Forwards IE Insp Rept 50-389/80-03 on 800402-04.No Noncompliance Noted
ML17208A678
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/25/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17208A679 List:
References
NUDOCS 8006050423
Download: ML17208A678 (3)


See also: IR 05000389/1980003

Text

~8 AEOI

~4

~o

Op

i+

sQ

gO

++*++

In Reply Refer To:

RII:RDB

50-389/80-03

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

PII P 5 )980

~c -APP

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers

to the inspection

conducted

by R. D. Bradley of this office on

April 2 through 4,

1980 of activities authorized by NRC Construction Permit No.

CPPR-144 for the St. Iucie facility, and to the discussion of our findings held

with B. J. Escue at the conclusion of the inspection.

'

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have

examined

actions

you have

taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title

10, Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any such application must

include

a full statement

of the reasons

on the basis of which it is claimed that

the information is proprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

t

Enclosure:

See

Page

2

8006050't~~ +

C. E. Murphy, Chief

Reactor Construction

and Engineering

Support Branch

Florida Power and Light Company

ApR 3Q 1~80

Enclosure:

Inspection Report No. 50-389/80-03

cc w/encl:

C-. M. Wethy, Plant Manager

P. 0.

Box 128

Ft. Pierce,

FL

33450

Nat Weems, Assistant

QA Manager

P. 0.

Box 128

Ft. Pierce,

FL

33450