Forwards IE Insp Rept 50-389/80-07 on 800604-06.No Noncompliance Noted
ML17208A874
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/01/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17208A875 List:
References
NUDOCS 8008070410
Download: ML17208A874 (3)


See also: IR 05000389/1980007

Text

~R REao

~4

"o

Vl0

+o ++*++

In Reply Refer To:

RII:CRM

50-389/80-07

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUL 04 Is80

Qo-SV

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers to the inspection

conducted

by C.

R. McFarland of this office on

June

4 through 6,

1980 of activities authorized

by NRC Construction Permit No.

CPPR-144 for the St. Iucie facility, and to the discussion of our findings held

with J.

A. Thompson at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have

examined actions

you have taken with regard to previously reported unre-

solved items.

The status of these items is discussed in the enclosed report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title

10,

Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information

from public disclosure.

Any such application

must

include

a full statement of the reasons

on the basis of which it is claimed that

the information is proprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Reactor Construction

and Eng neering

Support Branch

Enclosure:

See

Page

2

80<<oroq~~

Florida Power and Light Company

-2-

JUL O1 1980

Enclosure:

Inspection Report No. 50-389/80-07