Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1995-56, Shielding Deficiency in Spent Fuel Transfer Canal at a Boiling-Water Reactor +
- ML17333A215 +
- ML18065A348 +
- ML18065A346 +
- ML18153A556 +
- ML092660287 +
- ML20096B546 +
- ML20096A653 +
- ML20095G553 +
- ML20095F874 +
- ML20095F750 +
- ML20095F607 +
- ML20095F538 +
- ML20095F494 +
- ML20095F399 +
- ML20095F142 +
- ML20095E862 +
- ML20095E847 +
- ML20095E712 +
- ML20095E702 +
- ML20095E680 +
- ML20095E660 +
- ML20095E133 +
- ML20095D832 +
- ML20134H838 +
- ML20129A473 +
- ML20266B423 +
- ML20266B206 +
- DCL-95-272, Supports Comments Submitted by NEI Re Licensee Qualification for Performing Safety Analyses,With Listed Exception.Nrc Should Allow Traning Requirement to Be Met by on-job Training +
- NRC-95-4609, Forwards Nonproprietary & Proprietary Presentation Matls from 951206 Meeting on AP600 Containment Test & Analysis Program Activities.Proprietary Presentation Matls Withheld Per 10CFR2.790 +
- NRC-95-4601, Forwards Rev 1 to WCAP-14254, AP600 SPES-2 Test Analysis Rept. Rept Withheld (Ref 10CFR2.790) +
- NG-95-3533, Forwards Corrected Page 8-2 as Well as Page 8-1 & Page 36 of App B from DAEC USI A-46 Seismic Evaluation Rept (Previously Submitted as Attachment 1 to Util ) +
- ST-HL-AE-5249, Forwards Four Copies of Rev 1A to Plant Safeguards Contingency Plan.Encl Withheld +
- HL-5083, Provides Comments on Suppl 1 to GL 83-11, Licensee Qualification for Performing Safety Analyses +
- 3F1295-16, Requests Use of Code Case N-523 to Install Temporary Mechanical Clamping Device in Section of safety-related, Class 3 Piping as Repair for through-wall Leak +
- HL-5081, Informs of Rev to Implementation Schedule Re GL 94-02, Thermal-Hydraulic Instabilities in Bwrs +
- ML20265D494 +
- 05000317/LER-1995-005-01, :on 951109,manual Reactor Trip Occurred Due to Increasing SG 11 Water Level.Caused by Failure of Digital Control Module FIC-1111.Controller Sent to Vendor for Troubleshooting & Root Cause Analysis +
- 05000354/LER-1995-031, :on 951110,plant Shut Down Due to Inability to Perform Surveillance 4.6.2.1,drywell to Suppression Chamber Pressure Decay Test.Vacuum Breakers Will Be Tested & Testing Methodology Will Be Revised +
- 05000354/LER-1995-032, :on 951114,failed to Complete Flood Protection Actions within Required Timeframe,Resulting in TS Violation Due to Low Mgt Priority Placed on Resolving Watertight Door Problems Properly.Watertight Door Repaired +
- ML20095F989 +
- ML20095F983 +
- ML20198L854 +
- HNP-95-108, Forwards Revised Semi-Annual Effluent Release Rept for Period of Jul-Dec 1994. Attachment to Ltr Provides Revised Pages W/Corrected Values +
- 05000400/LER-1995-012-01, :on 951110,containment pre-entry Purge Valve 1CP-1 Drifted Open During Mode-1 Power Operation.Caused by Inadequate Means to Ensure That Air Operated Valves Sealed Closed.Aligned Instrument Air Sys +
- L-95-322, Provides Suppl Info on Westinghouse Alloy 600 SG Mechanical Tube Plugs,Per NRC Bulletin 89-001 +
- L-95-318, Submits Response to NRC Request for Addl Info Re GL 95-03, Circumferential Cracking of SG Tubes +
- ML17158B057 +
- ML17158B058 +
- ML18011B083 +