Text
ACCELERATED
D1SIRIBUTION
DEMONSTRA.TlON
SYSTEM
fj I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
3,'CCESSION
NBR:8912200139
DOC.DATE: 89/12/01
NOTARIZED: NO
DOCKET
CIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
CHAFFEE,A.E.
Region
5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SHIFFER,J.D.
Pacific Gas
6 Electric Co.
k
SUBJECT:
Forwards
Insp Repts
50-275/89-23
& 50-323/89-23
on
890910-1028
6
1120
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
i
ENCL
t
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation= Response
NOTES:
D
S
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
AEOD/DEIIB
DEDRO
NRR/DET/DIR 8H3
NRR/DOEA DIR 11
NRR/DREP/PRPB11
NRR/DST/DIR 8E2
NUDOCS-ABSTRACT
OGC/HDS2
RES MORISSEAUiD
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
ROODgH
AEOD/TPAD
NRR SHANKMANiS
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9D
NRR/DRIS/DIR
NRR/PMAS/ILRB12
OE L
RMAN,J
ILE
02
FILE
01
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
h
D
D
S
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
27
ENCL
27
~
'
Docket Nos.
50-275
and 50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Yice President
Nuclear
Power Generation
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units 1 and
2
This refers to the routine inspection
conducted
by Messrs.,
P.
P.
Narbut and
K.
E. Johnston
during the period, of September
10 through October 28, 1989,
and
November 20,
1989.
This inspection
examined your activities
as authorized
by
NRC License
Nos.
DPR-80 and
At the conclusion of the inspection,
discussions
of their findings were held with Mr. J.
D. Townsend,
and other
members of your staff.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
In the course of this inspection,
a number of examples
of management
oversight
concerns
were observed.
The examples
are listed in the "Results" section of
the report and discussed
in greater detail in the report body.
Two findings
highlight our concerns:
o
In an amendment
request to extend the allowed o'utage
time of the swing
diesel,
you provided erroneous
information about the ability to crosstie
diesel
generators
between units.
Plant personnel
discovered
the error
following the issuance, of the amendment,
at the
commencement
of the seven
.day swing diesel
outage.
On October 26, the inspector
found that numerous
maintenance
personnel
had been allowed to work more than
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a seven
day period without
the approval
or knowledge of plant management.
Additionally, following a
commitment to review the implementation of overtime limits, plant
management
failed to take aggressive
action, resulting in other
departments
exceeding
overtime limits.
These findings and others
described
in the report reenforce
a need for more
aggressive
and timely management
attention to problems.
8912200139
89i201
ADOCI( 05000~75
Q
pNu
+~/
~
'
PCS -
~
198S
Based
on the results of this inspection, it appears
that
some of your
activities were not conducted
in full compliance with NRC requirements,
as set
forth in the Notice of Violation enclosed
herewith
as Appendix A.
Your
response
to this notice is to be submitted in accordance
with the provisions
of 10 CFR 2'01,
as stated in Appendix A, Notice of Violation.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room.'he
responses
directed
by this letter are not subject to the clearance
procedures
of the Office of Management
and Budget as required
by the Paperwork
Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
gii]c Aa(gi'
A.
E.
6
ffee, Actin
Chief
Reactor Projects
Branch
Division of Reactor Safety
and Projects
Enclosures:
Appendix A, Notice of Violation
Inspection
Report
Nos.
50-275/89-23
and 50-323/89-23
cc w/enclosures:
S.
D. Skidmore,
PG8;E
R.
F.
Locke,
PGRE
J.
D. Townsend,
PG8;E (Diablo Canyon)
D.
A. Taggert,
PG8E (Diablo Canyon)
T.
L. Grebel,
PGEE (Diablo Canyon)
State of California
Sandra Silver (Report Only)
bcc w/enclosures:
Resident
Inspector
Project Inspector
docket file
G.
Cook
B. Faulkenberry
J. Martin
R.
Nease
bcc w/o enclosures:
M. Smith
J. Zollicoffer
N. Mestern
~
'
-3-
REGION V ~~
KJohnston
PNarbut
~( /sg
Ilpi /sg
MMendonca
P/ f /89
MB1ume
l$4g'/Sg
AChaffee
?Ll) /89
ES /
NO
NO
] YES /
NO
] YES /
NO
] YES /
0
]
YES
NO
]