UINTED STATES NUCLEAR REGULATORY COMMISSlON REGION V 1460 MARIALANE. SUITE 210 WALNUTCREEK, CALIFORNIA9l6964368 QUQ 1 i 1989 Docket Nos. 50-275 and 50-323 Pacific Gas and Electric Company ATTN:
J.
D. Shiffer, Vice President Nuclear Power Generation 77 Beale Street, Room 1451 San Francisco, California 94106
Dear Sir:
This letter confirms our conversation of August ll, 1989 in which you agreed that your organization would participate in the Nuclear Regulatory Comission's (NRC) Regulatory Impact Survey on September 25, 1989.
We appreciate your cooperation in this effort.
Information regarding this survey is provided below.
The NRC has received feedback from nuclear utilities and nuclear utility organizations that NRC generic and site specific activities may be moving in a direction such that the desired safety effects may not be realized.
As a
result of this feedback, the NRC plans to conduct a survey of licensee staff members representing several organizational elements and levels at several utilities throughout the nation.
The feedback from licensee staff members will be evaluated to determine what changes, if any, should be made to the NRC's regulatory approach to enhancing the safe operation of nuclear power plants.
The survey will be conducted during September through November 1989 by a team of approximately five senior NRC managers from the Office of Nuclear Reactor Regulation, Office for Analysis and Evaluation of Operational Data and the Regional Of'fices.
Nlr. A. Bert Davis, Region III Administrator, will lead the overall effort.
The meeting with your organization will be held at Diablo and general discussion groups are shown in the enclosure.
members of your organization discuss, without reservation views on NRC generic and site specific activities and how affected by the activities of other organizations such as insurance companies.
Problems and issues identified will associated with the individuals or with your company.
Canyon.
The schedule We desire that or limitations, their NRC activities may be INPO, states, and not be directly Please provide the name and phone number of an individual within your organization that we can contact in case of questions concerning meeting logistics.
This information should be provided by telephone to Cindy Pederson, Region III, at (312) 790-5540 by August 18, 1989.
8508i80274 qg08ii PDR ADOCK 0=000"75 P
Pacific Gas and Electric Company A'.!"- i i !993 h
Again, we appreciate your willingness to cooperate in this important initiative.
ice will gladly discuss any questions you have concerning this survey.
Si
- rely,
Enclosure:
As stated John B. Martin Regional Administrator cc w/enclosure:
Standard Distribution A. Bert Davis, NRC, Region III 799 Roosevelt Road Glen Ellyn, Il 60137
TIHE NRC REGULATORY IHPACT SURVEY September 25, 1989 DISCUSSION GROUP*
8:30 a.m. - 10:00 a.m.
10:00 a.m. - 11:30 a.m.
Senior Reactor Operators, Reactor Operators, Shift Technical Advisors, Shift Foreman, and Operational Supervisors Plant gA Engineers, Maintenance Engineers, Nuclear Engineers, Electrical Engineers, and Health Physicist Il:30 a.m. - I2:30 p.m.
Lunch 12:30 p.m. - 2:00 p.m.
Corporate Licensing Engineer, Corporate gA Manager, Manager of Planning and Scheduling, Project
- Engineer, and Corporate Training Officer 2:00 p.m. - 3:30 p.m.
3:30 p.m. - 5:00 p.m.
Managers of Operations, Construction, Engineering, Maintenance,
- Design, Radiation Protection, Security and Emergency Preparedness Executive Vice President, Senior Vice President, and other corporate personnel
<<The organizational titles listed are general in nature and may not be used at your facility.
Please alter, as necessary.