Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16341F464 + (22:37:24, 9 January 2025)
- ML16341F451 + (22:37:25, 9 January 2025)
- ML16341F449 + (22:37:27, 9 January 2025)
- ML16341F448 + (22:37:28, 9 January 2025)
- ML16341F446 + (22:37:29, 9 January 2025)
- DCL-89-285, Forwards Public Version of Epips,Consisting of Pages 15,29 & Test Data Sheets to Rev 10 to EP M-4, Earthquake, & Pages 32-1 & 32-3 to Rev 16 to EP M-6, Nonradiological Fire. W/891205 Release Memo + (22:37:30, 9 January 2025)
- ML16341F432 + (22:37:34, 9 January 2025)
- ML16341F426 + (22:37:35, 9 January 2025)
- ML16341F424 + (22:37:37, 9 January 2025)
- ML16341F420 + (22:37:38, 9 January 2025)
- ML16341F408 + (22:37:39, 9 January 2025)
- IR 05000275/1989019 + (22:37:45, 9 January 2025)
- ML16341F402 + (22:37:47, 9 January 2025)
- ML16341F392 + (22:37:49, 9 January 2025)
- ML16341F389 + (22:37:50, 9 January 2025)
- ML16341F386 + (22:37:51, 9 January 2025)
- PNO-V-89-063, discovered That 28 of 58 Incore Flux Probe Thimble Tubes W/Fretting Wear Beyond Acceptable Criteria. Cause Not Stated.Tubes Will Be Replaced W/Greater than 50% Through Wall Indications + (22:37:54, 9 January 2025)
- ML16341F384 + (22:37:56, 9 January 2025)
- TAC:71812 + (22:37:57, 9 January 2025)
- ML16341F382 + (22:37:59, 9 January 2025)
- ML16341F378 + (22:38:00, 9 January 2025)
- ML16341F375 + (22:38:02, 9 January 2025)
- PNO-V-89-061, on 891017,earthquake Occurred in San Francisco Bay Area & Felt within Protected Area of Facility.Ground Acceleration Was 0.0044g.Licensee Completed Insp of Plant & No Damages Identified + (22:38:05, 9 January 2025)
- PNO-V-89-061A, on 890818,unusual Event - Earthquake (Update). Small Gas Leak Identified in Overrhead Space Heater Was Immediately Repaired + (22:38:08, 9 January 2025)
- PNO-V-89-059, on 891006,reactor Trip & Safety Injection from 100% Power Occurred Due to Instrumentation Problems. Refueling Outage Scheduled to Begin Early & Restart Will Not Be Attempted + (22:38:12, 9 January 2025)
- ML16341F361 + (22:38:13, 9 January 2025)
- ML16341F353 + (22:38:15, 9 January 2025)
- ML16341F350 + (22:38:17, 9 January 2025)
- ML16341F348 + (22:38:18, 9 January 2025)
- ML16341F328 + (22:38:20, 9 January 2025)
- ML16341F326 + (22:38:21, 9 January 2025)
- ML16341F325 + (22:38:23, 9 January 2025)
- ML16341F323 + (22:38:25, 9 January 2025)
- TAC:74365 + (22:38:26, 9 January 2025)
- ML16341F307 + (22:38:30, 9 January 2025)
- IR 05000275/1989016 + (22:38:34, 9 January 2025)
- ML16341F304 + (22:38:37, 9 January 2025)
- PNO-V-89-051, on 890828,reactor Shut Down for Longer than 48 H Due to Reactor Trip.Caused by Failed Reactor Coolant Pump Motor Lead.Plans Underway to Reset Actuation Relay Setpoints to Minimize Starts Due to Voltage Transients + (22:38:40, 9 January 2025)
- ML16341F298 + (22:38:42, 9 January 2025)
- ML16341F295 + (22:38:44, 9 January 2025)
- ML16341F284 + (22:38:45, 9 January 2025)
- ML16341F281 + (22:38:47, 9 January 2025)
- ML16341F279 + (22:38:52, 9 January 2025)
- IR 05000275/1989018 + (22:38:58, 9 January 2025)
- ML16341F273 + (22:38:59, 9 January 2025)
- ML16341F271 + (22:39:01, 9 January 2025)
- ML16341F265 + (22:39:03, 9 January 2025)
- ML16341F264 + (22:39:04, 9 January 2025)
- ML16341F262 + (22:39:07, 9 January 2025)
- ML16341F261 + (22:39:09, 9 January 2025)
- ML16341F260 + (22:39:10, 9 January 2025)