ANO 1 Cycle 13 Colr
ML20081J829
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/23/1995
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20081J827 List:
References
94R-1009-03, 94R-1009-3, NUDOCS 9503280204
Download: ML20081J829 (20)


Text

.

ENTERGY OPERATIONS 9

ARKANSAS NUCLEAR ONE - UNIT ONE CYCLE 13 CORE OPERATING LIMITS REPORT l

1.0 CORE OPERATING LIMITS This Core Operating Limits Repon for ANO-1 Cycle 13 has been prepared in accordance with the requirements of Technical Specification 6.12.3. The core operating limits have been developed using the methodology provided in the references.

The following cycle - specific core operating limits are included in this report:

1)

Regulating control rod position setpoints, 2)

Reactor power imbalance setpoints, 3)

LOCA limited maximum allowable linear heat rate limits, 4)

Axial power imbalance protective limits, 5)

Protection system maximum allowable setpoints for axial power imbalance, 6)

KW/ft limit for axial power imbalance protective limits, 7)

Minimum shutdown margin, 8)

Axial power shaping rod insertion limits, 9)

Quadrant power tilt limits.

i 94R-1009 03 l

Raision 0 COLR m1d 0 95o328o204 95o323 ADOCK05oog3 PDR P

i

3 I

2.0 REFERENCES

1. Babcock & Wilcox, Topical Report BAW-10179P-A, " Safety Criteria and Methodology for Acceptable Cycle Reload Analysis," Lynchburg, Virginia, August 1993.

i i

i I

b 94R-1009 03 Revmon 0 COLR page 2 of 20

Table Of Contents Ean Fig.1-A Rod Position h=ai== for Four-Pump Operation From 0 to 250 210 EFPD

- ANO-1 Cycle 13....

..............4 Fig.1-B Rod Position haaina for Four-Pump Operation From 250 i 10 EFPD to EOC

- ANO-1 Cycle 13...-........................

-5 Fig. 2-A Rod Position Setpoints for ThrC,, Operation From 0 to 250 i 10 EFPD

- ANO 1 Cycle 13....

.. 6 Fig. 2-B Rod Position Setpoints for Three-Pump Operation From 250 i 10 EFPD to EOC

- ANO 1 Cycle 13....

.7 Fig. 3 A Rod Position Setpoints for Two-Pump Operation From 0 to 250 i 10 EFPD

- ANO 1 Cycle 13..

.... 8 Fig. 3-B Rod Position Setpoints for Two-Pump Operation From 250 i 10 EFPD to EOC

- ANO-1 Cycle 13

.9 Fig. 4 Operational Power Imbalance Setpoints for Four-Pump Operation From 0 EFPD to EOC - ANO-1 Cycle 13.

.10 Fig. 5 Operational Power Imha1=nm Setpoints for Three-Pump Operation From 0 EFPD to EOC - ANO 1 Cycle 13.........

1I Fig. 6 Operational Power Imbalance Setpoints for Two-Pump Operation From 0 EFPD to EOC - ANO-1 Cycle 13

........... 12 Fig. 7-A Mk-B8 LOCA Linear Heat Rate Limits...

.13 Fig.7-B Mk-B8ZL and Mk-B9ZL LOCA Linear Heat Rate Limits...............

.. 14 Fig. 8 Axial Power !=haha~ Protective Limits..

15 Fig. 9 Protection System Maximum Allowable Setpomts for Axial Power Inh 1=nce....16 KW/FT Limit for Axial Power Imhalance Protective Limits...............

17 Minimum Shutdown Margin........

18 Axial Powv Shaping Rod lasertion Limits.-

...................19 ANO-1 Cycle 13 Tilt Setpoints (Quadrant Power Tilt Limits)....

...... 20 94R-1009 03 Revision 0 COLR page 3 of 20

Figure is referred to by Technical Specification 3.5.2.5 Figure 1-A Rod Position Setpoints for Four-Pump Operation From 0 to 250 i10 EFPD - ANO-1 Cycle 13 110 (159.5,102)

(268.5,102)

~~

SHUTDOWN MARGIN 90 LIMIT

\\

(256.5,90) 80 OPERATlON IN THIS (246.5,78)

REGION IS NOT

~>

OPERATION ALLOWED 70 7

RESTRICTED 60 p

(92.5,58)

(221.5,58) og 50 ti3 40 S

~~

PER M ISSIBLE OPERATING 20 REGION (47.5,18) 10 (0,1.1) o l

l l

l l

l l

l l

l l

l l

l 0

20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 i

Rod Index, % withdrawn 0

20 40 60 80 100 l

l I

I I

I GROUP 7 0

20 40 60 80 100 I

I I

I I

I GROUP 6 0

20 40 60 80 100 I

I I

I I

I GROUP 5 94R-1009 03 Revision 0 COLR page 4 of 20

(

Figure is referred to by Technical Specification 3.5.2.5 Figure 1-B Rod Position Setpoints for Four-Pump Operation i

From 250i10 EFPD to EOC-ANO-1 Cycle 13 110 (221.5,102) (2s8.5,102) 100 (200, 102) 90

~-

OPERATION IN THIS SHUTDOWN ERATION l

REGION IS NOT MARGIN RESTRICTE (248.5,78) go _ _

3:

ALLOWED UMIT 2

70 N

60 (177.5,58)

(221.5, 58) o 50 g

40 0

PERMISSIBLE 30 OPERATING 20 REGION (100.5,18) 10 0

l

'l l

l l

l l

l l

l l

l l

l 0

20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 Rod Index, % withdrawn 0

20 40 60 80 100 l

I I

l' I

I GROUP 7 0

20 40 60 80 100 I

I I

I I

l GROUP 6 0

20 40 60 80 100 l

I I

I I

I GROUP 5 i

94R-1009-03 Revision 0 COLR page 5 of 20

Figure is referred to by Technical Specification 3.5.2.5 Figure 2-A Rod Position Setpoints for Three-Pump Operation From 0 to 250 i10 EFPD - ANO-1 Cycle 13 i

110 100 90 SHUTDOWN 80

(

)

(269,77)

MARGIN

~3 (300, 77)

LEE "4

70 (256.5,67)

OPERATION IN THIS y

60 REGION IS NOT (246.5,58)

ALLOWED OPERATION M

~~

RESTRICTED (92.5, 43.5)

(221.5,43)

E 30 PERMISSIBLE OPERATING 20 REGION (47.5,13.5) 3o _ _

l' l

l l

l l

l l

l l

l l

l 0

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 3 00 Rod Index, % withdrawn 0

20 40 60 80 100 1

1 I

I I

I GROUP 7 O

20 40 60 80 100 l

l 1

I I

I GROUP 6 0

20 40 60 80 100 I

I I

I I

I GROUP 5 94R-1009-03 Revision 0 COLR page 6 ar20

Figure is referred to by Technical Specification 3.5.2.5 1

Figure 2-B Rod Position Setpoints for Three-Pump Operation From 250 i 10 EFPD to EOC - ANO-1 Cycle 13 110 100 90 --

80 (222.2, 77)

(269, T7) j (300, 77) y 70 (256.5, 67) g SHUTDOWN y

60 OPERATION IN THIS MARGIN PERATION (246.5, 56)

REGION IS NOT LIMIT RESTRICTE go 50 ALLOWED b*

(177.5, 43.5)

(221.5, 43) l is 40 cT.

30 PERMISSIBLE i

OPERATING 20 REGION i

100.5,13.5) 10 (0,1.0) 0 l

l l

l l

l l

l l

l l

l l

l 0

20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 rod Index, % withdrawn 0

20 40 60 80 100 l

I i

l I

I GROUP 7 0

20 40 60 80 100 l

l I

I I

I GROUP 6 0

20 40 60 80 100 1

l i

l l

l GROUP 5 94R-1009 03 Revison 0 COLA page 7 of 20

i I

Figure is referred to by Technical Specification 3.5.2.5 t

Figure 3-A Rod Position Setpoints for Two-Pump Operation From 0 to 250 i10 EFPD - ANO-1 Cycle 13 i

110 100 90 j

80 1

W2 70 oo CW 60 N

OPERATION IN THIS MARGIN o

REGION IS NOT LIMIT (162.6,82)

(26s.8,$2) so g

ALLOWED (300, 2) j g

(256.5,44) l y

40 OPERATION I

(244.5,38) o RESTRICTED 30 (s2.5,2s)

(221.s,2s) l l

20 PERMISSIBLE OPERATING 30

~ ~,o.s) 97.s, s)

(o REGION

]

O l

l l

l l

l l

l l

l l

l l

l f

O 20 40 60 80 100 120 140 160 180 200 220- 240 260 280 300 Rod Index, % withdrawn i

l 0

20 40 60 80 100 l

l 1

I l

l l

i GROUP 7-0 20 40 60 80 100 I

I I

I l

l l

GROUP 6 0

20 40 60 80 100 l

I I

I I

I GROUP 5 94R 1009 03 Revisaan 0 i

COLR page 8 a(20 l

Figure is referred to by Technical Specification 3.5.2.5 Figure 3-B Rod Position Setpoints for Two-Pump Operation From 250 i 10 EFPD to EOC - ANO-1 Cycle 13 9

110 100 90 80 h2 70

  • A 60 gg SHUTDOWN (223.5,52)

(269.8,52)

M ARGIN 50 bo OPER AT10N IN THis LIMIT g

(300, 52) d REGION IS NOT O P E R ATIO N (256.5,44) 40 i$

ALLOWED R E 5 WCTE D (246.5,38) 30 (177.5,29)

O P E R M IS SIB L E OP E R ATIN G

~

(100.5,9)

(0, 0.7 )

o l

l l

l l

l l

l l

l l

l l

l 0

20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 rod Index, % withdrawn 1

0 20 40 60 80 100 1

I I

I I

I GROUP 7 0

20 40 60 80 100 I

I I

I I

l GROUP 6 0

20 40 60 80 100 l

1 l

l l

l GROUP 5 94R-1009-03 Revision 0 COLR page 9 of 20

j Figure is referred to by Technical Specification 3.5.2.6 Figure 4 Operational Power Imbalance Setpoints for Four-Pump i

Operation From 0 EFPD to EOC - ANO-1 Cycle 13 110 - -

(-19.8,102).

. (16.8,102) 100 - -

(-27.1, 92)

(18.1, 92) g,

(-30.6, 80) 80 -

(204 80) 70 -

2 oo

(-33.9, so)O e 60 -

p(33.a,so) m N

RESTRICE o 50 -

REGION REGION g

g40-S O

PERMISSIBLE A 30 -

PERMISSIBLE OPERATING OPERADNG REGION REGION 20 -.

10 - -

l l

0l l

l c.

l l

l0 l

l

-50

-40

-30

-20

-10 0

10 20 30 40 50 Axial PowerImbalance

(

94R-1009-03 Revision 0 COLR page 10 of 20

Figure is referred to by Technical Specification 3.5.2.6 Figure 5 Operational Power Imbalance Setpoints for Three-Pump Operation From 0 EFPD to EOC - ANO-1 Cycle 13 110 - -

100 - -

l go..

(-su,77),

80 - -

(U.2, n)

( a 4 e s)

~m-(27.7, 89) 5 (419, so) q 260-

> (318, so) oe C

$50-(*18)0 o (x1,e) g40-RESm m D RES M E PEMASSBUE 30 -

PEm4SSEE OPERAB W 6

REGON mym N

REGION 20 - -

10 - -

l l

0l l

l c

l l

lo l

l

-50 40

-30

-20

-10 0

10 20 30 40 50 Axitd Pbv4rIrifxdarre 94R-1009-03 Revision 0 COLR page 11 of 20

Figure is referred to by Technical Specification 3.5.2.6 Figure 6 Operational Power Imbalance Setpoints for Two-Pump Operation From 0 EFPD to EOC - ANO-1 Cycle 13 110 - -

00 - -

1 90 - -

g C

to[m--

o 870- -

i i!: 60 - -

o

(-mg s2) a

,(n.g s2)

~~

(448) t p(Mo,#)

(-x2,40) O 40 -

ogxg,m)

(M3,30) O PEMSSEE 30 --

PMBSSEE O (us,30)

OMAM ORRADE REGON

[

RESD41CTE) 20 - -

M M

i 10 -

i l

l Cl l

o

-50 4)

-30

-20

-10 0

10 20 30 40 50 AxialPbwerIninlance l

94R-1009-03 Revision 0 COLR page 12 of 20 r

1 l

\\

i Figure is referred to by i

Technical Specification 3.5.2 Bases i

Figure 7-A Mk-B8 LOCA Linear Heat Rate Limits 19

- - - - - -, - - - - -.- - - - - - - -(32000,18).

is -

84 17 4a.

E 3

64.

M~ 16 10-ft'

=

=

28 E

~3 g

2-ft.

/. 2200 psia.

eig 15 -.

f.

r------.---

r-------

oc g

g g

.u if -~........*.......*....... L.......'......

  • .......L.......

e c

J 13 -E------.---- --------- --- --.--------- ---- ----- -

12 -:.------.---- -.-

r----

r-------

g l

l l

l l

(60000,11.6) 11 naeaeaeaeiseaeaaaaaieaeaaaaaalsaaeaaaamiseaeaaeaaineaeaeaealseeaeaaee I

I I

I I

3 0

10000 20000 30000 40000 50000 60000 70000 Bumup (MWmtu) 94R-1009 03 Revision 0 COLR page 13 of 20 i

l j

I i

l l

Figure is referred to by i

Technical Specification 3.5.2 Bases Figure 7-B Mk-B8ZL and Mk-B9ZL LOCA Linear Heat Rate Limits l

l l

19

- - - - - -.- - - - - - -,(39000,18).

18 -

i 4ft E6.,8,104tl l

l l

l 17


= -

=

=

2.ft 2 ft '

l l

s.wn

\\

E E

1 3

.......... 6.ft. '....... 's...... a'......'........ '.......

x 3g - -

2200 # a

.E._

a Sig 15 -: --s.

--r--

r-------

a:

g g

z u 34

........................s.................

.....s.......

e si

.c 8

?------.------------

13 -

i (57000,12.6) 12 -------.-----.------r-----.-----.------r-------

11

  • naeaaeaasinaeaaaaeafaaaeaaaasinaaeaaeeainaeaeaeasinaaaaaaaelaaaaaeaea I

I I

I i

i 0

10000 20000 30000 40000 50000 60000 70000 Bumup(mwd /mtu) 94R.1009-03 Revision 0 COLR page 14 of 20

. - ~

Figure is referred to by Technical Specification 2.1.2 Figure 8 Axial Power Imbalance Protective Limits Thermal Power Level, %

120 - -

(-41.6,112)

(46.5,112)=

m lA M N p(61.9,107.24) 4 PUMP l

  • OPERATION 100 -

1 ( 41.6, 90.74)

(46.5, 90.74) ;

(-60.9, 85.34)(

l E

p (61.9,86.98) 384 PUMP OPERATION 80 -

l

=

(-60.9, 64.08)(

=(-41.6, 64.08)

(46.5,64.08)l m

l ACCEPTABLE 60 -

p (61.9,59.32) l 2,3&4 PUMP l

OPERATION l

(-60.9, 37.42)(

f

~~

1 i

20 - -

=

i

, (4.9, oh l

(61.9, 0),

i ir i

i i

i

-80

-60

-40

-20 0

20 40 60 80 Axial Powerimbalance, %

i l

i l

94R-1009 03 Revision 0 COLR page 15 of 20

)

Figure is referred to by Technical Specification 2.3.1 Figure 9 Protection System Maximum Allowable Setpoints for Axial Power Imbalance i

Thermal Power Level, 120 I

, -31.s, 107)

(as,107),

(

ACCEPTABLE.

l 100 -

4 PUMP

) (so.3,ts.8) l OPERADON.

1(41.s,79s[

g3,,7,,,3i

(-s0.3, 74.9) q ACCEPT M '

p (s0.3, s9.7) sa.4 PUMP OPERADON l

m-

(-31.s, s2.s)

(as, s2.s);

l

(-s0.s,47.s) q l

ACCEPTABLE.

2, as.4 PUMP ;

) (s0.3,42.4) no.

\\

OPERATION i

0 0

(-s0.3,20.s) q 20 -

l l

(-s07,0),,

,(s0.3,0) j i

i i

i

-80 40 40

-20 0

20 40 60 80 Axial Powerimbalance, %

94R-1009-03 Revision 0 COLR page 16 of 20

LIMIT IS REFERRED TO BY TECHNICAL SPECIFICATION 2.1 BASES KW/FT LIMIT FOR AXIAL POWER IMBALANCE PROTECTIVE LIMITS The combination of radial and axial peak that prevents central fuel melting at the hot spot is:

KW/FT Limit = 20.5 kW/ft 94R-1009 03 Revision 0 COLR page 17 of 20

LIMIT IS REFERRED TO BY TECHNICAL SPECIFICATION 3.1.8.3 AND 3.5.2.1 AND 3.5.2.2.2 AND 3.5.2.2.3 I

MINIMUM SHUTDOWN MARGIN The minimum available shutdewn margin shall be maintained 21 %Ak/k.

i l

E D

f 94R-1009-03 Reymon 0 COLR page 18 of 20

\\

i LIMITS ARE REFERRED TO BY TECHNICAL SPECIFICATION 3.5.2.5.4 AXIAL POWER SHAPING ROD INSERTION LIMITS Up to 480 +10/-10 EFPD, the APSRs may be positioned as necessary for transient imbalance control, however, the APSRs shall be fully withdrawn by 480 +10/-10 EFPD. After 480 +10/-10 EFPD, the APSRs shall not be reinserted.

i 94R-1009-03 Revision 0 COLR I

page 19 of 20

\\

N*

VALUES ARE REFERRED TO BY TECHNICAL SPECIFICATION 3.5.2.4

{

ANO-1 CYCLE 13 TILT SETPOINTS i

i FullIncore System WINDOW (EFPD)

Tilt Setpoint Maximum Setpoint^

(%)

(%)

0 to 250 +10/-10 4.40 25

~

250 +10/-10 To EOC 4.31 25 l

Excore System Minimum Incore System (NIs)

(Backup Recorders)

WINDOW (EFPD)

Tilt Setpoint Tilt Setpoint

(%)

(%)

0 EFPD To EOC 1.96 1.90

^ Independent of tilt measurement system.

f 94R-1009-03 Revision 0 COLR page 20 of 20