Forwards Revised Page 4 to TS Change Request 90-03,extending Surveillance Test Intervals & Allowable out-of-svc Times for Testing &/Or Repair of Instrumentation That Actuate RPS, Primary Containment Isolation & Core & Containment Cooling
ML20082B203
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/23/1995
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082B204 List:
References
NUDOCS 9504050059
Download: ML20082B203 (2)


Text

=.

stillon cupport Depcrtment '

L 10CFR50.90 A

cm -

=ss -

PECO ENERGY El A*lagr/s,,

965 Chesterbrook Boulevard 1

Wayne, PA 19087 5691 March 23,1995 Docket Nos. 50-277 ~

' 50-278 License Nos. DPR-44

' DPR-56 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Sut4ect:

Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specifications Change Request No. 9043

Reference:

Letter from G. A. Hunger, Jr. (PECO Energy) to U. S. Uucier.; R0gulatory i

Commission dated September 26,1994

Dear Sir:

In the above referenced letter, PECG Energy Company submitted, in accordance with 10CFR50.90, Technical Specifications Change Request (TSCR) No. 9043 which requested-changes to Appendix A of the Peach Bottom Faculty Operating Ucenses..TSCR 9003 proposed changes to extend surveNiance test intervals and allowable out-of-service times for the testing and/or repair of instrumentation that actuate the Reactor Protection System, Primary Containment isolation, Core and Containment Cooling systems, Control Rod Blocks, Radiation Monitoring systems, and Altemate Rod insertion / Recirculation Pump Trip.

The purpose of this letter is to clarify a discussion on page 4 of Attachment 1 of the referenced letter. A new page 4 has been provided with revision bar markers in the right hand margin to indicate the location of the clarification. We have concluded that the clarification does not affect the conclusions previously submitted regarding a safety assessment, information supporting a finding of No Significant Hazards Consideration or information supporting an Environmental Assessment. No revisions to the proposed Technical Specifications pages contained in the referenced letter are required.

1 if you have any questions, please do not hesitate to contact us.

Sincerely,

,1 G. A. Hunger, J.

j Director - Licensing Affidavit, Enclosure cc:

T. T. Martin, Administrator, Region 1. USNRC W. L Schmidt, USNRC Senior Resident inspector, PBAPS R. R. Janati, Cori,mcn 7 of Pennsylvania 6

DDhk hhhh77

'I J

L.

l PDR

' COMMONWEALTH OF PENNSYLVANIA as.

COUNTY OF CHESTER W. H. Smkh,111, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the clarification to Technical Specifications Changa Request (Number 9043) for Peach Bottom FacIlty Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

l A

Vice President i

I Subscribed and swom to before me this M y

of Y 1995.

A X] J l

//

)

Notary Public l

NolanalSeal Erica A.S.nari, Notary Psic

[995 MyC c E ras J l

l I

l

- -