~ gyp RE+pi c"
wp
+0 O~
Cy
)
~)
IlA 4'
g
'+
~+*<<"
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596 December 13, 1989 NOTICE OF SIGNIFICANT MEETING Name of Licensee:
Pacific Gas and Electric Company Name of Facility:
Docket Nos.:
Diablo Canyon 50-275 and 50-323 Enforcement Action Nos:
89-240 and 89-241 Date and Time of Meeting:
Location of Meeti'ng:
Purpose of Meeting:
NRC Attendees:
Licensee Attendees December 19, 1989, 9:00 a.m.
Region V Office, Walnut Creek, California Enforcement Conference Related to Containment Recirculation Sump Cleanliness and Design Deficiencies
{EA 89-241),
and Unlicensed Shift Supervisor
{EA 89-240)
B. H. Faulkenberry, Deputy Regional Administrator A. E. Chaffee, Deputy Director, Division of Reactor Safety and Projects L. F. Miller, Jr., Chief, Reactor Operations Section N. M. Nendonca, Chief, Reactor Projects,Section I M. B. Blume, Regional Attorney A. D. Johnson, Enforcement Officer P.
P. Narbut, Senior Resident Inspector, Diablo Canyon H. Rood, Project Manager, NRR K. E. Perkins, Jr.,
NRR W. M. Troskoski, OE G. A. Maneatis, President J.
D. Shiffer, Vice President, Nuclear Power Generation J.
D. Townsend, Plant Manager J. A. Sexton, Acting Manager, Ouality Assurance D. B. Niklush, Assistant Plant Manager, Operations M. J. Angus, Assistant Plant Manager, Technical J.
Hoch, Manager, Safety Assessment and Regulatory Affairs
, B. S. Lew, Director, Nuclear Regulatory Affairs R. 0. Anderson,
- Manager, NECS E.
C. Connell, Project Engineer T. L. Grebel, Supervisor, Regulatory Compliance SW122i006 0500027<
g 891213 pgOCK pDC
NOTE:
Attendance at this meeting by NRC personnel other than those listed above should be made known by COB December 15, 1989 via a telephone call to M. M. Mendonca, FTS 463-3720.
Approved by:
/
R. P. Zi man, Director Division of Reactor Safety and Projects Distribution:
NRC Attendees Listed Above J.
M. Taylor, EDO H. Thompson, DEDS T. E. Murley, NRR J.
B. Martin, RV J. Lieberman, OE J. Partlow, NRR G. Holahan, NRR J.
AGENDA ENFORCEMENT CONFERENCE WITH PACIFIC GAS AND FLECTRIC DECEMBER 19, 1989, 9 A.M. AT THE REGION V CONFERENCE ROOM NRC Opening Remarks PGKE Opening Remarks Overview of Technical Concerns Synopsis of NRC Inspection Findings-.
on Containment Sump Cleanliness and Design Deficiencies PGdtAE's Evaluation of Containment Sump Issues Synopsis of NRC Inspection Findings on Unlicensed Shift Supervisor PGIIE's Evaluation of Unlicensed Shift Super visor Enforcement Policy Discussion PG8E Conclusions NRC Summary Mr. Faul kenberry Mr. Maneatis Mr. Mendonca Mr. Narbut Mr. Shiffer Mr. Miller Mr. Shiffer Mr. Johnson Mr. Maneatis Mr. Faulkenberry
P