Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1992-76, Issuance of Supplement 1 to NUREG-1358, Lessons Learned from Special Inspection Program for Emergency Operating Procedures (Conducted 10/1988 - 09/1991) +
- ML17227A656 +
- ML17329A679 +
- ML18096B166 +
- ML18026B260 +
- ML20116N933 +
- ML20116N417 +
- ML20116N102 +
- ML20116M803 +
- 05000301/LER-1992-005, Forwards LER 92-005-00,per TS 15.4.2.A.7(a) After Each ISI, Number of Tube Plugged or Repaired in Each SG Shall Be Reported to Commission as Soon as Practical. Rept Also Reported Per TS Table 15.4.2-1 & TS 15.4.2.A.7(b) +
- ML20116M509 +
- ML20116M494 +
- ML20116M424 +
- ML20116M347 +
- ML20116M305 +
- ML20116L685 +
- ML20116L422 +
- ML20116L355 +
- ML20116L145 +
- ML20116K800 +
- ML20116K795 +
- ML20116K770 +
- ML20116K766 +
- ML20116K760 +
- ML20116K683 +
- ML20116K689 +
- ML20116K670 +
- ML20116K462 +
- ML20116K291 +
- ML20116K228 +
- ML20116J874 +
- ML20128C894 +
- ML20128C027 +
- ML20127J083 +
- ML20127D721 +
- ML20126K867 +
- ML20126A884 +
- ML20126A879 +
- IR 05000327/1992025 +
- BECO-92-128, Describes Changes in Scope of Corrective Actions Re Dcrdr Review Project.Changes Consist of Rewiring Demineralizer Outlet Conductivity Recorder Alarms & Removal of Turbine Steam Flow Signal from Recorder PR-640-28 +
- 3F1192-11, Requests NRC Approval of Temporary non-code Repair to Moderate Energy Portions of Closed Cycle Cooling Sys,Per Generic Ltr 90-05 +
- ST-HL-AE-4258, Special Rept:On 921007,SDG Tripped on Turbocharger Thrust Bearing Failure.Caused by Improper Installation of New Eutectic or Degradation of Turbocharger.Turbocharger Replaced.Vendor Manual,Drawings & Procedures Revised +
- ST-HL-AE-4254, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-498/92-26 & 50-499/92-26 on 921016.Corrective Actions: Plant Procedures Revised to Control Use of Changing Acceptance Criteria by 921130 +
- 2CAN119201, Confirms That Initial Tests & Activities Described in Correspondence Re GL 89-13, Service Water Sys Problems Affecting Safety-Related Equipment, Have Been Completed for ANO-2 +
- ST-HL-AE-4251, Responds to NRC Re Violation Noted in Insp Rept 50-498/92-26.Corrective Actions:Plant Bulletin Issued Reiterating Requirements to Signoff,Check or Initial Work Performance as Soon as Practical +
- ST-HL-AE-4250, Responds to NRC Re Violation Noted in Insp Rept 50-499/92-26.Corrective Action:Individual Svc Requests Will Be Issued to Perform Insp & PMT of Remaining Breakers Ref in SR 115415 & Maint Planner Guide Revised +
- HL-3037, Submits Comments Re Ei Hatch Nuclear Plant License Amends for Southern Nuclear to Become Licensed Operator,Submitted to NRC on 920918,per Oglethorpe Power Corp Request +
- ELV-05047, Submits Comments Re License Amends Application for Southern Nuclear to Become Licensed Operator,Submitted to NRC on 920918,per Oglethorpe Power Corp Request +
- PY-CEI-NRR-1565, Forwards Response to NRC Re Unresolved Item Noted in Insp Rept 50-440/92-14 on 920706-0807.Corrective Actions: Compliance Unit Personnel Who Investigate & Prepare LERs Will Review Unresolved Item Response +
- ML20056E601 +