ML16341F273

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/89-18 & 50-323/89-18 on 890619-23 & 0710-14.Violation Noted But Will Not Be Cited Based on Util Satisfying Criteria Specified in Section V.G of Enforcement Policy
ML16341F273
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/26/1989
From: Yuhas G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341F274 List:
References
NUDOCS 8908150073
Download: ML16341F273 (6)


See also: IR 05000275/1989018

Text

gC CEISRATED

.

DlSTKBU'EON

DEMONSTRATION

SYFI'KM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

A'""CESSION NBR.8908150073

DOC.DATE: 89/07/26

NOTARIZED: NO

DOCKET

IL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-f23 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

TH.NAME

AUTHOR AFFILIATION

YUHAS~G.P.

Region 5, Ofc of the Director

RECZP.NAME

RECIPIENT AFFILIATION

SHIFFER,J.D.

Pacific Gas

a, Electric Co.

R

SUBJECT:

Forwards Insp Repts

50-275/89-18

6 50-323/89-18

on 890619-23

& 0710-14.Violation noted.

DISTRIBUTION CODE:

IE35D

COPIES

RECEIVED:LTR J

ENCL

t

SIZE:

Q

TITLE: Emergency'Preparedness-Appraisal/Confirmatory

Action Ltr Exercise

Rep

S

NOTES:

RECIPIENT

ZD CODE/NAME

PD5

PD

COPIES

RECIPIENT

LTTR ENCL

ID CODE/NAME

1

1

..ROODiH

COPIES

LTTR ENCL

1

1

INTERNAL: AEOD/DOA/IRB

NRR/PMAS/ZLRB12

OC/LFMB

RGN5

FILE

01

EXTERNAL: LPDR

NSIC

1

1

1

1

1

0

1

1

1,

1

1

1

NRR/DREP/EPB

10

NUBgGS=

TRACT

REG FILE

02

RGN2

DR

S

EPRPB

NRC PDR

1

1

1

1

1

1

1

1

1

1

R

NCTE 'ZO ALL "RZDSn RECIPZENIS

PIZASE HELP US 'ZO REDOCE HASTE!

CGNXACT %HE DCjCUMKZ CKÃIBOL DESK,

RXN Pl-37

(EXT. 20079)

KO EZiQGMTE YOUR KAME HKH DISTRIBUTION

LISTS FOR DOCX262GS YOU DGN~T NEED<

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

13

-. ENCL

12

Docket Nos. 50-275

and 323

Pacific

Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California 94106

Attention:

Mr. J.

D. Shiffer, Vice President

Nuclear

Power Generation

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units

1 and

2

This refers to the routine inspection

conducted

by Mr. H. S. North of this

office on June

19-23

and July 10-14,

1989, of activities authorized

by

NRC

License

Nos.

DPR-80 and

DPR-82 and to the discussion of our findings held by

Mr. North with Mr. J.

D. Townsend

and other members of your staff at the

conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

personnel,

and observations

by the inspector.

One violation of NRC requirements

was identified within the scope of this

inspection.

The violation's not being cited because

the criteria specified

in Section

V. G. of the Enforcement Policy were satisfied.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely

L L-01, i'Lt~L- c'i', i~:.d-

G.

P. Yeas, Chief,/

Emergency

Preparedness

and

Radiological Protection

Branch

Enclosure:

Inspection Report

No. 50-275/89-18

and 50-323/89-18

cc w/enclosure:

S.

M. Skidmore,

PG&E

J.

D.. Townsend,

PG&E

R.

F. Locke,

PG&E

D. Taggart,

PG&E

T. L. Grebel,

PG&E

State of California

bcc w/enclosure:

Project Inspector

Resident

Inspector

docket file

R. Nease,

NRR

B. Faulkenberry

J. Martin

G.

Cook

bcc w/o enclosure:

J. Zollicoffer

M. Smith

8908150073

890726

PDR

ADQCK 05000275

G

PNU

JUL 26 ical

REGION

V

HNorth

7/z $89

7/2.tp/89

GYuhas

7/26/89

REQU

S

PY

REQUEST

COPY

UES

C

PY

YES /

NO

YES /

NO

YE

NO

ES /

NO