g-Omaha Public Power Disitict 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 November 13, 1992 LIC-92-320 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station Pl-137 Washington, D.C.
20555
REFERENCES:
1.
Docket No. 50-285 2.
U.S. NRC Generic letter 89-04 dated April 3, 1989 3.
Letter from OPPD (W. G. Gates) to NRC (Document Control vesk) dated October 8, 1990 (LIC-90-0756) 4.
ASME/ ANSI Operation and Maintenance of Nuclear Power Plants (0&M) Manual Parts 1, 6 and 10,1987 Edition, 1988 Addenda 5.
Americ.n Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 1989 Edition 6.
Letter from NRC (J. T. Larkins) to OPPD (W, G. Gates) dated May 5, 1992 (NRC-92-194) 7.
Letter from OPPD (W. G. Gates) to NRC (Document Control Desk) dated September 3, 1992 (LIC-92-278R)
Gentlemen:
SUBJECT:
Submittal of the Fort Calhoun Station (FCS) Inservice Inspection (ISI) Program Plan for the Third 120 Month Inttrval (1993 - 2003)
Pursuant to the requirements of 10 CFR 50.55a and the Reference 5 ASME Code, Omaha Public Power District (OPPD) submits the FCS ISI Program Plan, Revision 0 for the plant's third 120 month inspection interval commencing on September 26, 1993.
Tha FCS ISI Program Plan incorporates the requirements of the ASME Section XI Code (l (1987 Edition, 1909 Addenda, Parts 1, 6 and 10) for pump 1989 Edition) for NDE examinations and repair / replacement, and the O&M Manua and valve testing.
For the convenience of the NRC reviewers, an additional version of Plan lable 2.1 (Valve Test Program Matrix) sorted by systems is included.
OPPD requests that the NRC complete review of this Plan prior to July 1,1993 to allow OPPD suf ficient preparation time for implementation. OPPD intends to implement the FCS ISI Program Plan for the third 120 month interval on September 26, 1993.
153 0 0 w 9211170077 921113
[
A(I PDR ADOCK 05000285 O
PDR bL j
--gg-t,(
cs.
b U. S. Nuclear Regulatory Commission LIC-92-320
'-Page 2 I
If you should have any questions, please contact me.
Sincerely, AV. S. /W W. G. Gates Vice President -