Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 12/11/1995
From: James Smith
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-10, NUDOCS 9512180071
Download: ML20095E660 (2)


Text

.-

)

s O

A Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37370-2000 1

December 11,1995

)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket No. 50-327 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SON) - NOTIFICATION OF CLOSURE OF GENERIC LETTER (GL) 89 SAFETY-RELATED MOTOR OPERATED VALVE SURVEILLANCE AND TESTING

Reference:

TVA letter to NRC dated November 26,1991, "Sequoyah Nuclear Plant (SQN) - TVA Response to NRC Inspection Report 91-18 Regarding Generic Letter (GL) 89-10" Pursuant to 10 CFR 50.54(f) and in accordance with item (m) of the subject GL, this letter provides notification that recommended Actions (a) thru (h) of GL 89-10 have been implemented for SON Unit 1.

TVA committed to have the SON Unit 1 GL 89-10 program implementation complete by the end of the Unit 1 Cycle 7 refueling outage. This commitmentis contained in TVA's referenced letter. The Unit 1 Cycle 7 refueling outage ended on November 11, 1995.

GL 89-10 requires licensees to notify NRC in writing within 30 days or the completion i

of the required actions described in the GL. This letter confirms TVA's completion of j

design-basis reviews, analyses, verifications, tests, and inspections performed to comply with the GL for SON Unit 1.

10C0C9 1

0 9512180071 951211 PDR ADOCK 05000327 P

PDR j

l

7.-.

i i

s'

\\

c U.S. Nuclear Regulatory Commission Page 2

- December '11,1995

)

Please direct questions concerning this issue to D. V. Goodin at (423) 843-7734.

Sincerely, M

. J. D. Smith Acting Manager SON Site Licensing Sworn to and subscribed before me this //4 day of 26 1995 MM NoWPublic

~

My Commission Expires dodii4W W, /ff/

cc: Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 lgou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 9