Forwards Insp Rept 50-335/86-01 on 860108-09 & 0225-26 & Notice of Violation.No Civil Penalty Re Radiological Controls for Steam Generator Work Proposed Based on Prior Good Performance
ML17216A511
Person / Time
Site: Saint Lucie 
Issue date: 04/24/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17216A512 List:
References
EA-86-053, EA-86-53, NUDOCS 8605050557
Download: ML17216A511 (6)


See also: IR 05000335/1986001

Text

APR24 586

Docket No. 50-335

License

No.

DPR-67

EA 86-53

Florida Power

and Light Company

ATTN: Pr.

C.

O.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

Fl

33408

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NO. 50-335/86-01)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

on

January

8-9 and February 25-26,

1986, at your St.

Lucie facility.

As

a result of

this inspection, signific.nt failures to comply with NRC regulatory requirements

were identified,

and accordingly,

an Enforcement

Conference

to discuss

these

matters

was held in Miami, Florida on February

25,

1986.

The violations described

in the enclosed

Notice of Violation include the failure

to establish

radiological control. procedures

for steam generator

work and to

perform adequate

surveys (evaluations)

of individual exposures

during the

steam generator

work.

The

NRC is concerned that these violations, collectively,

caused

a significant potential for personnel

exposures

in excess

of NRC limits.

You stated during the Enforcement

Conference

of February

25,

1986, that the root

cause of this event

was the underresponse

of your, direct reading dosimeters

when

they were exposed parallel to the radiation field.

In our view,

a more basic

cause of this event

was failure to establish

procedures

and to perform adequate

surveys prior to the sludge lancing work.

In accordance

with the "General

Statement

of Policy and Procedure

for NRC

Enforcement Actions,"

10 CFR Part 2, Appendix

C ( 1985), the violations have

collectively been categorized

as

a Severity Level III problem.

Normally,

a

civi 1 penalty is considered for a Severity Level III violation.

After

consultation with the Director, Office of Inspection

and Enforcement,

I have

decided that

a civil penalty will not be proposed

in this case

because

of your

good prior performance

in the area of concern

as indicated

by the absence

of

significant violations

and by Category

1 ratings in the Radiological

Controls

area during your three

most recent

Systematic

Assessment

of Licensee

Performance

(SALP) periods.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your response,

you should document

the specific actions

taken

and any additional actions you

plan to prevent recurrence.

After reviewing your response

to this Notice,

including your proposed corrective actions,

the

NRC will determine

whether

CERTI FIED MAIL

QII

8605050557

860424

PDR

  • DOCK 05000335

8'DR

t

~"3P'::~ <, A')A

Fl'orida Power

and Light Company

APpgg

@

further

NRC enforcement

action is necessary

to ensure

compliance with NRC

regulatory requirements.

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the NRC's Public Oocument

Room.

The responses

directed

by this letter and the enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget as required

by the

Paperwork Reduction Act of 1980,

PL 96-511.

Sincerely,

Original signed gy

R. D. Walker

J.

Nelson

Grace

Regional Administrator

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

No. 50-335/86-01

cc w/encls:

I

. Harris, Vice President

S

. Lucie Nuclear Plant

. A. Sager,

Plant Manager

LN

ms, Site

gA Superintendent

4f ~

Florida Power and Light Company

3

APR20,586

Ofstribution

, NSIC

LPDR

,AC

A

JHTaylor,

IE

9Yollmer, IE

jPRobinson,

IE

"JN

ace,

RII

erman,

ELD

niezek,

OED/ROGR

FIngram,

PA

~ nfor ament

Coo

tnatora

II8; QBV'RV

C

el ly, OIA

aye

, OI

HD

on,

NRR

rooks,

AEOD

. )Jordan,

IE

Jhsident Inspector

t

~ gegi

1 Distribution

e Public Utility Conmission

ate Attorney General

IE:EA

IE: ES

'EDO Rdg File

DCS

IE:Ef~

PRob nson

4/ )i /86

GRJ

ins

04/g9/86

pre

RA:R~

JNGrate

4/p/86

RII

JPS

hr

04/g/86

JLi

erman

4/ii /86

4Q /86

t

E

~I

e rad

er

4/ @f86

/~ /86

O4/a,tt'86

I

JT

l r

4/

6

'I

~ '

(l

q g

H