| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/28/1986 |
| From: | Tourigny E Office of Nuclear Reactor Regulation |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8605080536 | |
| Download: ML17216A524 (13) | |
Text
April 2g, 1 Docket Nos.
50-335 and 50-389 Mr.
C. 0.
Woody Group Vice President Nuclear Energy Florida Power 5 Light Company P.
0.
Box 14000 Juno Beach, Florida 33408 Distribution:
PWR ¹8 Files OELD JPartlow AThadani ocket Fi reu zer ACRS 10 BGrimes NRC 8 L PDRs ETourigny EJordan FMiraglia
Dear Mr. Woody:
The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions."
To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees'mplementation of approved regulatory improvements.
To assist me in developing this information for the St.
Lucie Plant, Units 1 and 2, please review the enclosed plant-specific lists, add omitted significant actions to the lists, and provide the dates that all aspects of each identified requirements were completed/implemented or are expected to be completed.
For each requirement that has been completed, enter "completed" under the Status column arid the date the item was completed.
For requirements that have not been completed/
implemented, provide the projected date and enter "projected" under the Status column.
I do not expect or want a major effort made to obtain precise dates.
- Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented.
For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time.
For projected completions/implementations in 1986, use month and year.
Use year only for projections thereafter.
Please provide a response in the form of a marked up listing by May 31, 1986.
In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.
This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.
Sincerely,
/S/
8b0508053b 8b0428 PDR ADOCK 05000335 P
Enclosures:
As stated E.
G. Tourigny, Project Manager PWR Project Directorate ¹8 Division of PWR Licensing-B cc w/enclosures:
See'ext page
, PWR¹8 PWR¹8
, 5Tourigny AThada i air'Wigg y t SS
f t-
Mr.
C. 0.
Woody Florida Power 8 Light Company St.
Lucie Plant CC:
Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector c/o U.S.
NRC 7585 S.
Hwy AlA Jensen
- Beach, Florida 33457 State Planning 8 Development Clearinghouse Office of Planning 8 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Harold F. Reis, Esq.
Newman 8 Holtzinger 1615 L Street, N.W.
Washington, DC 20036 Norman A. Coll, Esq.
McCarthy, Steel, Hector and Davis 14th Floor, First National Bank Building Miami, Florida 33131 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis, County Administrator St.
Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington - Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue
- Bethesda, Maryland 20814 Mr. Allan Schubert, Manager Public Health Physicist Department of Health and Rehabilitative Services 1323 Winewood Blvd.
Tallahassee, Florida 32301 Regional Administrator, Region II U.S.
Nuclear Regulatory Commission Executive Director for Operations 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323
R-1208731-001 REGULATORY INFORMATION TRACKING SYSTE' FACILITY IMPLEMENTATION PAGE NO.
459 03/3'1/86 FACILITY: ST LUCIE 1
PLANT LOCATION: 12 MI SE OF FT.
PIERCE>
FLA DOCKET NUMBER-050-00335 ARCH/ENGINEER:
EBASCO IE INSPECTOR:
R.
CRLENJAK LICENSED POWER:
2700 MWT DESIGN POWER:
0830 MWE NSSS VENDOR:
COMB PROJECT MANAGER: D.
SELLS BRANCH CHIEF:
A. THADANI LIC. ASSISTANT:
P.
KREUTZER TAC NO.
MPA TITLE M06726 A-01 10 CFR 50.55 A(G) ISI M07063 A-01 10 CFR 50.55 A(G) ISI M08155 A-02 APPENDIX I - ALARA M07064 A-03 SECURITY REVIEWS-MODIFIED AMENDMENT PLANS M11392 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE M1 0623 A-1 0 CONTINGENCY PLANNING M10619 A-11 GUARD TRAINING PLANS M10621 A-12 VITAL AREA ANALYSIS M08292 A-14 10CFR 50.55 A(G) INSERVICE TESTING LIC ACT COMPLETE 01/01/70C 02/01/78C 08/18/83C 02/28/79C 04/21/80C 09/18/80C 11/03/81C 00/16/82C 04/02/85C LICENSEE STATUS DATE M13096 A-15 QUALITY ASSURANCE REQUEST REGARDING DIESEL GENARAT 00/15/80C M 171 1 1 A
1 6 QUALIFICATIONS OF EXAMINATIONS INSPECTION p TESTING 1 2/1 6/81 C M51135 A-17 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDEN 05/15/86 M55742 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 12/06/85C M07251 M08171 B-07 B-08 STEAM GENERATOR FEEDWATER FLOW INSTABILITY PWR HPSI "LPSI FLOW RESISTANCE M59100 A-20 10 CFR 50.62 OPERATING REACTOR REVIEWS M59985 A-21 10 CFR 50.61'RESSURIZED THERMAL SHOCK RULE M06783 B-02 FIRE PROTECTION M10813 B-03 PWR MODERATOR DILUTION M06826 B-06 REACTOR VESSEL OVERPRESSURE PROTECTION 06/15/86 06/30/86 07/27/7 9C 02/26/79C 09/16/83C 02/07/80C 06/19/79C
7-1208731"001 ST LUCIE 1
REGULATORY INFORNATION TRACKING SYSTEM FACI L ITY IMP L ENENTATI ON (CONTINUATION)
PAGE NO.:
460 03/31/86 fAC NO.
NPA TITLE LIC ACT
~CONPLET lICENSEE
~SA7 US
~AT 111305 B-08 PWR HPSI-LPSI FLOW RESISTANCE 107841 B-09 CHARGING SYSTEHS PIPE VIBRATIONS
$08913 B-14 CEA GUIDE TUBE WEAR
'TI1 21 51 11 0421 B-16 B"17 EMERGENCY PLANNING AND REVISIONS TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS A146685 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 410315 B-20 CONTAINNENT LEAKAGE DUE TO SEAL DETERIORATION 06/19/79C 12/29/78C 07/06/81C 04/01/81C 02/04/81C 10/14/81C 02/04/81C
%10377 B-21 LOSS OF 125-V DC BUS VOLTAGE WITH LOSS OF ANNUNCIA 02/28/82C 110422 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 02/04/81C 846684 B-22 TECH SPEC SURVEILLANCE REQUIRENENTS FOR MECHANICAL 10/14/81C 810052 B-23 DEGRADED GRID VOLTAGE 05/03/83C
>142593 B"24 VENTING AND PURGING CONTAINHENTS WHILE AT FULL POW 05/27/83C
>110213 B-24 VENTING AND PURGING CONTAINNENTS WHILE AT FULL POW 01/01/70C 811307 810252 B"24 B-26 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW INADVERTANT SAFETY INJECTION DURING COOLDOWN 02/09/81C 03/1 7/81 C 808920 B-36 RESISTANCE TEMPERATURE DETECTOR (RTD)
RESPONSE
C 08/28/81C 807319 B-37 STEAN GENERATOR TUBE DENTING AND SUPPORT PLATE NOD 02/02/81C
>110809 B-39 PWR PRESSURE TEMPERATURE LIMIT TECH SPECS 11/13/80C 811108 B"41 FIRE PROTECTION FINAL TECH SPECS (INCLUDES SER S
07/11/84C N43852 B"41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S
02/21/85C N43853 B-41 FIRE PROTECTION FINAL TECH SPECS (INCLUDES SER S
02/21/85C N11731 B"42 TNI FOLLOW UP ALL PLANTS N11794 B-43 PWR FEEDWATER LINE CRACKS 01/1 9/81 C 01/04/80C
R-1208731-001 ST LUCIE 1
(CONTINUATION)
FACILITY IMPL EMENTATI ON REGULATORY INFORMATION TRACKING SYSTEM PAGE NO.:
461 03/31/86
~ C TAO NO HPA A
M%3152 B"43 PHR FEEDHATER LINE CRACKS M12366 B-04 LESSONS LEARNED IMPLEMENTATION LIC ACT COMPLETE 05/25/82C 06/02/80C LICENSEE STATUS
~DAT 412887 B"45 HASH 1400 EVENT Vp "PRIMARY COOLANT SYSTEM PRESSUR 00/20/81C M12600 B-ci6 ANALYSIS OF TURBINE DISC CRACKS 112729 B-07 ECCS'LAD SHELLING AND RUPTURE 08/28/81C 09/10/80C
'012739 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 09/02/82C M%3962 B-51 EVALUATION OF BULLETIN 79-06 AND 79-08 06/1 2/81 C M%3630 B-52 REVIEW OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI 00/06/81C M%2118 B-57 DHR CAPABILITY 4ll2900 B-59 MASONRY HALL DESIGN M%2692 B-60 ENVIRONMENTAL QUALIFICATION M42707 B-61 LOSS OF NON CLASS IE I&C PONER MCI2778 B-62 ESF RESET CONTROL DESIGN DEFICIENCY M%2252 B-66 NATURAL CIRCULATION COOLDOMN 12/21/82C 06/26/85C 11/15/84C 07/28/82C 01/05/82C 06/26/83C M%6860 B-69 IEB 80-0 MAINSTEAM LINE BREAK HITH CONTINUED FEEDW 01/17/83C M%9760 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16)
M51325 B-74 THERMAL SHIELD FOLLOH UP ANALYSIS 03/02/84C 03/14/84C M52802 B-76 ITEM 1.1 POST TRIP REVIEW)
PROGRAM DESCRIPTION 12/17/85C M52883 B-77 ITEM 2.1 EQUIPMENT CLASSIFICATION & VENDOR INTER 00/15/86 M52960 B-78 ITEMS 3.1.1
& 3.1.2 "POST MAINTENANCE TEST PROCEDU 12/23/85C M53065 B-79 ITEM 3.1.3 POST MAINTENANCE TESTING CHANGES TO 10/25/85C M53100 B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY VENDO 12/17/85C M53153 B"81 ITEMS 4.2.1
& 4.2.2
-PREVENTATIVE MAINT PROG FOR R
05/15/86
k-1208731-001 iT LUCIE 1
REGULATORY INFORMATION TRACKING SYSTEM FAG I L I TY IMP L EMENTAT I ON (CONTINUATION)
PAGE NO.:
4464 03/31/86 I'AC NO.
NPA t 145098 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 147634 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 147705 F-24 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 147776 F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR LIC ACT
~CONP L ET 01/07/82C 08/23/83C 08/23/83C 08r23r83C LICENSEE STATUS DATE F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE 06/20/85C 145168 146905 F-30 II.K.2.13 THERMAL-MECHANICALREPORT 06/06/84C 10/05/83C 10/06/83C 10/06/83C 1447816 F-33 II.K.2.17 POTENTIAL FOR VOIDING IN RCS F-36 II.K.3.1 AUTO PORV ISOLATION 145266 145312 F-37 II.K.3.2 REPORT ON PORV FAILURES 145378 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 04/06/82C 545433 F-39 II.K.3.5 AUTO TRIP OF RCPS 545664 F-47 II.K.3.17 ECCS OUTAGES Vi8449 F-53 II.K.3.25 POHER ON PUMP SEALS 145861 F-57 II.K.3.30'B LOCA METHODS 148200 F-58 II.K.3. 31 COMPLIANCE NITH 1 0 CFR 50. 46 1445980 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 146051 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 146267 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE
'146339 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 146410 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 846479 F"70 III.D.3,4 CONTROL ROOM HABITABILITY 846123 F"65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 946195 F-66 III.A.1.2 NUCLEAR DATA LINK 02/08/83C 08/08/83C 09/30/82C 06/26/85C 06/26/85C 07/15/86 07/15/86 07/15/86 07/30/82C 05/11/83C 07/15/86 02/23/82C 03/11/82C
R-1208731-001 ST LUCIE 1
REGULATORY INFORMATION TRACKING SYSTEM FACILITY IMP L EMENTATI ON (CONTINUATION)
PAGE NO.:
665 03/31/86 TAC NO.
MPA TITLE LIC ACT
~COMP ET LICENSEE STATUS
~DAT M56167 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWUP TO 05/15/86 MCI9693 G-01 REACTOR COOLANT PUMP TRIP (D660 II.K.3.5) 06/15/86
R-1208731-001 ST LUCIE 1
REGULATORY INFORMATION TRACKING SYSTEM FACILITY IMPLEMENTATION (CONTINUATION)
PAGE NO.:
462 03/31/86 TAC NO.
/PA TITLE LIC ACT
~COMP LET LICENSEE STATUS
~AT M54571 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-06/21/85C M53635 B"85 SALEM ATWS 1.2 DATA CAPABILITY M53718 B"86 SALEM ATWS 2.2 S-R COMPONENTS M53801 B-87 SALEM ATWS 3.2.1
& 3.2.2 S-R COMPONENTS M53884 M53940 B-88 I
B-89 SALEM ATWS 3.2.3 T.S.
S-R COMPONENTS SALEM ATWS 4.2.3
& 4.2.4 LIFE COMPONENTS M54111 B-92 SALEM ATWS 4.5.1 DIVERSE TRIP FEATURES M54028 B-93 SALEM ATWS 4.5.2
& 4.5.3 TEST ALTERNATIVES 04/15/86 12/01/86 12/17/86 10/25/85C 12/31/86 12/17/85C 12/01/86 M08250 C-01 PWR.SECONDARY WATER CHEMISTRY MONITORING REQUIREME 04/16/82C M08924 C-06 PUMP SUPPORT-LAMELLAR TEARING M08911 C-07 FUEL HANDLING ACCIDENT INSIDE CONTAINMENT 04/17/81C 04/27/79C M08083 C"10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 03/04/85C M10469 C-12 BORON SOLUBILITY DURING LONG TERM COOLING FOLLOWIN 03/29/82C M43648 C-14 AUXILIARYFEEDWATER SEISMIC QUALIFICATION 11/08/82C 152273 C-15 CONTROL OF HEAVY LOADS PHASE II (FOLLOWUP OF MPA 06/28/85C 158091 C-16 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN 12/11/85C 308915 D-06 PEAKING MODEL CHANGE FOR CE REACTOR CORE M08923 D-10 ASYMMETRIC LOCA LOADS M1 01 01 D-11 FISSION GAS RELEASE 05/26/78C 06/15/86 10/13/78C M12319 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 01/31/84C M43034 D-17 DEFINITION OF OPERABLE 05/28/81C M55905 D-19 DIESEL GENERATOR RELIABILITYTECH SPECS (GL 84-15) 03/15/86 M11306 E-03 CORE RELOADS REQUIRING PRIOR NRC APPROVAL 05/27/79C
R-1208731-001 ST LUCIE 1
REGULATORY INFORMATION TRACKING SYSTEM FACIL ITY IMP L EMENTATI ON (CONTINUATION)
PAGE NO.-'c463 03/31/86 e
~
TAC NO.
MPA TITLE 808918 E-06 CEA POSITION INDICATION FAILURES CE M11308 E-07 REACTOR PROTECTION SYSTEM LOGIC CE M64050 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR MI0125 F"02 I.A.1.3 SHIFT MANNING M%4196 F-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINING LIC ACT
~COMP ET Oc4/27/82C 03/31/82C 01/26/82C 06/30/83C 03/26/82C LICENSEE STATUS
~DAT M%0267 F-00 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 06/07/80C M44337 F"05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG 05/15/86 M%7250 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 02/04/82C M%7322 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI 02/04/82C M51205 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRA 10/10/84C M51285 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM M66006 F=10 II.B.1 RCS HIGH POINT VENTS M%7973 F-11 II.B. 2 PLANT SHIELDING MQ4475 F-12 II.B.3 POST ACCIDENT SAMPLING M60566 F-13 II.B.O TRAINING FOR MITIGATING CORE DAMAGE M%4617 F-14 II.D.1 RV AND SV TRAINING
'.%4667 M%3378
'1%4768 M44810 F-1 5 I I. E. 1. 1 AFH SYSTEM EVALUATION F-16 II.E. 1. 2. 1 AFH SYSTEM INITIATION F-17 II.E.1.2.2 AFH SYSTEM FLOH INDICATION F-18 II.E.6.1 DEDICATED HYDROGEN PENETRATION M%4956 1%5027 F-20 II.F.1.1 NOBLE GAS MONITOR F-21
-II.F.1.2 IODINE/PARTICULATE SAMPLING
- 16%885 F-19 II.E.0.2 CONTAINMENT ISOLATION DEPENDABILITY 06/11/85C 09/16/83C 01/10/83C 09/28/83C 03/20/82C 06/15/86 09/10/82C 09/16/82C 09/10/82C 10/20/81C 05/27/83C 12/09/81C 12/09/81C
R-1208731-001 FACILITY: ST LUCIE 2 REGULATORY INFORMATION TRACKING SYSTEM FACI L ITY IMP L EMENTATI ON PAGE NO.-'466 r
03/31/86 f
PLANT LOCATION-'2 MI SE OF FT.
PIERCE>
FLA DOCKET NUMBER:
050-00389 ARCH/ENGINEER:
EBASCO IE INSPECTOR:
R.
CRLENJAK LICENSED POWER:
2700 MWT DESIGN POWER:
0830 MWE NSSS VENDOR:
COMB PROJECT MANAGER: D.
SELLS BRANCH CHIEF-A. THADANI LIC. ASSISTANT:
P.
KREUTZER TAC NO.
MPA TITLE LIC ACT COMPL ETE LICENSEE STATUS
~DAT M51136 A-17 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDEN 05/15/86 M55743 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-03) 12/06/85C M59145 A-20 10 CFR 50.62 OPERATING REACTOR REVIEWS M59986 A-21 10 CFR 50.61'RESSURIZED THERMAL SHOCK RULE 06/15/86 06/30/86 B-80 ITEM 4.1 REACTOR TRIP SYSTEM RELIABILITY VENDO 12/17/85C M53101 M53154 M50572 ITEMS 4.2.1
& 0.2.2 "PREVENTATIVE MAINT PROG FOR R
TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-05/15/86 06/21/85C 04/15/86 12/01/86.
12/17/85C 10/25/85C 12/31/86 12/17/85C 12/01/86 B-81 B-83 M53636 B-85 SALEM ATWS 1.2 DATA CAPABILITY M53719 B-86 SALEM ATWS 2.2 S-R COMPONENTS M53802 B-87 SALEM ATWS 3.2.1
& 3.2.2 S-R COMPONENTS M53885 B-88 SALEM ATWS 3.2.3 T.S.
S-R COMPONENTS B-89 SALEM ATWS 6.2.3
& 4.2.l LIFE COMPONENTS M53901 M54112 SALEM ATWS 4.5.1 DIVERSE TRIP FEATURES SALEM ATWS 4.5.2
& 6.5.3 TEST ALTERNATIVES B-92 M54029 B-93 M52270 C-15 CONTROL OF HEAVY LOADS PHASE II (FOLLOWUP OF MPA 06/28/85C M58092 C-16 UTILITY.RESPONSES TO STAFF RECOMMENDATIONS CONCERN 12/11/85C M52803 B-76 ITEM 1.1 POST TRIP REVIEWs PROGRAM DESCRIPTION 12/17/85C M52886 B-77 ITEM 2.1 EQUIPMENT CLASSIFICATION & VENDOR INTER 04/15/86 M52965 B"78 ITEMS 3.1.1
& 3.1.2
-POST MAINTENANCE TEST PROCEDU 12/23/85C M53046 B-79 ITEM 3.1.3 POST MAINTENANCE TESTING CHANGES TO 10/25/85C
I
-1208731-001 T LUCIE 2 REGULATORY INFORMATION TRACKING SYSTEM FACIL ITY IMP L EMENTAT I ON (CONTINUATION)
PAGE NO.:
467 I
03/31/86 AC NO MPA TITLE LIC ACT
~CONPL ET LICENSEE STATUS DATE 55906 D-19 DIESEL GENERATOR RELIABILITYTECH SPECS (GL 84-15) 05/15/86 51206 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRA 10/10/84C 51286 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 51605 F-14 II.D.1 RV AND SV TRAINING 54982 F-30 II.K.2.13 THERMAL-MECHANICALREPORT 57574 F-58 II.K.3.31 COMPLIANCE WITH 10 CFR 50.46 59275 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 06/11/85C 06/15/86 06/06/84C 06/26/85C 07/15/86 56168 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWUP TO 05/15/86 59411 G-01 REACTOR COOLANT PUMP TRIP (D660 II.K.3.5) 06/15/86