ENTERGY OPERATIONS 9

ARKANSAS NUCLEAR ONE - UNIT ONE CYCLE 13 .

CORE OPERATING LIMITS REPORT l 1.0 CORE OPERATING LIMITS This Core Operating Limits Repon for ANO-1 Cycle 13 has been  !

prepared in accordance with the requirements of Technical Specification 6.12.3. The core operating limits have been developed using the methodology provided in the references.  !

The following cycle - specific core operating limits are included in this  !

report:

1) Regulating control rod position setpoints,
2) Reactor power imbalance setpoints,
3) LOCA limited maximum allowable linear heat rate limits,  !
4) Axial power imbalance protective limits,  ;
5) Protection system maximum allowable setpoints for axial power imbalance,
6) KW/ft limit for axial power imbalance protective limits,
7) Minimum shutdown margin,
8) Axial power shaping rod insertion limits,
9) Quadrant power tilt limits.

i 94R-1009 03 l Raision 0 COLR m1d 0 95o328o204 95o323 ,

PDR ADOCK05oog3 P i

3 I

2.0 REFERENCES

1. Babcock & Wilcox, Topical Report BAW-10179P-A, " Safety Criteria -

and Methodology for Acceptable Cycle Reload Analysis," Lynchburg, Virginia, August 1993.

l i

i i

I b

94R-1009 03 Revmon 0 COLR page 2 of 20

Table Of Contents Ean Fig.1-A Rod Position h=ai== for Four-Pump Operation From 0 to 250 210 EFPD

- ANO-1 Cycle 13 .... .. . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..............4 Fig.1-B Rod Position haaina for Four-Pump Operation From 250 i 10 EFPD to EOC

- ANO-1 Cycle 13 . ..-.... . .. . .... ....... .. ... . ... -

-5 Fig. 2-A Rod Position Setpoints for ThrC ,, Operation From 0 to 250 i 10 EFPD

- ANO 1 Cycle 13. . .. . ... . . . . . . . . . . . . . . .. 6 Fig. 2-B Rod Position Setpoints for Three-Pump Operation From 250 i 10 EFPD to EOC

- ANO 1 Cycle 13.. . . . . _ . . . . . . .7 Fig. 3 A Rod Position Setpoints for Two-Pump Operation From 0 to 250 i 10 EFPD

- ANO 1 Cycle 13.. . . . . . ... . 8 Fig. 3-B Rod Position Setpoints for Two-Pump Operation From 250 i 10 EFPD to EOC

- ANO-1 Cycle 13 . .. .9 Fig. 4 Operational Power Imbalance Setpoints for Four-Pump Operation From 0 EFPD to EOC - ANO-1 Cycle 13. ... .10 Fig. 5 Operational Power Imha1=nm Setpoints for Three-Pump Operation From 0 EFPD to EOC - ANO 1 Cycle 13. ... . .. .. 1I Fig. 6 Operational Power Imbalance Setpoints for Two-Pump Operation From 0 EFPD to EOC - ANO-1 Cycle 13 - _ _ __ .. . .. .. . . .. 12 Fig. 7-A Mk-B8 LOCA Linear Heat Rate Limits... . . . . . . . . . . . . . . . . . .13 Fig.7-B Mk-B8ZL and Mk-B9ZL LOCA Linear Heat Rate Limits...... . .... .. .. .. 14 Fig. 8 Axial Power !=haha~ Protective Limits.. ... . . . 15 Fig. 9 Protection System Maximum Allowable Setpomts for Axial Power Inh 1=nce. . . .16 KW/FT Limit for Axial Power Imhalance Protective Limits.. .. . .... .. .. .. ,... 17 Minimum Shutdown Margin.. .. . . .. . . . . . .. . . . . 18 Axial Powv Shaping Rod lasertion Limits.- . . . . . . . . . . . . . ...................19 ANO-1 Cycle 13 Tilt Setpoints (Quadrant Power Tilt Limits) .... ... .... ... .... . . 20 94R-1009 03 Revision 0 COLR page 3 of 20

1 Figure is referred to by Technical Specification 3.5.2.5 Figure 1-A Rod Position Setpoints for Four-Pump Operation From 0 to 250 i10 EFPD - ANO-1 Cycle 13 110 (159.5,102) (268.5,102)

' ~~

SHUTDOWN * ' '

MARGIN 90 --

LIMIT \ (256.5,90) 80 --

OPERATlON IN THIS (246.5,78)

~

> REGION IS NOT OPERATION 70 -- ALLOWED RESTRICTED 7

p 60 --

(92.5,58)

% (221.5,58) o g 50 --

ti 3 40 --

S

' ~~

PER M ISSIBLE OPERATING 20 --

REGION (47.5,18) 10 --

(0,1.1) o l l l l l l l l l l l l l l 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 i Rod Index, % withdrawn 0 20 40 60 80 100 l l I I I I GROUP 7 0 20 40 60 80 100 I I I I I I GROUP 6 0 20 40 60 80 100 I I I I I I GROUP 5 94R-1009 03 Revision 0 COLR page 4 of 20

(

Figure is referred to by  ;

Technical Specification 3.5.2.5 Figure 1-B Rod Position Setpoints for Four-Pump Operation i From 250i10 EFPD to EOC- ANO-1 Cycle 13 110 (221.5,102) (2s8.5,102) 100 --

(200, 102) 90 ~-

OPERATION IN THIS SHUTDOWN ERATION l

REGION IS NOT MARGIN

, go _ _

RESTRICTE (248.5,78)

ALLOWED UMIT 3:

2 70 --

N 60 --

(177.5,58) (221.5, 58) o g 50 --

40 --

0 30 --

PERMISSIBLE OPERATING 20 --

REGION (100.5,18) 10 0 l 'l l l l l l l l l l l l l 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 Rod Index, % withdrawn I l

0 20 40 60 80 100 l I I l' I I GROUP 7 0 20 40 60 80 100

! I I I I I l GROUP 6 0 20 40 60 80 100 l I I I I I GROUP 5 i

94R-1009-03 Revision 0 COLR page 5 of 20 ,

l

Figure is referred to by Technical Specification 3.5.2.5 Figure 2-A Rod Position Setpoints for Three-Pump Operation From 0 to 250 i10 EFPD - ANO-1 Cycle 13 i 110 100 --

90 --

80 -- SHUTDOWN

~ ( ., ) (269,77)

MARGIN 3 LEE (300, 77) ,

"4 70 --

(256.5,67)

$ OPERATION IN THIS y 60 --

REGION IS NOT (246.5,58)

% ALLOWED OPERATION M

~~

RESTRICTED (92.5, 43.5) (221.5,43)

E 30 --

PERMISSIBLE OPERATING 20 --

REGION 3o _ _ (47.5,13.5) 0 l' l l l l l l l l l l l l 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 3 00 Rod Index, % withdrawn 0 20 40 60 80 100 1 1 I I I I GROUP 7  ;

O 20 40 60 80 100 l l l 1 I I I l GROUP 6  !

0 20 40 60 80 100 '

I I I I I I GROUP 5 94R-1009-03 Revision 0 COLR page 6 ar20

Figure is referred to by Technical Specification 3.5.2.5 1

Figure 2-B Rod Position Setpoints for Three-Pump Operation From 250 i 10 EFPD to EOC - ANO-1 Cycle 13 110 100 -- '

90 --

80 --

(222.2, 77) (269, T7) j (300, 77) y 70 --

(256.5, 67) g SHUTDOWN y 60 --

OPERATION IN THIS MARGIN PERATION (246.5, 56) ,

% REGION IS NOT LIMIT RESTRICTE  !

go 50 --

ALLOWED ,

b* (177.5, 43.5) (221.5, 43) l is 40 --

cT.

30 --

PERMISSIBLE i OPERATING 20 --

REGION i l

100.5,13.5) 10 (0,1.0) 1 0 l l l l l l l l l l l l l l l 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 rod Index, % withdrawn 0 20 40 60 80 100 l I i l I I GROUP 7 0 20 40 60 80 100 l l I I I I GROUP 6 0 20 40 60 80 100 l 1 l i l l l  !

GROUP 5 94R-1009 03 Revison 0 i COLA l page 7 of 20  !

i I

Figure is referred to by  ;

Technical Specification 3.5.2.5 t Figure 3-A Rod Position Setpoints for Two-Pump Operation  !

From 0 to 250 i10 EFPD - ANO-1 Cycle 13  !

i 110

  • 100 - -

90 --

j 80 - -

1 W

2 70 - -

oo '

C W 60 - -

N OPERATION IN THIS MARGIN  !

o REGION IS NOT (162.6,82) (26s.8,$2)  :

LIMIT g so --

ALLOWED (300, 2) j g (256.5,44) l y 40 --

OPERATION (244.5,38) I o RESTRICTED '

30 --

(s2.5,2s) (221.s,2s) l 20 - - l PERMISSIBLE OPERATING 30 ~

~(o,o.s) 97.s, s) REGION O l l l l l l l l l l l l l l

]

O 20 40 60 80 100 120 140 160 180 200 220- 240 260 280 300 f Rod Index, % withdrawn i l

0 20 40 60 80 100 l l 1 I l l l i GROUP 7-  !

0 20 40 60 80 100 I I I I l l l

GROUP 6 '

0 20 40 60 80 100 l I I I I I  !

GROUP 5  :

94R 1009 03 Revisaan 0 i COLR page 8 a(20 l

Figure is referred to by Technical Specification 3.5.2.5 Figure 3-B Rod Position Setpoints for Two-Pump Operation From 250 i 10 EFPD to EOC - ANO-1 Cycle 13 9

110 100 - -

90 --

80 --

h 2 70 - -

  • A 60 --

g g SHUTDOWN (223.5,52) (269.8,52) 50 -- M ARGIN bo g (300, 52)

OPER AT10N IN THis LIMIT d 40 --

REGION IS NOT O P E R ATIO N R E 5 WCTE D (256.5,44) i$ ALLOWED (246.5,38) 30 --

(177.5,29)

O --

P E R M IS SIB L E OP E R ATIN G

' ~ '

(100.5,9)

(0, 0.7 )

o l l l l l l l l l l l l l l 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 rod Index, % withdrawn 1

0 20 40 60 80 100 1 I I I I I GROUP 7 0 20 40 60 80 100 I I I I I l GROUP 6 0 20 40 60 80 100 l 1 l l l l GROUP 5 94R-1009-03 Revision 0 COLR page 9 of 20

j l

Figure is referred to by Technical Specification 3.5.2.6 I

Figure 4 Operational Power Imbalance Setpoints for Four-Pump i Operation From 0 EFPD to EOC - ANO-1 Cycle 13 110 - -

(-19.8,102) . . (16.8,102) 100 - -

(-27.1, 92) g, ,

(18.1, 92)

(-30.6, 80) 80 - - (204 80) 70 - -

2 oo

(-33.9, so)O e 60 - -

p(33.a,so) m N

RESTRICE o 50 - -

REGION g REGION g40- -

S O

PERMISSIBLE A 30 - -

PERMISSIBLE OPERATING OPERADNG REGION REGION 20 - .

10 - -

l l 0l l l c. l l l0 l l

-50 -40 -30 -20 -10 0 10 20 30 40 50 Axial PowerImbalance

(

94R-1009-03 Revision 0 COLR page 10 of 20

Figure is referred to by Technical Specification 3.5.2.6 Figure 5 Operational Power Imbalance Setpoints for Three-Pump Operation From 0 EFPD to EOC - ANO-1 Cycle 13 110 - -

100 - -

l go . .

(-su,77), 80 - -

. (U.2, n)

( a 4 e s) ~m- -

(27.7, 89) 5 (419, so) q 260- -

> (318, so) oe C

$50- -

(*18)0  % o (x1,e) g40- -

RESm m D RES M E PEMASSBUE 30 - -

PEm4SSEE

" OPERAB W 6 mym REGON N REGION 20 - -

10 - -

l l 0l l l c l l lo l l

-50 40 -30 -20 -10 0 10 20 30 40 50 Axitd Pbv4rIrifxdarre 94R-1009-03 Revision 0 COLR page 11 of 20

Figure is referred to by Technical Specification 3.5.2.6 Figure 6 Operational Power Imbalance Setpoints for Two-Pump Operation From 0 EFPD to EOC - ANO-1 Cycle 13 110 - -

00 - -

1 g 90 -

C to

[m--

o 870- -

i i!: 60 - -

(-mg s2) o

, a ,(n.g s2)

~~

(448) t p(Mo,#)

(-x2,40) O 40 - - ogxg,m) ,

(M3,30) O PEMSSEE 30 -- PMBSSEE O (us,30)

OMAM ORRADE RESD41CTE) 20 - - REGON [

M M i 10 - -

i l l Cl l  ;  ;  ;  ;  ; o  ; <

-50 4) -30 -20 -10 0 10 20 30 40 50 AxialPbwerIninlance l

94R-1009-03 Revision 0 COLR page 12 of 20 r

1 l

1

\

i l

Figure is referred to by i Technical Specification 3.5.2 Bases i

Figure 7-A Mk-B8 LOCA Linear Heat Rate Limits l 19 is - :- - - - - - , - - - - - .- - - - - - - -(32000,18) .

. 84 . . . .

17 . . . . .

. 4a . . . . .

E . . . .

3  : . 64 . .

M

~ 16 '

28 10-ft' = * * =

E . .

~3 g 2-ft . .

e

/. 2200 psia . .

ig 15 -.: -- -- ,------ .------

oc  : . .

r------.---

f..------

r-------

g g . . . . . .

g . . . . . . .

.u if -~.. . . . . . .*. . . . . . .*. . . . . . . L . . . . . . .'. . . . . . .

  • .......L.......

e c  :

J  : . . . . . .

13

-E------.----

12 -:.------.---- - .- ---

r---- -.--- -- .------ r-------

g l l l l l (60000,11.6)  ;

11 naeaeaeaeiseaeaaaaaieaeaaaaaalsaaeaaaamiseaeaaeaaineaeaeaealseeaeaaee I I I I I 3 0 10000 20000 30000 40000 50000 60000 70000 Bumup (MWmtu) 94R-1009 03 Revision 0 COLR page 13 of 20 i

l j

I i

l 1

l l

Figure is referred to by I i

Technical Specification 3.5.2 Bases l

Figure 7-B Mk-B8ZL and Mk-B9ZL LOCA Linear Heat Rate Limits l l

l 19 18 - :-- - - - -

- - - - - - .- - - - - - - ,(39000,18)

. . . . . . i

4ft . . . . .

E6.,8,104tl l l l l  ;

17 - ----= - - -- = = - - -- - --

2.ft 2 ft ' ' '

l l

. s.wn . . \ .

E E . . . . 1 . .

3 .

x 3g - : . . . . . . . . . . 6.ft. '. . . . . . . . 's . . . . . . a' . . . . . .'.. . . . . . . '. . . . . . . .

2200 # a

.E._

a Sig 15 -:

a:

--s. ------ .----

--r--

r-------

g g . . . . . .

z . . . . . . .

u 34 si

..........s......

. . . . . . . . ... .....s.......

e

.c .

8 13 -

?------.------------

i (57000,12.6) 12 -------.-----.------r-----.-----.------r-------

11

  • naeaaeaasinaeaaaaeafaaaeaaaasinaaeaaeeainaeaeaeasinaaaaaaaelaaaaaeaea I I I I i i 0 10000 20000 30000 40000 50000 60000 70000 :

Bumup(mwd /mtu) 94R.1009-03 Revision 0 COLR page 14 of 20

Figure is referred to by Technical Specification 2.1.2 Figure 8 Axial Power Imbalance Protective Limits Thermal Power Level, %

120 - -

(-41.6,112) m (46.5,112)=

lA4 PUMP M N p(61.9,107.24)

  • OPERATION 100 - -

l 1 ( 41.6, 90.74) (46.5, 90.74) ;

(-60.9, 85.34)( l E p (61.9,86.98)

. 384 PUMP *

, OPERATION 80 - l

=

=(-41.6, 64.08) (46.5,64.08)l

(-60.9, 64.08)( m l ACCEPTABLE 60 - -

p (61.9,59.32) l 2,3&4 PUMP .

l OPERATION l

' ~~

(-60.9, 37.42)( f l

. ' 1 i

. 20 - - '

=

i

, (4.9, oh '

, , , , , l (61.9, 0) , l i ir i i -

i i ,, ,

-80 -60 -40 -20 0 20 40 60 80 l Axial Powerimbalance, % i l

i l 94R-1009 03 Revision 0 COLR I page 15 of 20

)

l l

l Figure is referred to by ,

Technical Specification 2.3.1  :

l Figure 9 Protection System Maximum Allowable Setpoints for  !

Axial Power Imbalance '

i Thermal Power Level, 120 I

(

, -31.s, 107) (as,107),

ACCEPTABLE . l l 100 - -

4 PUMP l

) (so.3,ts.8) l OPERADON .

1(41.s,79s[ g3,,7,,,3i

(-s0.3, 74.9) q .

ACCEPT M ' '

sa.4 PUMP . p (s0.3, s9.7)  :,

OPERADON .

l m- -

(-31.s, s2.s) (as, s2.s); l

(-s0.s,47.s) q l ACCEPTABLE .

2, as.4 PUMP ; ) (s0.3,42.4) no .

\

OPERATION .

i 0

0

(-s0.3,20.s) q 20 - -

l

. l

, (-s07,0), , , , , , ., , ,(s0.3,0) , j i i ,, i i - , , ,, ,

-80 40 40 -20 0 20 40 60 80 Axial Powerimbalance, %

1 94R-1009-03 Revision 0 COLR page 16 of 20

LIMIT IS REFERRED TO BY TECHNICAL SPECIFICATION 2.1 BASES KW/FT LIMIT FOR AXIAL POWER IMBALANCE PROTECTIVE LIMITS The combination of radial and axial peak that prevents central fuel melting at the hot spot is:

KW/FT Limit = 20.5 kW/ft 94R-1009 03 Revision 0 COLR page 17 of 20

LIMIT IS REFERRED TO BY TECHNICAL SPECIFICATION 3.1.8.3 AND 3.5.2.1 AND 3.5.2.2.2 AND 3.5.2.2.3 I

MINIMUM SHUTDOWN MARGIN The minimum available shutdewn margin shall be maintained 21 %Ak/k.

i l

E D

f 94R-1009-03 Reymon 0 COLR page 18 of 20

\

l

. i LIMITS ARE REFERRED TO BY TECHNICAL SPECIFICATION 3.5.2.5.4 AXIAL POWER SHAPING ROD INSERTION LIMITS Up to 480 +10/-10 EFPD, the APSRs may be positioned as necessary for transient imbalance control, however, the APSRs shall be fully withdrawn by 480 +10/-10 EFPD. After 480 +10/-10 EFPD, the APSRs shall not be reinserted.

i 94R-1009-03 Revision 0 COLR I page 19 of 20

l

\

N*

VALUES ARE REFERRED TO BY  !

TECHNICAL SPECIFICATION 3.5.2.4

{

ANO-1 CYCLE 13 TILT SETPOINTS i i

l FullIncore System WINDOW (EFPD) Tilt Setpoint Maximum Setpoint^

(%) (%)

0 to 250 +10/-10 4.40 25

~

250 +10/-10 To EOC 4.31 25 l Excore System Minimum Incore System (NIs) (Backup Recorders)

WINDOW (EFPD) Tilt Setpoint Tilt Setpoint

(%) (%)

0 EFPD To EOC 1.96 1.90

^ Independent of tilt measurement system.

f 94R-1009-03 Revision 0 COLR page 20 of 20