Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17332A699 +
- ML18039A537 +
- ML18153B265 +
- ML18153B263 +
- ML18153B262 +
- ML20087H669 +
- ML20087G414 +
- ML20087G238 +
- ML20084T870 +
- ML20082U420 +
- ML20082C533 +
- ML20082B212 +
- ML20082B203 +
- ML20081L688 +
- ML20081L473 +
- ML20081L372 +
- ML20081K741 +
- ML20081K523 +
- ML20081K458 +
- ML20081K424 +
- ML20081K299 +
- ML20081K170 +
- ML20081K165 +
- ML20081K125 +
- ML20081J857 +
- ML20081J829 +
- ML20081J815 +
- ML20081J747 +
- ML20081J090 +
- ML20112C755 +
- ML20134C100 +
- ML20149K914 +
- NG-95-0927, Submits Response to Followup to Request for Addl Info Re GL 92-08, Therm-Lag 330-1 Fire Barriers +
- 3F0395-21, Advises of Organizational Change Affecting Responsibility for in-processing/access Control to Plant,Unit 3 +
- RBG-41258, Informs That Util Cannot Complete Physical Security Plan Commitmment Re UPS to Security Sys Until Refueling Outage 6, as Discussed in Attachment,Per Response to Violation Noted in Insp Rept 50-458/93-05.Attachment Withheld +
- 3F0395-10, Responds to NRC Re Violations Noted in Insp Rept 50-302/95-02.Corrective Actions:Performance of Surveillance to Ensure That All Channels in Tolerance & Systems Engineering Supervisor Counselled Responsible Engineer +
- RC-95-0076, Forwards Response to Follow Up Request for Addl Info Re GL 92-08 +
- BSEP-95-0142, Provides Response to NRC 941223 Request for Addl Info Re GL 92-08 Thermo-Lag 330-1 Fire Barriers, for Plant Units 1 & 2 +
- 1CAN039501, Forwards Rev 0 to 94R-1009-03, ANO 1 Cycle 13 Colr +
- RC-95-0075, Forwards VC Summer Training Simulator Quadrennial Certification Rept 1992-1995 +
- 05000336/LER-1995-008, :on 950221,determined That Vital DC Switchgear Rooms Vital Chillers Could Fail During Periods of Low SW Temp.Caused by Inadequate Design.Isolated Flow Control Valves & Using Bypass Valves to Control Flow +
- 05000327/LER-1995-002-01, :on 950223,Unit 1 Experienced RCS Leak at Compression Fitting Rv Level Indication Sys Line in Incore Instrument Room.Caused by Rv Level Indication Sys Instrument Line Failure.Work Requests Initiated +
- 05000352/LER-1995-002, :on 950221,reactor Protection Systems Actuated as Result of Trips of Main Turbines.Caused by Breaker Failure & Voltage Spike.Ground Fault Detection Relay Settings Being Evaluated +
- 05000374/LER-1995-003-04, :on 950221,an Unexpected CRD Scram Discharge Vol High Level Scram Signal Received.Caused by High Water Level Due to Mgt Deficiency.Reactor Scram Signal Reset & High Level Scram Bypassed +
- 05000369/LER-1995-002-01, :on 950221,Train a of Control Room Ventilation Sys Judged Technically Past Inoperable Occurred.Caused by Inadequate Review of Cumulative Effects of Field Changes. Throttling Procedure Put in Place +
- ML20081J727 +
- ML20081K883 +
- ML20081K865 +
- HNP-95-036, Forwards Response to RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers +
- IR 05000244/1995001 +