Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17208A747 + (21:15:29, 8 January 2025)
- ML17208A746 + (21:15:29, 8 January 2025)
- L-80-197, Application for Amend to App a of License DPR-67,modifying Definition of Operability & Applicability of Limiting Conditions for Operation to Coincide W/Words in STS Per NRC + (21:15:30, 8 January 2025)
- L-80-178, Responds to IE Bulletin 80-05.Existing Measures for Vacuum Protection Are Adequate & No Further Mods Are Required + (21:15:38, 8 January 2025)
- L-80-179, Forwards Response to IE Bulletin 80-12.Failure of Any Single Active Component During Decay Heat Removal Sys Operation Will Not Result in Loss of Cooling + (21:15:40, 8 January 2025)
- L-80-194, Forwards Safeguards Contingency Plan,Revision 1,in Response to NRC 800418 Request for Addl Info.Revision Withheld (Ref 10CFR2.790) + (21:15:42, 8 January 2025)
- ML17208A737 + (21:15:44, 8 January 2025)
- L-80-175, Discusses Main Steam Line Break Analysis.Results Show That Peak Containment Pressure Is Not Influenced by Assumed Addition of Auxiliary Feedwater Ruptured Steam Generator. Forwards Assumptions Used in Analysis + (21:15:45, 8 January 2025)
- L-80-192, Forwards Parts a & B of Info Requested in Reg Guide 9.2.Info Consists of Sec Prospectus,Annual Rept,Rate Schedules, Interchange Agreements,Spinning & Installed Reserve Info & Maint Schedules.Info Available in Central Files + (21:15:47, 8 January 2025)
- 05000335/LER-1980-023, Forwards LER 80-023/03L-0 + (21:15:49, 8 January 2025)
- 05000335/LER-1980-024-03, /03L-0:on 800516,while Shut Down for Refueling, Periodic Test of Engineered Safety Features Showed 10 Diesel Generators Load Sequence Timers Were Out of Tolerance.Caused by Setpoint Drift.Maladjusted Relays Caused Other Prob + (21:15:51, 8 January 2025)
- 05000335/LER-1980-024, Forwards LER 80-024/03L-0 + (21:15:53, 8 January 2025)
- IR 05000335/1980008 + (21:15:54, 8 January 2025)
- ML17208A726 + (21:15:56, 8 January 2025)
- L-80-152, Responds to NRC Re Violations Noted in IE Insp Rept 50-335/80-08.Corrective Actions:Interim Measures Taken to Supply Audible Flux Count to Refueling Area + (21:15:57, 8 January 2025)
- ML17208A725 + (21:15:57, 8 January 2025)
- ML17208A722 + (21:15:59, 8 January 2025)
- L-80-176, Forwards Security Plan,Revision 2. Plan Withheld (Ref 10CFR2.790) + (21:16:00, 8 January 2025)
- L-80-184, Forwards Info Re TMI-related Requirements,In Response to NRC + (21:16:03, 8 January 2025)
- ML17208A718 + (21:16:03, 8 January 2025)
- IR 05000389/1980004 + (21:16:06, 8 January 2025)
- ML17208A713 + (21:16:08, 8 January 2025)
- 05000335/LER-1980-019-03, /03L-0:on 800501,during Normal Refueling Operations,Leak Check of Personnel Air Lock Indicated Leakage in Excess of Tech Specs.Caused by Defective Air Lock Handwheel Shaft Packing Gland.Packing Glands Adjusted + (21:16:09, 8 January 2025)
- 05000335/LER-1980-019, Forwards LER 80-019/03L-0 + (21:16:11, 8 January 2025)
- 05000335/LER-1980-020, Forwards LER 80-020/03L-0 + (21:16:12, 8 January 2025)
- 05000335/LER-1980-021, Forwards LER 80-021/03L-0 + (21:16:14, 8 January 2025)
- ML17208A701 + (21:16:16, 8 January 2025)
- ML17208A703 + (21:16:16, 8 January 2025)
- ML17208A700 + (21:16:17, 8 January 2025)
- L-80-187, Forwards Application to Amend CPPR-144,transferring Partial Ownership of Facility & Site to City of Orlando,Fl & Orlando Utils Commission.Info for Antitrust Review Also Encl + (21:16:18, 8 January 2025)
- PNO-II-80-104, on 800611,unit Experienced Loss of Componet Cooling Water to Reactor Coolant Pumps.Caused by Control Solenoid Failure on Isolation Valves.Cooling Water Restored. Investigation Underway.Press Release Will Be Issued + (21:16:21, 8 January 2025)
- ML17208A695 + (21:16:22, 8 January 2025)
- IR 05000335/1980009 + (21:16:23, 8 January 2025)
- ML17208A690 + (21:16:24, 8 January 2025)
- ML17208A687 + (21:16:26, 8 January 2025)
- ML17208A686 + (21:16:27, 8 January 2025)
- L-80-160, Forwards Five C-E Repts Re Code for Calculating PWR Scram Activities,Control Element Assembly Group Withdrawal & three-part Rept for Statistical Combination for Uncertainties.Proprietary Version Withheld (Ref 10CFR2.790) + (21:16:28, 8 January 2025)
- IR 05000389/1980003 + (21:16:31, 8 January 2025)
- ML17208A678 + (21:16:32, 8 January 2025)
- L-80-159, Advises That Vendor Analyses Supporting Proposed Mod to Automatic Initiation of Auxiliary Feedwater Sys Flow Will Be Delayed.Submittal Expected by 800620.Operational Date Will Coincide W/Safety Analysis Transmittal + (21:16:34, 8 January 2025)
- ML17208A677 + (21:16:34, 8 January 2025)
- ML17208A674 + (21:16:37, 8 January 2025)
- 05000335/LER-1980-027, Forwards LER 80-027/09T-0 + (21:16:41, 8 January 2025)
- ML17208A671 + (21:16:43, 8 January 2025)
- ML17208A670 + (21:16:44, 8 January 2025)
- L-80-145, Forwards Response to IE Bulletin 80-04 Re Analysis of PWR Main Steam Line Break.Review of FSAR Analysis Shows Potential for Containment Pressurization Addressed Impact of Addl Flow from Auxiliary or Main Feedwater Sys + (21:16:49, 8 January 2025)
- ML17208A667 + (21:16:49, 8 January 2025)
- ML17208A665 + (21:16:51, 8 January 2025)
- ML17208A662 + (21:16:52, 8 January 2025)
- ML17208A661 + (21:16:52, 8 January 2025)
- IR 05000335/1980005 + (21:16:54, 8 January 2025)
- ML17208A653 + (21:16:56, 8 January 2025)