20104A303 +
- ML20114D493 +