Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17208A893 + (21:13:29, 8 January 2025)
- ML17208A892 + (21:13:30, 8 January 2025)
- ML17208A890 + (21:13:31, 8 January 2025)
- ML17208A888 + (21:13:32, 8 January 2025)
- ML17208A887 + (21:13:33, 8 January 2025)
- ML17208A885 + (21:13:34, 8 January 2025)
- L-80-236, Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe. Pipe Is Not Used or Planned for Use in safety-related Sys + (21:13:35, 8 January 2025)
- L-80-233, Forwards Response to IE Bulletin 80-11, Masonry Wall Design. Identification of safety-related & nonsafety- Related Components Attached to or in Close Proximity to Masonry Walls Will Be Completed by 801001 + (21:13:37, 8 January 2025)
- ML17208A881 + (21:13:38, 8 January 2025)
- ML17208A879 + (21:13:39, 8 January 2025)
- IR 05000389/1980007 + (21:13:41, 8 January 2025)
- ML17208A874 + (21:13:43, 8 January 2025)
- ML17208A873 + (21:13:44, 8 January 2025)
- ML17208A869 + (21:13:44, 8 January 2025)
- ML17208A868 + (21:13:45, 8 January 2025)
- IR 05000389/1980005 + (21:13:47, 8 January 2025)
- ML17208A866 + (21:13:48, 8 January 2025)
- ML17208A864 + (21:13:49, 8 January 2025)
- ML17208A862 + (21:13:50, 8 January 2025)
- ML17208A861 + (21:13:51, 8 January 2025)
- IR 05000335/1980015 + (21:13:53, 8 January 2025)
- ML17208A855 + (21:13:54, 8 January 2025)
- ML17208A854 + (21:13:56, 8 January 2025)
- ML17208A853 + (21:13:57, 8 January 2025)
- ML17208A852 + (21:13:58, 8 January 2025)
- L-80-215, Forwards Response to IE Bulletin 80-08, Exam of Containment Liner Penetration Welds. Containment Boundary Butt Welds Identified.Field Welds Were Made During Const.Shop Welds Were Made by Penetration Assembly Fabricator + (21:13:59, 8 January 2025)
- L-80-219, Responds to IE Bulletin 80-10, Contamination of Nonradioactive Sys & Resulting Potential for Unmonitored, Uncontrolled Release of Radioactivity to Environ. No Addl Routine Sampling or Monitoring Programs Are Required + (21:14:00, 8 January 2025)
- RS-17-111, Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies + (21:14:03, 8 January 2025)
- ML17208A844 + (21:14:05, 8 January 2025)
- ML17208A843 + (21:14:06, 8 January 2025)
- ML17208A842 + (21:14:08, 8 January 2025)
- L-80-224, Responds to IE Bulletin 80-11, Masonry Wall Design. Info Is Incomplete Due to Identification Work Still in Progress. Safety-related Walls Have Been Identified & Evaluation Program Developed.Rept Will Be Provided by 800723 + (21:14:10, 8 January 2025)
- ML17208A841 + (21:14:10, 8 January 2025)
- L-80-222, Advises That Henry Pratt Co Torque & Stress Analyses Re Containment Purge Have Been Delayed.Upon Completion & Receipt of Analyses,Util Will Review & Prepare Response Demonstrating Valve Ability to Close During DBA-LOCA + (21:14:15, 8 January 2025)
- ML17208A836 + (21:14:18, 8 January 2025)
- ML17208A835 + (21:14:19, 8 January 2025)
- L-80-182, Responds to NRC Re Violations Noted in IE Insp Rept 50-335/80-07.Corrective Actions:Procedures Will Be Changed to Require Signatures for Disconnected Lead & Temporary Jumper Log Reviews + (21:14:21, 8 January 2025)
- ML17208A834 + (21:14:21, 8 January 2025)
- L-80-214, Provides Interim Response to IE Bulletin 80-08, Examination of Containment Liner Penetration Welds. Facility Utilizes Flued Head Design Penetration Connections.Records Under Review.Tables Encl + (21:14:24, 8 January 2025)
- ML17208A831 + (21:14:24, 8 January 2025)
- IR 05000335/1980014 + (21:14:27, 8 January 2025)
- ML17208A822 + (21:14:29, 8 January 2025)
- L-80-181, Responds to NRC Re Violation Noted in IE Insp Rept 50-335/80-14.Corrective Actions:Ler Being Prepared to Report Results of Integrated Test of Engineered Safety Features + (21:14:30, 8 January 2025)
- ML17208A821 + (21:14:30, 8 January 2025)
- ML17208A818 + (21:14:32, 8 January 2025)
- L-80-190, Advises That Final Deficiency Rept Re Diesel Generator Control Panels Will Be Delayed Until 800731 + (21:14:33, 8 January 2025)
- 05000335/LER-1980-030, Forwards LER 80-030/03L-0 + (21:14:35, 8 January 2025)
- 05000335/LER-1980-025, Forwards LER 80-025/09X-1 + (21:14:37, 8 January 2025)
- 05000335/LER-1980-026-03, /03L-0:on 800530,during Normal Power Operations, Noted That 31-day Fire Station Insp Required by Tech Spec Had Been Exceeded.Caused by Personnel Inadvertently Overlooking Insp + (21:14:39, 8 January 2025)
- 05000335/LER-1980-026, Forwards LER 80-026/03L-0 + (21:14:41, 8 January 2025)
- 05000335/LER-1980-028, Forwards LER 80-028/03L-0 + (21:14:42, 8 January 2025)