ML17208A821

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-335/80-14 on 800430-0502 & Notice of Violation
ML17208A821
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/16/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17208A819 List:
References
NUDOCS 8007160817
Download: ML17208A821 (2)


See also: IR 05000335/1980014

Text

~S REOO

+4

~o

0

A0

l~

C

O

0V

In Reply Refer To:

RII:BRM

50-335/80-14

UNITEDSTATES

NUCLEAR REGULATORYCOMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

MAY1 6 1980

Florida Power

and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers to the inspection

conducted

by B. R. Messitt of this office on

April 30 through May 2,

1980 of activities authorized by NRC License No. DPR-67

for the St. Lucie facility, and to the discussion of our findings held with

C.

M. Wethy at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements

are listed in the Notice of Violation enclosed

here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10,

Code of Federal

Regulations.

Section 2.201 requires

you to submit to this office, within 20

days of your receipt of this notice,

a written statement

or explanation in reply

including:

(1) corrective steps

which have been taken by you and the results

achieved;

(2) corrective steps

which will be taken to avoid further noncompli-

ance;

and (3) the date

when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include

a full statement of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document.

If we do not hear from you in this regard within

the specified period,

the report will be placed in the Public&ocument Room.

It

S'

S00VXOO 8 7

Florida Power and Light Company

MAY1 6 1980

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Z.c.

R.

C.

ewis, Acting Chief

Reactor Operations

and

Nuclear Support Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-335/80-14

cc w/encl:

C.

M. Wethy, Plant Manager

P. 0.

Box l28

Ft. Pierce,

FL

33450

Nat Weems, Assistant

QA Manager

~

~

~

P. 0. Box 128

Ft. Pierce,

FL

33450