Discusses Insp Rept 50-400/95-13 on 950806-0902 Re Identification of Apparent Falsification of Radiological Survey Record by Hpt
ML18011B083
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/11/1995
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robinson W
CAROLINA POWER & LIGHT CO.
Shared Package
ML18011B084 List:
References
EA-95-278, NUDOCS 9512180405
Download: ML18011B083 (3)


See also: IR 05000400/1995013

Text

EA 95-278

December

11,

1995

Carolina

Power

& Light Company

ATTN:

Hr.

W.

R. Robinson

Vice President

- Harris Plant

Shearon

Harris Nuclear Plant

P. 0.

Box 165, Hail Code:

Zone

1

New Hill, North Carolina

27562-0165

SUBJECT:

NRC

INSPECTION

REPORT

NO. 50-400/95-13

Dear Hr. Robinson:

This letter refers to an inspection

conducted during the period August

6

through September

2,

1995, at the Shearon Harris Nuclear Plant.

During the

inspection,

the

NRC examined the facts

and circumstances

regarding your

identification of an apparent falsification of a radiological

survey record

by

a health physics technician

(HPT).

As

a result of our initial review of the

matter,

an Unresolved

Item was identified (50-400/95-13-01),

and documented

in

the subject report dated

September

28,

1995.

As discussed

in detail in the Inspection Report,

as

a result of a routine

review of completed radiological

survey documentation,

you questioned

the

validity of a survey conducted

by an

HPT on July 28,

1995.

Your subsequent

investigation of the incident established

that the

HPT did not perform

a

required monthly survey of the 236-foot elevation of the Waste Processing

Building on July 28,

1995; that the

HPT prepared,

signed,

and dated

a survey

form for the area in question

when

a survey

had not been performed;

and that

the HPT's explanation of how the survey was allegedly conducted

was not

supported

by the verifiable facts in the case.

On August 11,

1995,

you

informed the

HPT that her employment with Carolina

Power

and Light Company was

terminated.

As an employee at

a nuclear

power plant, the technician

was placed in a

position where her performance

was expected to be above reproach.

This

includes

assurance

that all work is performed in accordance

with procedures

and that all records of activities are complete

and accurate.

As determined

by your investigation,

the HPT's actions in July 1995 did not adhere to these

standards.

Accordingly,

on October 20,

1995, I issued

a letter to the

individual re-enforcing

NRC's expectations

in this regard

(Enclosure).

The NRC's review of this matter

has

been completed.

Although the

falsification of records is

a serious matter of regulatory concern,

I have

decided,

pursuant to Section VII.B.1 of the Enforcement Policy and after

consultation with the Director, Office of Enforcement,

that

no action will be

taken with respect

to Carolina

Power

and Light Company in this case.

The

bases for this decision are:

1) you identified the record falsification as

a

result of your self-monitoring efforts as well as

an alert health physics

staff with a questioning attitude;

2) the violation appeared

to be the

isolated act of one individual who held

a low level position in your overall

95i2i80405 95i2ii

PDR

ADOCK 05000400

8

PDR

CP&L

organization;

3) you conducted

a prompt and thorough investigation;

and 4) you

implemented corrective action,

including disciplinary action against

the

individual involved.

This closes

NRC action in this matter,

and

no formal response

to this action

is required.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of

Practice,"

a copy of this letter and its enclosure will be placed in the

NRC

Public Document

Room.

If you should

have

any questions

regarding this letter,

please

contact

Mr. Milton Shymlock, Chief, Branch 4, Division of Reactor Projects,

at

404-331-5535.

Sincerely,

Original signed

by

Jon

R. Johnson for

Enclosure:

As stated

Stewart

D. Ebneter

Regional Administrator

Docket No. 50-400

License

No.

NPF-63

cc w/encl:

J.

Cowan,

Manager

Nuclear Services

& Environmental

Support Department,

MS OHS7

Carolina

Power

& Light Company

P. 0.

Box 1551

Raleigh,

NC

27602

J.

W. Donahue

Plant Manager

- Harris Plant

Carolina

Power

& Light Company

Shearon Harris Nuclear

Power Plant

P. 0.

Box 165,

MC:

Zone

1

New Hill, NC

27562-0165

T. D. Walt, Manager

Regulatory Affairs

Carolina

Power

& Light Company

Shearon Harris Nuclear

Power Plant

P. 0.

Box 165, Mail Zone

1

New Hill, NC

27562-0165

cc w/encl cont'd:

(See

page 3)

CPSL

cc w/encl (cont'd):

R.

E. Jones

General

Counsel

- Legal Department

Carolina

Power

& Light Company

P. 0.

Box 1551

Raleigh,

NC

27602

Dayne H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environmental

Commerce

8 Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

Karen

E.

Long

Assistant Attorney General

State of North Carolina

P. 0.

Box 629

Raleigh,

NC

27602

Public Service

Commission

State of South Carolina

P. 0.

Box 11649

Columbia,

SC

29211

Chairman of the North Carolina

Utilities Commission

P. 0.

Box 29510

Raleigh,

NC

27626-0510

Robert

P. Gruber

Executive Director

Public Staff

NCUC

P. 0.

Box 29520

Raleigh,

NC

27626

Uva Holland,

Chairman

. Board of County Commissioners

of Chatham

County

P. 0.

Box 87

Pittsboro,

NC

27312