- ML17216A579 + (20:06:48, 8 January 2025)
- L-86-219, Responds to Violations Noted in Insp Rept 50-335/86-01. Corrective Actions:All Sludge Lancing Operations Suspended Pending Results of Exposure Investigation & Personnel TLD Readings & No Exposures in Excess of Limits Noted + (20:06:49, 8 January 2025)
- L-86-239, Forwards marked-up Regulatory Info Tracking Sys for Implementation of Generic Items,Per Request.Completed Listing,W/Status of All Actions Identified,Will Be Provided by 860515 + (20:06:51, 8 January 2025)
- L-86-231, Submits Requested Info Re Program for Providing Engineering Expertise on Shift,Per Generic Ltr 86-04.Program Consistent w/851028 Commission Policy Statement & NUREG-0737,Item I.A.1.1 Criteria.No Changes Planned + (20:06:52, 8 January 2025)
- ML17216A571 + (20:06:54, 8 January 2025)
- EPID:L-2016-LLA-0011 + (20:06:55, 8 January 2025)
- ML17216A570 + (20:06:55, 8 January 2025)
- L-86-227, Application for Amend to License DPR-67,temporarily Modifying Plugging Limit Requirements Per Tech Spec 4.4.5.4.a.6 to Permit Power Operation W/Some Steam Generator Tubes Exceeding Plugging Limit.Fee Paid + (20:06:56, 8 January 2025)
- ML17216A567 + (20:06:59, 8 January 2025)
- L-86-218, Requests NRC Approval to Use ASME Boiler & Pressure Vessel Code Case N-416, Alternative Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping, to Satisfy Requirements of ASME Code,Section XI,IWA-4400.Fee Paid + (20:07:00, 8 January 2025)
- ML17216A565 + (20:07:00, 8 January 2025)
- ML17216A562 + (20:07:03, 8 January 2025)
- ML17216A560 + (20:07:04, 8 January 2025)
- L-86-192, Special Rept:On 860312,alarm Received Indicating That Diesel Engine Failed to Start.Caused by Insufficient Torqued Nut. on 860326,diesel Generator Tripped on High Crankcase Pressure.Caused by Oil Splashing on Pressure Switch + (20:07:07, 8 January 2025)
- ML17216A552 + (20:07:10, 8 January 2025)
- ML17216A550 + (20:07:11, 8 January 2025)
- ML17216A549 + (20:07:12, 8 January 2025)
- ML17216A548 + (20:07:13, 8 January 2025)
- ML17216A546 + (20:07:15, 8 January 2025)
- ML17216A544 + (20:07:16, 8 January 2025)
- ML17216A543 + (20:07:17, 8 January 2025)
- L-86-200, Forwards Responses to NRC Questions Re 860402 Application for Amend to License DPR-67,revising Tech Spec Limits on Linear Heat Rate + (20:07:18, 8 January 2025)
- L-86-189, Revised Application for Amend to License NPF-16,authorizing Changes in Diesel Generator Tech Specs in Response to Generic Ltr 84-15.Revised Specs Eliminate Inconsistencies W/ North Anna Unit 2 STS for Diesel Generators,Per NRC Request + (20:07:20, 8 January 2025)
- ML17216A538 + (20:07:20, 8 January 2025)
- ML17216A535 + (20:07:22, 8 January 2025)
- ML17216A528 + (20:07:23, 8 January 2025)
- L-86-181, Forwards Final Core Support Barrel Insp Rept,Post-Cycle 6. Condition of Core Support Barrel Same as Found During post- Cycle 5 Insp.Barrel Acceptable for long-term Svc + (20:07:24, 8 January 2025)
- ML17216A524 + (20:07:26, 8 January 2025)
- ML17216A522 + (20:07:27, 8 January 2025)
- ML17216A518 + (20:07:28, 8 January 2025)
- ML17216A517 + (20:07:29, 8 January 2025)
- ML17216A514 + (20:07:30, 8 January 2025)
- ML17216A513 + (20:07:31, 8 January 2025)
- ML17216A511 + (20:07:32, 8 January 2025)
- ML17216A510 + (20:07:33, 8 January 2025)
- L-86-188, Forwards Owner Data Rept for Inservice Insp (Form NIS-1), Submitted in Accordance W/Asme Code.Owner Data Rept of Repairs or Replacement (Form NIS-2) Also Encl + (20:07:34, 8 January 2025)
- L-86-173, Application to Amend License NPF-16,deleting License Condition 2.C.19 to Permit Discharge of Fuel at End of Cycle 3 Operation Above Listed Limits.Approval Requested by 870501.Justification Encl + (20:07:36, 8 January 2025)
- ML17216A505 + (20:07:36, 8 January 2025)
- ML17216A502 + (20:07:39, 8 January 2025)
- ML17216A500 + (20:07:40, 8 January 2025)
- TAC:60663 + (20:07:41, 8 January 2025)
- ML17216A498 + (20:07:42, 8 January 2025)
- IR 05000250/1986014 + (20:07:44, 8 January 2025)
- ML17216A493 + (20:07:45, 8 January 2025)
- TAC:53153 + (20:07:46, 8 January 2025)
- L-86-166, Confirms Procedure Requirement for Measuring Undervoltage Trip Device roller-rivet Clearance,Per 860310 SER Re Generic Ltr 83-28.Insulation Resistance Not Useful Parameter to Review Breaker Degradation + (20:07:47, 8 January 2025)
- L-86-162, Forwards Addl Info Re Mods Required to Support Bypass Flow Measurements of Certain Pumps.Extension of Interim Relief from Parts of ASME Section XI Requested for Duration of Cycle 3 + (20:07:49, 8 January 2025)
- L-86-148, Informs of Plans to Implement Control Rod Group Exchange Technique at Facility After Next Refueling Currently Scheduled for Apr-May 1986 Time Frame.Change in Methodology Reduces Time to Measure Ref Group + (20:07:50, 8 January 2025)
- 05000389/LER-1986-006-01, :on 860312,both Emergency Diesel Generators Out of Svc.Caused by Damaged Idler Pulley Wheel & Loose Locknut in Friction Clutch Assembly.Generators Repaired & Remaining Generators Inspected + (20:07:53, 8 January 2025)
- L-86-149, Forwards Proprietary C-E Rept LOCA Axial Power Shape Study for St Lucie Unit 2, Per NRC Request for Refs Used in Licensee 860131 Large Break LOCA Analysis.Affidavit Encl. Rept Withheld (Ref 10CFR2.790) + (20:07:54, 8 January 2025)
- L-86-158, Documents 860327 Telcon Response Re Asymmetries in Steam Generator Tube Plugging in C-E Large Break LOCA Analysis,Per 860131 Submittal & 860310 Request for Approval + (20:07:56, 8 January 2025)