Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:63060 + (19:45:00, 8 January 2025)
- ML17221A576 + (19:45:01, 8 January 2025)
- IR 05000335/1987026 + (19:45:03, 8 January 2025)
- L-87-542, Responds to Violations Noted in Insp Repts 50-335/87-23 & 50-389/87-22.Corrective Actions:Procedures in Control Room Updated by QC Document Personnel + (19:45:05, 8 January 2025)
- ML17221A573 + (19:45:05, 8 January 2025)
- L-87-541, Forwards NSHC & Administrative Corrections to Tech Specs Re Pump & Valve Testing Program to Support 871116 Application to Amend Licenses DPR-67 & NPF-16 + (19:45:07, 8 January 2025)
- 05000389/LER-1987-007-02, :on 871125,reactor Tripped on Loss of Load Due to Turbine Trip Caused by Failure of Main Generator Exciter Bearing.Root Cause Is Personnel Error.Electrical Maint Personnel Trained & Procedures Revised + (19:45:09, 8 January 2025)
- L-87-519, Responds to NRC Request for Addl Info Re Util 870612 Request for License Amend.Util Requested to Address 10CFR51.52 Concerning Environ Effects of Transportation of Fuel & Waste for Proposed Rerack of Spent Fuel Pool + (19:45:10, 8 January 2025)
- ML17221A568 + (19:45:11, 8 January 2025)
- L-87-525, Application for Amends to Licenses DPR-67 & NPF-16,changing Tech Specs to Modify Requirements to Perform Moderator Temp Coefficient Test Near End of Each Cycle.Safety Evaluation Also Encl.Fee Paid + (19:45:12, 8 January 2025)
- ML17221A565 + (19:45:13, 8 January 2025)
- L-87-524, Application for Amend to License NPF-16,changing Action Statement for Tech Spec 3.7.1.6 to Allow 72 H to Restore Inoperable,Open Main Feedwater Isolation Valve.Safety Evaluation Determination of NSHC Also Encl.Fee Paid + (19:45:14, 8 January 2025)
- 05000389/LER-1987-008-03, :on 871128,oil Fire Occurred at Reactor Coolant Pump (Rcp).Caused by Oil Leak from Loose Packing Gland on Instrument Isolation Valve.Leaking Valve Repaired.Visual Insp & Leak Test Conducted on 2A1 RCP Oil Pans + (19:45:16, 8 January 2025)
- L-87-526, Responds to Violations Noted in Insp Repts 50-335/87-27 & 50-389/87-26.Corrective Actions:All Personnel Instructed in Strict Adherence to Radiation Protection Procedures & Signs Posted Re Consequences of Not Following Procedures + (19:45:17, 8 January 2025)
- L-87-537, Forwards Revised Responses to Questions 2,6 & 7 Re Replacement of Spent Fuel Racks,Per NRC 870716 Request for Addl Info & Subsequent Discussions W/Util + (19:45:19, 8 January 2025)
- L-87-536, Responds to NRC 871023 Request for Addl Info Re Util 870612 Proposed License Amend to Permit Replacement of Spent Fuel Pool Racks to Ensure That Sufficient Future Capacity Exists for Storage of Spent Fuel + (19:45:20, 8 January 2025)
- L-87-535, Forwards Revised Response to Questions Re Spent Fuel Pool Rerack Design Analysis.Potential for rack-to-wall Impact Considered in Fuel Rack Models.Analysis of Pool Walls for Impact Loading Not Required + (19:45:22, 8 January 2025)
- L-87-538, Responds to NRC 871125 Request for Addl Info Re Util 870612 Proposed License Amend Re Replacement of Spent Fuel Pool Racks to Ensure That Sufficient Future Capacity Exists for Storage of Spent Fuel + (19:45:23, 8 January 2025)
- ML17221A554 + (19:45:26, 8 January 2025)
- ML17221A552 + (19:45:27, 8 January 2025)
- L-87-514, Responds to Violations Noted in Insp Repts 50-335/87-21 & 50-389/87-20.Corrective actions:in-core Instrumentation Straightened & Acceptance Criteria Met Prior to Head Reassembly.Alignment Method Procedure Will Be Revised + (19:45:31, 8 January 2025)
- L-87-512, Forwards Results of Nonradiological Confirmatory Measurements Samples Analyzed During Insp Rept 50-335/87-24 & 50-389/87-23,per Wj Ross Request.Part of Sample 86C Sent to Bnl.Results of Analysis Requested + (19:45:32, 8 January 2025)
- 05000389/LER-1986-011, :on 860709,emergency Diesel Generator 2A Taken Out of Svc Due to Failure to Meet Required Start Time.Caused by Excessive Tightening of Friction Clutch Locknut.Cooling Fan Shroud Removed & Fan Repositioned + (19:45:34, 8 January 2025)
- ML17221A548 + (19:45:37, 8 January 2025)
- ML17221A547 + (19:45:38, 8 January 2025)
- L-87-509, Discusses Status of Completion of Spds/Safety Assessment Sys Periodic Update.Ei Intl Hardware Design Finalized at End of Nov 1987 & Software Modules Continue to Be Integrated W/ Overall Sys Configuration + (19:45:39, 8 January 2025)
- ML17221A543 + (19:45:41, 8 January 2025)
- IR 05000483/2017404 + (19:45:42, 8 January 2025)
- ML17221A539 + (19:45:44, 8 January 2025)
- ML17221A538 + (19:45:45, 8 January 2025)
- ML17221A536 + (19:45:46, 8 January 2025)
- ML17221A534 + (19:45:47, 8 January 2025)
- ML17221A532 + (19:45:48, 8 January 2025)
- 05000335/LER-1987-016-02, :on 871029,reactor Tripped Due to Loss of Condensate Pump.Caused by Inadequate Operating Procedure. Procedure Being Revised.Plant Training Dept Will Review Loss of Condensate Pump + (19:45:49, 8 January 2025)
- ML17221A530 + (19:45:51, 8 January 2025)
- L-87-482, Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Recent Low Temp Overpressure Protection Analysis.Nrc Approval Requested Prior to Plant Reaching 32 Efpys.Fee Paid + (19:45:52, 8 January 2025)
- ML17221A526 + (19:45:54, 8 January 2025)
- ML17221A523 + (19:45:57, 8 January 2025)
- L-87-462, Application for Amend to License NPF-16,revising Tech Specs on Surveillance Requirements for MSIVs & Main Feedwater Isolation Valves.Fee Paid + (19:45:58, 8 January 2025)
- ML17221A522 + (19:45:58, 8 January 2025)
- ML17221A519 + (19:46:00, 8 January 2025)
- ML17221A518 + (19:46:01, 8 January 2025)
- ML17221A516 + (19:46:02, 8 January 2025)
- ML17221A515 + (19:46:03, 8 January 2025)
- ML17221A514 + (19:46:04, 8 January 2025)
- ML17221A512 + (19:46:06, 8 January 2025)
- ML17221A511 + (19:46:07, 8 January 2025)
- L-87-469, Application for Amend to License DPR-67,changing Tech Specs Re Pump & Valve Program.Nrc Requested to Approve Amend by 880115 Since First 10-yr Insp Interval Ends 880211 + (19:46:08, 8 January 2025)
- ML17221A509 + (19:46:08, 8 January 2025)
- L-87-477, Informs NRC That motor-operated Valve Testing Scheduled Completion Date of 871114,not Met.Valves Will Be Tested When Conditions Can Be Established During Startup from Cycle 3/4 Refueling Outage + (19:46:10, 8 January 2025)
- TAC:66367 + (19:46:12, 8 January 2025)