ML17208A831

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-335/80-07
ML17208A831
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/27/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17208A832 List:
References
RII:GAB, NUDOCS 8007220059
Download: ML17208A831 (2)


See also: IR 05000335/1980007

Text

~$ BEQII~

~8

n

C

O

CO

O~

Yg+~

~0

+a*++

.n Reply Refer To:

II:GAB

50-335/80-07

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUN 8

'7 1980

~O

-&S'lorida

Power

and Light Company

Attn:

,R.

E. Uhrig, Vice President

Advanced

Systems

and Technology

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to your letter of June

12, 1980, informing us of steps

you

have taken to correct the items of noncompliance

concerning activities

under

NRC License

No. DPR-67, brought to your attention in our letter

of May 18,

1980.

We will examine your corrective actions

and plans

during subsequent

inspections.

With regard to Item A, we have reviewed your

comments

concerning

our

classification of this item as

an infraction.

We agree with you that

jumper reviews are conducted

by other personnel

at the time of instal-

lation.

However,

we do not agree that .the review by the

I8C Supervisor

and the Assistant Superintendent

Electrical Maintenance,

required

by

your procedure prior to an outage,

is strictly administrative.

Our

reevaluation

of this matter concludes

that. the, classification of the

noncompliance

is. marginal; accordingly,- we have lowered the classification

of this item of noncompliance

from an infraction to

a deficiency.

A

major factor in this reevaluation

was the other. periodic reviews being

performed

as required

by your controlling procedure.

Should you have any questi.ons

concerning this letter,

we would be pleased

to discuss this matter further.

Sincer ely,

cc:

C. M. Wethy, Plant Manager

N. Weems, Assistant

gA Manager

E.'c,

R. C; Lewis, Acting Chief

Reactor Operations

and Nuclear

Support Branch

,800V28005$

.

)