ML20126K867

From kanterella
Jump to navigation Jump to search
Confirms 921105 Telcon Re Enforcement Conference to Be Conducted in Atlanta,Ga on 921124 to Discuss Inadequately Controlled Unit 1 Rwl Draining Evolution Which Resulted in Inadvertent Low Level Isolation of SDC on 921002
ML20126K867
Person / Time
Site: Brunswick 
Issue date: 11/13/1992
From: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Watson R
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9301070275
Download: ML20126K867 (4)


Text

.

y, a

.s ld

=.,

g 13 J

Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-62 Carolina Power and Light Company ATTN: Mr. R. A. Watson Senior Vice President Nuclear Generation P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

ENf0RCEMENT CONFERENCE < BRUNSWICK This confirms the telephone conversation between Mr. R. B. Richey of your staff and Mr. H. O. Christensen of this office on November 5,1992, concerning-an Enforcement Conference to be conducted at the Region _ II Office, Atlanta, Georgia on November 24, 1992, at 10:00 a.m.

We requested this meeting to discuss the inadequately controlled Unit I reactor water level draining evolution which resulted in the inadvertent low level isolation of shutdown cooling on October 2, 1992. A proposed meeting agenda is enclosed.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, Originai signed by:

Jon R.~ Johnson /for Ellis W. Merschoff, Director Divis'<m of Reactor Projects

Enclosure:

Proposed Meeting Agenda cc w/ encl:

R. E. Morgan-Interim Manager

. Brunswick Nuclear Project.

-P 0.-Box 10429

-Southport, NC 28461

[

(cc w/ encl cont'd - See page 2)

{

l I

I 9301070275 921113

.s

- ADOCK 05000325 I E o t-l:

PDR-ena

m-

.y t

^

ggy 131992

._.s Carolina Power and Light Company 2-

-(cc w/ encl cont'd)

H. Ray Starling Vice President - Legal Department Carolina Power and-Light Co.

P. 0. Box 1551 i

Raleigh, NC 27602 Kelly.. Holden Board of Commissioners P. O. Box 249 Colivia, NC 28422 Chrys Baggett State Clearinghouse.

Budget and Management 116 West Jones Street Raleigh, NC 27603 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environment,

Health & Natural Resources P. O. Box 27687 Raleigh, NC 27611-7687 H. A. Cole Special Deputy Attorney General:

State of North Carolina P. O. Box 629 Raleigh, NC 27602 Robert P. Gruber

-Executive Director Public Staff - NCUC P. O. Box 29520-Raleigh, NC 27626-0520 Ms. Gayle B. Nichols

~

. Staff Counsel-

'SC Public' Service Commission-P.-0. Box 11649 Columbia, SC 29211 A

bec w/ encl:

(See page 3)

~.. -.

4,

' g.i S=

NOV 13 632 Carolina' Power and Light Company-3 -'

.bcc'w/ enc 1:

-Document Control Desk 11.- Christensen, RII' R. Lo, NRR NRC Resident Inspector U.S. Nuclear Regulatory Commission Star Route 1, Box 208 Southport, NC 28461 1

l^

l' Lp'}E

. RigDy RII P

RII:DRS-RI C

RIl DRP Y

RCarroll:tj hcl!ristenen DVerrelli-AGibson dbn"ns JJo nson 11/i /92 11/4/92 11/-~/92.-11/p92 11/Q/92 11//2 /92 1

-k

c.. :.

.i if ENCLOSURE Proposed Hecting Agenda November 23, 1992 i

i I.

Opening Remarks S. D. Ebneter II.

Discussion Of The October 2,1992, R. E. Morgan Unit 1 Reactor Water level Draining Event With Respect To:

a.

Inadequate Command, Control and Communications:

Inattentiveness and/or unawareness of draining evolution by cnntrol room operators.

Existence / tolerance of control room distractions (i.e., reading of non-operational material, excessive administrative duties, etc..).

b.

Inadequate Management /Prograamatic Controls:

Scheduling /providing clearance for the digital feedwater modification without adequately communicating, or compensating for, the disablement of the audible high/

low level annunciator.

Scheduled / planned use of RHR Loop B as a primary shutdown cooling nethod, despite a known valve deficiency.

Corrective actions taken on October 1,'1992, l

to preclude excessive vessel draining.

l III. Closing Remarks S. D. Ebceist i

l' o

l u

t 1

.