ML20127D721

From kanterella
Jump to navigation Jump to search
Notification of Significant Meeting W/Util on 921123 in Atlanta,Ga to Conduct Enforcement Conference to Discuss Inadequately Controlled Unit 1 Rwl Draining Evolution That Resulted in Inadvertent Low Level Isolation on 921002
ML20127D721
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 11/13/1992
From: Christensen H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9301190021
Download: ML20127D721 (2)


Text

4 1 '

Il0V 1 a a e Fil [h,PY NOTICE OF SIGNIFICANT M RTING Name of Licensee: Carolina Power and Light Company (CP&L)

Name of Facility: Brunswick Units 1 and 2 Docket Nos.: 50-325 and 50-324 Date and Time of Meeting: November 23, 1992, at 10:00 a.m.

Location of Meeting: Region II Office, Atlanta, Georgia Purpose of Meeting: Enforcement Conference to discuss the inadequately controlled Unit I reactor water level draining evolution which resulted in the inadvertent low level isolation of shutdown cooling on October 2,1992.

RII Cognizant Division: Reactor Projects NRC Attendees:

S. D. Ebneter, Regional Administrator Region II (RII)

L. A. Reyes, Deputy Regional Administrator, RII J. R. Johnson, Deputy Director, Division of Reactor Projects (DRP), RII A. F. Gibson, Director, Division of Reactor Safety, (DRS), RII G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff (EICS),RII l E. G. Adensam, Director, Project Directorate 11-1, Office of

! Nuclear Reactor Regulation (NRR)

D. M. Verrelli, Chief, Reactor Projects Branch 1, DRP, RII H. O. Christensen, Chief, Reactor Projects Section lA, DRP, RII D. J. Nelson, Resident Inspector - Brunswick, DRP, RII R. Lo, Project Manager, NRR Licensee Attendees:

R. A. Watson, Senior Vice President, Nuclear Operations R. E. Morgan, Interim Manager, Brunswick Nuclear Project K. J. Ahern, Manager, Operations - Unit 2 S. D. Floyd, Manager, Regulatory Compliance R. A. Niec, Control Room Operator B. S. Strickland, Shift Supervisor M. A. Barton, Senior Control Operator T. P. Hackier, Control Room Operator D. C. McCarthy, Manager, Nuclear Licensing M. Calvert, legal Department l

15-107 9301190021 921113 L PDR ADOCK 05000325 \(0 S PDR

,n l.- Nov u mgg Natice of Significant Meeting 2 ,

NOTE: Attendance by NRC personnel at this NRC/ Licensee meeting should be made known by 2:00 p.m., November 20, 1992, via telephone call to R. -E. Carroll at (404) 331-5543. Original signed by:  ;

Harold 0. Christensen Approved by:

H. O. Christensen, Chief Reactor Projects Section lA Division of-Reactor Projects-Distribution: J. Taylor, Executive Director for Operations J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research H. Thompson, Deputy Executive Director for Nuclear Materials Safety, Safeguards and Operations Support T. Murley, Director, Office of Nuclear Reactor Regulation (NRR)

S..Varga, Director, Division of Reactor Projects 11-1, NRR G. Lainas, Assistant Director for Region II Reactors, NRR E. Adensam, Director, Project Directorate 11-1, NRR J. Goldberg, General Counsel for Hearing and Enforcement J. Lieberman, Office of Enforcement L. R. Plisco, Regional Coordinator, E00 R. Lo, Project Manager, NRR ,

^

bec: S. D. Ebneter L. A. Reyes J. R. Johnson A. F. Gibson -

J. P. Stohr G. R. Jenkins K. M. Clark All NRC Attendees on Notice Docket File Receptionist-C. . S va a

)

P- RI :DRP - 'RII:9RP ~ RI LH RIIORP RII: g S g/(4C ' f .

l RC rr611:tj H istensen- DVerrelli GJen4 ns J/ohnson 11//d/92 ll/1Y92 ll/rt/92 11/f @ 2 11/jy92