Informs of Evaluation of Util 890807 Response to NRC 890727 Request for 10CFR50.54(f) Info Re Vendor Audits.Plans & Actions to Resolve Situation Will Be Examined During Future Insps
ML16341F298
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/24/1989
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8908300286
Download: ML16341F298 (4)


Text

f.o.a RINGO (4

P p

0 pO I

/p pN

++**+

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596

~

August 24, 1989 Docket Nos.

50'-275, 50-323 Pacific Gas and Electr.ic Company 77 Beale Street, Room 1451 San Francisco, California 94106 Attention:

Mr. J.

D., Shiffer, Vice President Nuclear Power Generation Gentlemen:

SUBJECT:

EVAI.UATION OF

RESPONSE

TO REQUEST FOR 10 CFR 50.54(f)

INFORMATION By letter dated July 27,

1989, the NRC requested certain information regarding PGSE's activities associated with vendor audits.

The purpose of this letter is to inform you of our evaluation of your response contained in letter number DCL-89-207, dated August 7, 1989.

The NRC questions regarding your submittal are detailed below.

Your JCO 89-18, page 4 of 12, references JCO 88-07 as containing the justification for continued operation of inadequately heat treated ASW pump impellers with commercial grade parts.'lease provide JCO 88-07 for our review.

2.

4.

Your JCO 89-18, page 7 of 12, paragraph C, lacks sufficient detail to allow a completion of our assessment.

For example, you say that Barton testing results in loadings which are more severe than those experienced during normal operation without providing any statement as to whether the tested loadings envelope all design accident and transient conditions.

Please provide this additional detail.

Your JCO 89-18, page 9 of 12, identifies that Dresser, Industries supplied you with certain non-pressure retaining material, for use in safety-related applications, which was purchased commercial grade.

We note that you do not indicate whether this situation applies to other Dresser supplied non-pressure retaining material in addition to that identified in your JCO.

Please identify what other non-pressure retaining material was purchased from Dresser Industries and whether a boundary can be established on the time frame when Dresser was supplying such commercial grade parts for safety-related applications.

Your JCO 89-18, page I of Attachment I, states that the basis.for acceptability for 21 vendors was a review of contractor generated audit reports.

Based on problems not identified by contractor audits at Sultzer-Bingham and PSA, what is the basis for having any confidence that a review of the audit reports would detect inadequacies in the vendors'A program?

ggOp~~002~~,6 Sr/0824 pDp

/)DOCK (I5()()t.)27 P

PDC

w)

Your plans and actions to resolve this situation >rill be examined during future inspections.

Additional questions regarding your response to our request may result from those inspections.

Please submit the above requested information by August 28, 1989.

Thank you for your cooperation in this matter.

Sincerely, bcc; LI. Brach, VIB E. Baker, VIB D. Kirsch, RV R. Huey, RV J.

B. Martin Regional Administrator gE,he C.O EBaker/JIB DKirsch 8/ (0/89 8//()/89

,Y/;

AChaffee 'Zi mer n

MBlume 84(/89

. 8/

8 8/g,g/89 R

S CP.

R US C

S C

REU YES NO YES /

NO ES NO YES /

NO AJo nson MMendoncai JBMa tin 8)P'/89 8(i</89 8/~489 REQUEST C

PY EST COPY j REQUEST Y

YES /

NO YES ) /

NO 1

YES

/i NO YES / / NOr TO PDR YES /

NO

Ir If