Text
I I ~
l Docket Nos.
50-335 and 50-389 Mr.
C. 0.
Woody Group Vice President Nuclear Energy I'lorida Power & Light Company P.
0.
Box 14000 Juno Beach, Florida 33408 Distribution:
s NRC & L PDRs Branch Files OELD ACRS 10 EJordan JPartlow BGrimes PKreutzer FMiraglia ETourigny HDenton/DEisenhut DCrutchfield ORAS TBarnhart 8 OPA LFMB NThompson, DHFT
Dear Mr. Woody:
SUBJECT'SE OF AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) CODE CASE N-416 FOR ST.
LUCIE PLANT, UNITS 1 AND 2 By letter dated May 28, 1986, you requested authorization to use ASME Code Case N-416, "Alternative Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping,Section XI, Division I," at the St.
Lucie Plant, Units 1 and 2.
The staff has reviewed your request and determined that Code Case N-416 is an acceptable Code Case which is approved as written with no additional requirements other than those specified in the Code Case.
The Code Case is expected to be endorsed by the NRC in a future revision of Regulatory Guide
- 1. 147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1."
Code Case N-416 may, therefore, be used at the St.
Lucie Plant, Units 1 and 2
with the limitations stated in the "Inquiry" and "Reply" sections of the Code Case.
This conclusion is based upon our determination that Code Case N-416 provides an acceptable level of quality and safety which is required pursuant to 10 CFR 50.55a(a)(3).
Furthermore, the use of the Code Case should be documented in a future revision to the FSAR for St.
Lucie Plant, Units 1 and 2.
Sincerely,
/S/
Ashok C. Thadani, Director PWR Project Directorate ¹8 Division of PWR Licensing-B cc:
See next page
~See previous white for concurrences PWR¹8" PKreutzer
'/28/86 PWR¹8" DJaffe;eh 5/28/86 PBEB Q OELD" CYCheng McGurren 5/28/86 5/28/86 PWR¹8 A hadani I~Pss 8606020067 860528 PDR ADOCK 05000335 PDR
I r
J.
i I
I I
'a ~'
I 1
I l
I 1
Docket Nos.
50-335 and 50-389 Mr.
C.
O.
Woody Group Vice President Nuclear Energy Florida Power 8 Light Company P.
0.
Box 14000 Juno Beach, Florida 33408 Distribution:
Docket Files NRC 8
L PDRs Branch Files OELD ACRS 10 EJordan JPart'low BGrimes PKreutzer FMiraglia ETourigny HDenton/DEisenhut DCrutchfield ORAS TBarnhart 8 OPA LFMB NThompson, DHFT
Dear Mr. Woody:
SUBJECT:
USE OF AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) CODE CASE N-416 FOR ST.
LUCIE PLANT, UNITS 1 AND 2 By letter dated May 28, 1986, you requested authorization to use ASME Code Case N-416, "Alternative Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping,Section XI, Division I," at the St.
Lucie Plant, Units 1 and 2.
The staff has reviewed your request and determined that Code Case N-416 is an acceptable Code Case which is approved as written with no additional requirements other than those specified in the Code Case.
The Code Case is expected to be endorsed by the NRC in a future revision of Regulatory Guide
- l. 147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1."
Code Case N-416 may, therefore, be used at the St.
Lucie Plant, Units 1 and 2
with the limitations stated in the "Inquiry" and "Reply" sections of the Code Case.
Furthermore, the use of the Code Case should be documented in a future revision to the FSAR for St.
Lucie Plant, Units 1 and 2.
Sincerely, cc:
See next page Ashok C. Thadani, Director PWR Project Directorate ¹8 Division of PWR Licensing-B PQR88 zer
~'/~/88 PW ETouri gny, eh q Q-/86 p'ELD p~
3 /~ /86 PWR¹8 AThadani
/
/86 D: DPL-B FMiraglia
/
/86
Mr.
C. 0.
Woody Florida Power 8 Light Company St.
Lucie Plant CC:
Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector c/o U.S.
NRC 7585 S.
Hwy A1A Jensen Beach, Florida 33457 State Planning 8 Development Clearinghouse Office of Planning 8 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Harold F. Reis, Esq.
Newman 8 Holtzinger 1615 L Street, N.W.
Washington, DC 20036 Norman A. Coll, Esq.
McCarthy, Steel, Hector and Davis 14th Floor, First National Bank Building Miami, Florida 33131 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tal 1 ahassee, Florida 32301 Mr. Weldon B. Lewis, County Administrator St.
Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington - Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue
- Bethesda, Maryland 20814 Mr. Allan Schubert, Manager Public Health Physicist Department of Health and Rehabilitative Services 1323 Winewood Blvd.
Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Executive Director for Operations 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323