ML17158B057

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 95-109 W/Util on 960104 Re Predecisional Enforcement Conference to Discuss Secretary of Labor Decision Concerning Security Force Member Protected Activity at Plant
ML17158B057
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/11/1995
From: Pasciak W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9601020015
Download: ML17158B057 (3)


Text

'CATEGORY 2

REGULATOR INFORMATION DISTRIBUTION S STEM (RIDS)

ACCESSION NBR:9601020015 DOC.DATE: 95/12/11 NOTARIZED:

NO 'OCKET I FACIL:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva 05000387 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva 05000388 AUTH.NAME AUTHOR AFFILIATION PASCIAK,W.J.

Region 1 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION Region 1 (Post 820201)

SUBJECT:

Notification of significant licensee meeting 95-109 w/util on 960104 re predecisional enforcement conference to discuss Secretary of Labor decision concerning security force member protected activity at plant.

DISTRIBUTION CODE:

IE45D COPIES RECEIVED:LTR ENCL.

SIZE:

TITLE: Summary of Significant Meeting with Licensee (P rt 50)

E NOTES:

RECIPIENT ID CODE/NAME PD1-2 PD COPIES LTTR ENCL RECIPIENT ID CODE/NAME POSLUSNYFC COPIES LTTR ENCL 05000387 6

0 INTERNAL: DEDRO NRR/DISP/PIPB RES/DSIR/EIB EXTERNAL: NOAC NOTES:

1 1

ILE CENTER OGC/ROED RGN1 FILE 01 NRC PDR D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COFIEB REQUIRED:

LTTR 11 ENCL P(

December 11, 1995 No.95-109 U.S.

NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:

Facility:

Pennsylvania Power and Light Company (PP&L)

Susquehanna Steam Electric Station Docket Nos.:

50-387/50-388 Date and Time:

Thursday, January 4,

1996; 10:00 AM Location:

Purpose:

NRC Attendees:

PP&L Attendees:

Hain Conference Room Region I Office King of Prussia, PA Predecisional Enforcement Conference to Discuss the Secretary of Labor's Decision Concerning a Security Force Member's Protected Activities at Susquehanna T. Hartin, Regional Administrator, Region I K. Smith, Regional

Counsel, Region I D. Holody, Enforcement Officer, Region I R. Cooper, Director, Division of Reactor Projects (DRP)

W. Pasciak, Chief, Projects Branch 4, DRP J. Stolz, Project Director, Nuclear Reactor Regulation (NRR)

R.

Byram, Senior Vice President Nuclear G. Stanley, Vice President - Nuclear Operations G. Kuczynski,'anager of Plant Services W. Burchill, Manager of Nuclear Assessment Services J.

Kenny, Supervisor, Nuclear Licensing D. Zdanavage, Supervisor, Nuclear Security S. Sp'angler, Counsel J. Silberg, Esq.,

Shaw, Pittman, Potts

& Trowbridge NOTE:

This meeting is closed to the public observation in accordance with NRC policy since internal personnel issues and safeguards information may be discussed.

Attendance by additional NRC personnel or handicapped persons requiring assistance to attend the meeting should be made known to Walter Pasciak at (610) 337-5258 by January 2,

1996.

. 08o00 Prepared by:

ORIGINAL SIGNED BY:

a er ascia ie Projects Branch 4

Division of Reactor Projects eeof0200<5 95<var PDR ADOCK 05000387 P

PDR

Distribution: (Via E-Nail)

J.M. Taylor, Executive Director for Operations (EDO)

J. Milhoan, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and,Research (DEDR)

W. T. Russell, Director

, Office of Nuclear Reactor Regulation H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

J.

Lieberman, Director, Office of Enforcement B. Grimes, Director, Division of Operating Reactor Support, NRR R. Spessard, Director, Division of Technical

Support, NRR A. Thadani, Associate Director for Inspection and Technical Assessment, NRR R.

Zimmerman, Associate Director for, Projects, NRR S. A. Varga, Director, Division of Reactor Projects I/II, NRR J. Stolz, Director, PD I-2, NRR W. Dean, Regional Coordinator, OEDO N.. Green, Jr., Policy Development and Technical Support Branch S.

Bajwa, RPEB, NRR S. -Lewis, Office of the General Counsel (OGC)

J.

Shea, Project Manager, Peach
Bottom, PD I-2, NRR W. Schmidt,
SRI, PB D. Screnci, Public Affairs Officer, RI V. Dricks, Field Public Affairs Officer, RI D. Chawaga, SLO C. Gordon, ORA M. Campion, ORA Distribution:

PUBLIC D.M. -Smith, PECO Energy State of Pennsylvania RA Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRSS Division Secretary, RI DRMA Division Secretary, RI Region I Receptionist DOCUMENT NAME:

a:susq.mtg To recehe a copy of this document, indicate in the box: 'G Copy without attachmen%ncfosure

'E ~ Copy with attachment/enctosure "N'

No copy OFFICE RI:DRP NAME W. Pasciak DATE I

195 OFFICIAL RECORD COPY